Percentage Calculation. Each percentage point described in Section 8.4.2.1 through 8.4.2.4 shall be measured in tenths of a percentage, with percentages less than 0.49% constituting the lower percentage value and percentages greater than or equal to 0.50% constituting the immediately higher percentage value (e.g., 5.149% would be 5.1% and 5.150% would be 5.2%), excepting only that the lowest percentage shall be the absolute minimum.
Appears in 2 contracts
Sources: Engineering, Procurement and Construction Agreement (Ada-Es Inc), Engineering, Procurement and Construction Agreement (Ada-Es Inc)