Log Reviews All systems processing and/or storing PHI COUNTY discloses to 11 CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of COUNTY 12 must have a routine procedure in place to review system logs for unauthorized access.
Project Review A. Programmatic Allowances 1. If FEMA determines that the entire scope of an Undertaking conforms to one or more allowances in Appendix B of this Agreement, with determinations for Tier II Allowances being made by SOI-qualified staff, FEMA shall complete the Section 106 review process by documenting this determination in the project file, without SHPO review or notification. 2. If the Undertaking involves a National Historic Landmark (NHL), FEMA shall notify the SHPO, participating Tribe(s), and the NPS NHL Program Manager of the NPS Midwest Regional Office that the Undertaking conforms to one or more allowances. FEMA shall provide information about the proposed scope of work for the Undertaking and the allowance(s) enabling FEMA’s determination. 3. If FEMA determines any portion of an Undertaking’s scope of work does not conform to one or more allowances listed in Appendix B, FEMA shall conduct expedited or standard Section 106 review, as appropriate, for the entire Undertaking in accordance with Stipulation II.B, Expedited Review for Emergency Undertakings, or Stipulation II.C, Standard Project Review. 4. Allowances may be revised and new allowances may be added to this Agreement in accordance with Stipulation IV.A.3, Amendments. B. Expedited Review for Emergency Undertakings
Reviews (a) During the term of this Agreement and for 7 years after the term of this Agreement, the HSP agrees that the Funder or its authorized representatives may conduct a Review of the HSP to confirm the HSP’s fulfillment of its obligations under this Agreement. For these purposes the Funder or its authorized representatives may, upon 24 hours’ Notice to the HSP and during normal business hours enter the HSP’s premises to: inspect and copy any financial records, invoices and other finance- related documents, other than personal health information as defined in the Enabling Legislation, in the possession or under the control of the HSP which relate to the Funding or otherwise to the Services; and inspect and copy non-financial records, other than personal health information as defined in the Enabling Legislation, in the possession or under the control of the HSP which relate to the Funding, the Services or otherwise to the performance of the HSP under this Agreement. (b) The cost of any Review will be borne by the HSP if the Review: (1) was made necessary because the HSP did not comply with a requirement under the Enabling Legislation or this Agreement; or (2) indicates that the HSP has not fulfilled its obligations under this Agreement, including its obligations under Applicable Law and Applicable Policy. (c) To assist in respect of the rights set out in (a) above, the HSP shall disclose any information requested by the Funder or its authorized representatives and shall do so in a form requested by the Funder or its authorized representatives. (d) The HSP may not commence a proceeding for damages or otherwise against any person with respect to any act done or omitted to be done, any conclusion reached or report submitted that is done in good faith in respect of a Review.
Phase II A small portion of the work for the Phase II modifications to the Plattsburgh Substation will be performed by Transmission Owner, and the remainder will be performed by Clinton and ▇▇▇▇▇▇▇▇▇. A detailed definition of the specific scope for Transmission Owner and Clinton and ▇▇▇▇▇▇▇▇▇ including interface points shall be defined during the design phase and, as such documents become available, copies will be delivered to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The full scope includes the installation of wave traps, CCVT’s and modifications and/or additions to relaying on the MWP-1 and MWP- 2 lines. These lines will be reconfigured at the completion of Phase II to connect to ▇▇▇▇▇ and ▇▇▇▇▇▇▇ Substations on MWP-1 and the ▇▇▇▇ Substation on MWP-2. Clinton and ▇▇▇▇▇▇▇▇▇ will design the upgrades and purchase the materials based on the outline specification that was prepared and issued by Transmission Owner. The work to be performed by Clinton and ▇▇▇▇▇▇▇▇▇ will include both the materials for the exterior and interior installations and items for Transmission Owner installation inside the control building in existing relay panels and communication racks. In addition, Clinton and ▇▇▇▇▇▇▇▇▇ will be responsible for the exterior and interior construction work and will provide construction management services in coordination with Transmission Owner. The civil design for the foundations and the electrical design for the cable runs to the control room will be designed by, as approved by Transmission Owner, and installed under the supervision and control of Clinton and ▇▇▇▇▇▇▇▇▇. The equipment will be selected and procured in accordance with the specifications developed during the detailed engineering phase, copies of which shall be furnished to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The construction of the foundations, structures, wave traps, CCTV and cable runs into the control building to the termination cabinets will be completed by Clinton and ▇▇▇▇▇▇▇▇▇. The work at the Plattsburgh Substation will be installed under Transmission Owner’s CPP-1. Transmission Owner will provide Protection and Controls Engineering, install and terminate wiring from the termination cabinets to the control panels and relays, install relays and equipment in the existing panels, and will commission such work inside the 230kV control building. Transmission Owner will develop the communications protocols and data flow over the circuits.
Program Review The State ECEAP Office will conduct a review of each contractor’s compliance with the ECEAP Contract and ECEAP Performance Standards every four years. The review will involve ECEAP staff and parents. After the Program Review, the State ECEAP Office will provide the contractor with a Program Review report. The contractor must submit an ECEAP Corrective Action Plan for non-compliance with ECEAP Performance Standards. The Plan must be approved by the State ECEAP Office.