Percent Design. 1. Following completion of the PDR, Consultant shall quickly proceed with development of the 60 percent design documents. 60 percent design services include: a. Further development of design documents and select specification; drawings anticipated for inclusion in the submittal have been identified in the drawing list (see Section 4.0 - Drawing List.) b. Internal quality control review and comment incorporation. c. Updates to the design schedule. 2. An overview of the 60 percent documents (via 3D model review), and a discussion of preliminary City comments shall be presented at the 60 percent Design Review Workshop. 3. City comment review log shall be maintained to document all City review comments and associated design team responses/actions to address the comments.

Appears in 1 contract

Sources: Professional Services

Percent Design. 1. Following completion of the PDR60 percent Design Phase, Consultant shall quickly proceed with development of the 60 90 percent design documents. 60 90 percent design services include: a. Further development of design documents and select specificationcomplete specifications; drawings anticipated for inclusion in the submittal have been identified in the drawing list (see Section 4.0 - Drawing List.) b. Internal quality control review and comment incorporation. c. Updates to the design schedule. 2. An overview of the 60 90 percent documents (via 3D model review), and a discussion of preliminary City comments shall be presented at the 60 90 percent Design Review Workshop. 3. City comment review log shall be maintained to document all City review comments and associated design team responses/actions to address the comments.

Appears in 1 contract

Sources: Professional Services