Phase I of Project Sample Clauses

Phase I of Project. SUNSHINE - I” PART- IV: “APARTMENT” TABLE: AREA DESCRIPTION OF THE APARTMENT Super Built-up Area (in Sq. Ft.) Built-up Area (in Sq. ft.) Carpet Area (in Sq. ft.) Exclusive Balcony (in Sq. ft.) ALONG WITH exclusive, perpetual, transferable and heritable right to park a vehicle in ----------------- FLOOR PLAN OF THE APARTMENT Sl. No. Payment Schedule Amount (Rs.) Sl. No. Payment Schedule Percentage (%) of Sale Price Total 100% Sl. No. Other Charges & Deposits
Phase I of Project 

Related to Phase I of Project

  • Completion of Project This Grant Agreement shall terminate upon completion of the project and payment of the last invoice.

  • Scope of Project i. The work to be per formed under the terms of this Agreement for the Rapid City Metropolitan Transportation Planning Process will be conducted in accordance with the CY 2019 Unified Planning Work Program incorporated in this Agreement by reference as Attachment D. ii. The Sub-Recipient’s Responsibilities:

  • Construction of Project 11.1.1 Developer agrees to cause the Project to be developed, constructed, and installed in accordance with the terms hereof and the Construction Provisions set forth in Exhibit D, including those things reasonably inferred from the Contract Documents as being within the scope of the Project and necessary to produce the stated result even though no mention is made in the Contract Documents.

  • DESCRIPTION OF PROJECT For the Company to be eligible to earn the Maximum Credit Amount, the Company will satisfy its obligations as reflected in the following representations, which the IEDC has relied upon: A. The Company will complete the Project at the Project Location. B. The Company represents that the number of permanent, Full-Time Employees (as defined in Indiana Code § 6–3.1–13–4) from whom Indiana state income tax withholdings are retained by the State of Indiana, employed as of the Commencement Date at the Project Location, is the Base Employment Number. C. The Project will result in the creation of New Employees (as defined in Indiana Code § 6- 3.1-13-6) at the Project Location of at least the Additional Jobs Commitment. D. The average of the hourly wages, before benefits, paid to New Employees at the Project Location, will at least equal the Average Wage Commitment. E. At the discretion of the IEDC, New Employees that are paid an average wage of less than the Minimum Wage Commitment may be excluded for the purpose of calculating the credit amount. F. The Project is anticipated to involve at least the Capital Investment Amount.

  • Phase II A small portion of the work for the Phase II modifications to the Plattsburgh Substation will be performed by Transmission Owner, and the remainder will be performed by Clinton and ▇▇▇▇▇▇▇▇▇. A detailed definition of the specific scope for Transmission Owner and Clinton and ▇▇▇▇▇▇▇▇▇ including interface points shall be defined during the design phase and, as such documents become available, copies will be delivered to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The full scope includes the installation of wave traps, CCVT’s and modifications and/or additions to relaying on the MWP-1 and MWP- 2 lines. These lines will be reconfigured at the completion of Phase II to connect to ▇▇▇▇▇ and ▇▇▇▇▇▇▇ Substations on MWP-1 and the ▇▇▇▇ Substation on MWP-2. Clinton and ▇▇▇▇▇▇▇▇▇ will design the upgrades and purchase the materials based on the outline specification that was prepared and issued by Transmission Owner. The work to be performed by Clinton and ▇▇▇▇▇▇▇▇▇ will include both the materials for the exterior and interior installations and items for Transmission Owner installation inside the control building in existing relay panels and communication racks. In addition, Clinton and ▇▇▇▇▇▇▇▇▇ will be responsible for the exterior and interior construction work and will provide construction management services in coordination with Transmission Owner. The civil design for the foundations and the electrical design for the cable runs to the control room will be designed by, as approved by Transmission Owner, and installed under the supervision and control of Clinton and ▇▇▇▇▇▇▇▇▇. The equipment will be selected and procured in accordance with the specifications developed during the detailed engineering phase, copies of which shall be furnished to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The construction of the foundations, structures, wave traps, CCTV and cable runs into the control building to the termination cabinets will be completed by Clinton and ▇▇▇▇▇▇▇▇▇. The work at the Plattsburgh Substation will be installed under Transmission Owner’s CPP-1. Transmission Owner will provide Protection and Controls Engineering, install and terminate wiring from the termination cabinets to the control panels and relays, install relays and equipment in the existing panels, and will commission such work inside the 230kV control building. Transmission Owner will develop the communications protocols and data flow over the circuits.