Summer Session A. All ASEs employed in the Summer Session shall receive the same general range adjustment as ASEs received in the preceding Fall term. B. The following articles apply to ASEs who are employed in the summer session: Recognition, Wages (range adjustment only), DCP, Travel, Health and Safety, Leaves, Holidays, Duration, Workspace and Instructional Support, Parking, Grievance and Arbitration, Waiver, Management and Academic Rights, No Strikes, Non-Discrimination, Union Access and Rights, Union Security, Discipline and Dismissal, Emergency Layoff, Employment Files and Evaluations, Definitions, Severability, Labor-Management Meetings, and Classifications. C. The remainder of the articles in the agreement does not apply to ASEs who are employed in the summer session. D. The topic of Summer Session, and effects of changes on terms and conditions of employment for ASEs employed in Summer Session, shall be reopened for bargaining commencing no later than January 2, 2001.
Agreement Exceptions/Deviations Explanation If the proposing Vendor desires to deviate form the Vendor Agreement language, all such deviations must be listed on this attribute, with complete and detailed conditions and information included. TIPS will consider any deviations in its proposal award decisions, and TIPS reserves the right to accept or reject any proposal based upon any deviations indicated below. In the absence of any deviation entry on this attribute, the proposer assures TIPS of their full compliance with the Vendor Agreement.
Phase II A small portion of the work for the Phase II modifications to the Plattsburgh Substation will be performed by Transmission Owner, and the remainder will be performed by Clinton and ▇▇▇▇▇▇▇▇▇. A detailed definition of the specific scope for Transmission Owner and Clinton and ▇▇▇▇▇▇▇▇▇ including interface points shall be defined during the design phase and, as such documents become available, copies will be delivered to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The full scope includes the installation of wave traps, CCVT’s and modifications and/or additions to relaying on the MWP-1 and MWP- 2 lines. These lines will be reconfigured at the completion of Phase II to connect to ▇▇▇▇▇ and ▇▇▇▇▇▇▇ Substations on MWP-1 and the ▇▇▇▇ Substation on MWP-2. Clinton and ▇▇▇▇▇▇▇▇▇ will design the upgrades and purchase the materials based on the outline specification that was prepared and issued by Transmission Owner. The work to be performed by Clinton and ▇▇▇▇▇▇▇▇▇ will include both the materials for the exterior and interior installations and items for Transmission Owner installation inside the control building in existing relay panels and communication racks. In addition, Clinton and ▇▇▇▇▇▇▇▇▇ will be responsible for the exterior and interior construction work and will provide construction management services in coordination with Transmission Owner. The civil design for the foundations and the electrical design for the cable runs to the control room will be designed by, as approved by Transmission Owner, and installed under the supervision and control of Clinton and ▇▇▇▇▇▇▇▇▇. The equipment will be selected and procured in accordance with the specifications developed during the detailed engineering phase, copies of which shall be furnished to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The construction of the foundations, structures, wave traps, CCTV and cable runs into the control building to the termination cabinets will be completed by Clinton and ▇▇▇▇▇▇▇▇▇. The work at the Plattsburgh Substation will be installed under Transmission Owner’s CPP-1. Transmission Owner will provide Protection and Controls Engineering, install and terminate wiring from the termination cabinets to the control panels and relays, install relays and equipment in the existing panels, and will commission such work inside the 230kV control building. Transmission Owner will develop the communications protocols and data flow over the circuits.
Phase I In Phase I, the project will be connected as a tap to the Transmission Owner’s 230kV transmission line MWP-2 via one 230kV circuit breaker in series with one of two ring bus breakers for stuck breaker protection (one in each direction) and a tie-line breaker, as shown on the one-line diagram labeled CL-E-IA-01 attached to this Appendix A as Figure 1. The changes to the existing MWP-2 line protection for this arrangement are described in Phase I System Upgrades in Section II of this Appendix A.
Lost Shareholder Due Diligence Searches and Servicing The Trust hereby acknowledges that USBFS has an arrangement with an outside vendor to conduct lost shareholder searches required by Rule 17Ad-17 under the Securities Exchange Act of 1934, as amended. Costs associated with such searches will be passed through to the Trust as an out-of-pocket expense in accordance with the fee schedule set forth in Exhibit C hereto. If a shareholder remains lost and the shareholder’s account unresolved after completion of the mandatory Rule 17Ad-17 search, the Trust hereby authorizes vendor to enter, at its discretion, into fee sharing arrangements with the lost shareholder (or such lost shareholder’s representative or executor) to conduct a more in-depth search in order to locate the lost shareholder before the shareholder’s assets escheat to the applicable state. The Trust hereby acknowledges that USBFS is not a party to these arrangements and does not receive any revenue sharing or other fees relating to these arrangements. Furthermore, the Trust hereby acknowledges that vendor may receive up to 35% of the lost shareholder’s assets as compensation for its efforts in locating the lost shareholder.