Common use of Performance Test Clause in Contracts

Performance Test. Upon submission of the Completion Certificate, the WDO shall be required to carry out tests on the Washery as specified below, at the cost and expense of the WDO. 16.3.1 The WDO shall notify the Authority of the readiness of the Washery for conducting performance tests and indicate a trial window of 7 (seven) Days during which the trial runs shall be conducted. 16.3.2 The trial runs shall be conducted in the presence of the designated Engineer in Charge of Authority or their authorized representative. 16.3.3 In a continuous period of 72 (seventy-two) hours, the Washery should demonstrate achievement of the performance criteria - minimum Throughput of 16,500 (sixteen thousand and five hundred) tonnes b) the Washery operations during the test period should conform to the DPR submitted by the WDO along with the Completion Certificate; and c) the Engineer in Charge may conduct a physical verification of the assets /P&M present at the Washery and tally them with the provisions made in the DPR submitted with the Completion Certificate. 16.3.4 The Authority shall ensure to supply required quantity of coal corresponding to 7 (seven) Days of ACQ to the WDO for the trial runs. 16.3.5 In case the WDO fails to meet the performance criteria then the Engineer in Charge or his authorized representative may establish any defects or deficiencies in the Washery and WDO shall take such remedial measures as would be necessary to address the defects or deficiencies and notify the Authority of its readiness for conduct of performance tests. The Engineer in Charge of the Authority will issue a Performance Certificate only upon satisfactory completion of the processes set out in Clause 16.3.

Appears in 2 contracts

Sources: Washery Development and Operations Agreement, Washery Development and Operations Agreement

Performance Test. Upon submission of the Completion Certificate, the WDO shall be required to carry out tests on the Washery as specified below, at the cost and expense of the WDO. 16.3.1 The WDO shall notify the Authority of the readiness of the Washery for conducting performance tests and indicate a trial window of 7 (seven) Days during which the trial runs shall be conducted. 16.3.2 The trial runs shall be conducted in the presence of the designated Engineer in Charge of Authority or their authorized representative. 16.3.3 In a continuous period of 72 (seventy-two) hours, the Washery should demonstrate achievement of the performance criteria - minimum Throughput of 16,500 13,200 (sixteen thirteen thousand and five two hundred) tonnes b) the Washery operations during the test period should conform to the DPR submitted by the WDO along with the Completion Certificate; and c) the Engineer in Charge may conduct a physical verification of the assets /P&M present at the Washery and tally them with the provisions made in the DPR submitted with the Completion Certificate.. s 16.3.4 The Authority shall ensure to supply required quantity of coal corresponding to 7 (seven) Days of ACQ to the WDO for the trial runs. 16.3.5 In case the WDO fails to meet the performance criteria then the Engineer in Charge or his authorized representative may establish any defects or deficiencies in the Washery and WDO shall take such remedial measures as would be necessary to address the defects or deficiencies and notify the Authority of its readiness for conduct of performance tests. The Engineer in Charge of the Authority will issue a Performance Certificate only upon satisfactory completion of the processes set out in Clause 16.3.

Appears in 1 contract

Sources: Washery Development and Operations Agreement