Permit Set Sample Clauses

Permit Set. 1. Drawings and specifications, ready for permitting, hard copy and electronic. 2. Final estimate of construction cost
Permit Set. The A/E shall advance the Design Development Drawings into a permit set of construction documents (“Permit Set”). The A/E shall incorporate into the Permit Set the design requirements of governmental authorities having jurisdiction over the Project. In addition, the A/E shall (a) define, clarify, or complete the concepts and information contained in the Permit Set; (b) correct design errors or omissions, ambiguities, and inconsistencies in the Permit Set (whether found prior to or during the course of construction); and (c) correct any failure of the A/E to follow written instructions of the Department during any phase of design services or the construction of the Project provided they are compatible with industry standards.
Permit Set. The A/E shall advance the Design Development Drawings into a permit set of construction documents (“Permit Set”). The A/E shall incorporate into the Permit Set the design requirements of governmental authorities having jurisdiction over the Project. In addition, the A/E shall (a) define, clarify, or complete the concepts and information contained in the Permit Set;
Permit Set. 1 Based on the approved design development documents as well as any approved value engineering, the Architect shall prepare the Permit Set. The Permit Set shall represent the further progression of the approved design development documents together with any value engineering strategies approved by the Department. The Permit Set will be construction documents progressed to approximately 75% completion of those required in a traditional Design/Bid/Build delivery method. The Permit Set will be code compliant and permit ready, with all major systems sufficiently designed, detailed, specified, coordinated, and developed.
Permit Set. On or before eighty-two (82) days after the Space Plan Approval Date, Tenant’s architect shall prepare and submit to Landlord for approval a set of plans in sufficient detail to allow for application to the City of ▇▇▇▇▇▇▇▇ for a building permit for Landlord’s Work (the “Permit Set”). To the extent the Permit Set is in substance consistent with the Space Plan, then Landlord shall not unreasonably delay, condition or withhold its approval of the Permit Set. Any variations in substance between the Permit Set and the Space Plan will be subject to Landlord’s separate review and considered as an alteration to the Space Plan. Landlord will cooperate and respond promptly (which means within ten (10) days of receipt; failing which the Permit Set shall be deemed approved) to give Tenant either its approval or any suggestions for changes to the Permit Set and Landlord shall give final approval of the Permit Set for this phase to be completed. Promptly after approval of the Permit Set, Landlord shall file an application for a building permit for Landlord’s Work.
Permit Set. Section 3.1.1
Permit Set 

Related to Permit Set

  • Unbundled Sub-Loop Feeder 2.8.4.1 Unbundled Sub-Loop Feeder (USLF) provides connectivity between BellSouth's central office and cross-box (or other access point) that serves an end user location. 2.8.4.2 USLF utilized for voice traffic can be configured as 2-wire voice (USLF-2W/V) or 4-wire voice (USLF-4W/V). 2.8.4.3 USLF utilized for digital traffic can be configured as 2-wire ISDN (USLF-2W/I); 2-wire Copper (USLF-2W/C); 4-wire Copper (USLF-4W/C); 4-wire DS0 level loop (USLF-4W/D0); or 4-wire DS1 and ISDN (USLF-4W/DI). 2.8.4.4 USLF will provide access to both the equipment and the features in the BellSouth central office and BellSouth cross box necessary to provide a 2W or 4W communications pathway from the BellSouth central office to the BellSouth cross- box. This element will allow for the connection of Global Connection’s loop distribution elements onto BellSouth's feeder system.

  • As-Built Plans Within thirty (30) days after completion of Tenant’s Changes requiring the submission of plans to Landlord, Tenant shall furnish to Landlord a complete set of “as-built” plans and specifications.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • Scope of Interconnection Service 1.3.1 The NYISO will provide Energy Resource Interconnection Service and Capacity Resource Interconnection Service to Interconnection Customer at the Point of Interconnection. 1.3.2 This Agreement does not constitute an agreement to purchase or deliver the Interconnection Customer’s power. The purchase or delivery of power and other services that the Interconnection Customer may require will be covered under separate agreements, if any, or applicable provisions of NYISO’s or Connecting Transmission Owner’s tariffs. The Interconnection Customer will be responsible for separately making all necessary arrangements (including scheduling) for delivery of electricity in accordance with the applicable provisions of the ISO OATT and Connecting Transmission Owner’s tariff. The execution of this Agreement does not constitute a request for, nor agreement to, provide Energy, any Ancillary Services or Installed Capacity under the NYISO Services Tariff or any Connecting Transmission Owner’s tariff. If Interconnection Customer wishes to supply or purchase Energy, Installed Capacity or Ancillary Services, then Interconnection Customer will make application to do so in accordance with the NYISO Services Tariff or Connecting Transmission Owner’s tariff.

  • Purpose of Interconnection Facilities Except as may be required by Applicable Laws and Regulations, or as otherwise agreed to among the Parties, the Interconnection Facilities shall be constructed for the sole purpose of interconnecting the Large Generating Facility to the Participating TO’s Transmission System and shall be used for no other purpose.