DELIVERY: FOB DESTINATION, INSIDE DELIVERY, FREIGHT PAID Whenever possible, contractors should give the ordering entities 3 working days prior notice of any deliveries and/or installations. Furniture contractors will not be responsible for the removal/moving of existing furnishings unless requested by the ordering entity. Contractors should verify site readiness prior to delivery. All deliveries will be made during normal working hours unless otherwise arranged with the ordering entity. Contractor will communicate any scheduling delays and/or changes immediately. Agencies will not be responsible for any freight damage, concealed or otherwise.
Notice to Proceed - Site Improvements The Recipient shall not commence, or cause to be commenced, any site improvements or other work on the Land until the Director has issued a Notice to Proceed to the Recipient. Such Notice to Proceed will not be issued until the Director is assured that the Recipient has complied with all requirements for the approval of a grant under Revised Code Sections 164.20 through 164.27 and has completed any land acquisition required by the Project. A Notice to Proceed shall be required for all Project prime contractors or direct procurement initiated by the Recipient following execution of this Agreement.
Procurement of Recovered Materials In the performance of this contract, the Contractor shall make maximum use of products containing recovered materials that are EPA-designated items unless the product cannot be acquired
Transmission Delivery Service Implications Under ER Interconnection Service, Interconnection Customer will be eligible to inject power from the Generating Facility into and deliver power across the Transmission System on an “as available” basis up to the amount of MW identified in the applicable stability and steady state studies to the extent the upgrades initially required to qualify for ER Interconnection Service have been constructed. After that date FERC makes effective MISO’s Energy Market Tariff filed in Docket No. ER04-691-000, Interconnection Customer may place a bid to sell into the market up to the maximum identified Generating Facility output, subject to any conditions specified in the Interconnection Service approval, and the Generating Facility will be dispatched to the extent the Interconnection Customer’s bid clears. In all other instances, no transmission or other delivery service from the Generating Facility is assured, but Interconnection Customer may obtain Point-To-Point Transmission Service, Network Integration Transmission Service or be used for secondary network transmission service, pursuant to the Tariff, up to the maximum output identified in the stability and steady state studies. In those instances, in order for Interconnection Customer to obtain the right to deliver or inject energy beyond the Point of Interconnection or to improve its ability to do so, transmission delivery service must be obtained pursuant to the provisions of the Tariff. The Interconnection Customer’s ability to inject its Generating Facility output beyond the Point of Interconnection, therefore, will depend on the existing capacity of the Transmission or Distribution System as applicable, at such time as a Transmission Service request is made that would accommodate such delivery. The provision of Firm Point-To-Point Transmission Service or Network Integration Transmission Service may require the construction of additional Network or Distribution Upgrades.
INSPECTION, ACCEPTANCE AND REJECTION a. All shipments of Goods and performance of Services shall be subject to Buyer’s right of inspection. Buyer shall have ninety (90) days (the “Inspection Period“) following the delivery of the Goods at the Delivery Point or performance of the Services to undertake such inspection, and upon such inspection Buyer shall either accept the Goods or Services (“Acceptance“) or reject them. Buyer shall have the right to reject any Goods that are delivered in excess of the quantity ordered or are damaged or defective. In addition, Buyer shall have the right to reject any Goods or Services that are not in conformance with the Specifications or any term of this Agreement. Transfer of title to Buyer of Goods shall not constitute Buyer’s Acceptance of those Goods. Buyer shall provide Supplier within the Inspection Period notice of any Goods or Services that are rejected, together with the reasons for such rejection. If Buyer does not provide Supplier with any notice of rejection within the Inspection Period, then Buyer will be deemed to have provided Acceptance of such Goods or Services. Buyer’s inspection, testing, or Acceptance or use of the Goods or Services hereunder shall not limit or otherwise affect Supplier’s warranty obligations hereunder with respect to the Goods or Services, and such warranties shall survive inspection, test, Acceptance and use of the Goods or Services. b. Buyer shall be entitled to return rejected Goods to Supplier at Supplier’s expense and risk of loss for, at Buyer’s option, either: (i) full credit or refund of all amounts paid by Buyer to Supplier for the rejected Goods; or (ii) replacement Goods to be received within the time period specified by Buyer. Title to rejected Goods that are returned to Supplier shall transfer to Supplier upon such delivery and such Goods shall not be replaced by Supplier except upon written instructions from Buyer. Supplier shall not deliver Goods that were previously rejected on grounds of non-compliance with this Agreement, unless delivery of such Goods is approved in advance by Buyer, and is accompanied by a written disclosure of Buyer’s prior rejection(s).