PIPELINE SIZING Sample Clauses

PIPELINE SIZING. Pipelines shall be sized to meet the following requirements: 1. Maximum daily flow plus fire flow with a residual pressure of 20 psi at critical fire hydrant. 2. Peak hour flow with a minimum residual pressure of 40 psi. 3. In determining the carrying capacity of the mains, the "C"* values to be applied are shown in Table 100-21. 4. Maximum velocity in distribution main (without fire flow) is 6 feet per second.
PIPELINE SIZING. Sewer: The size of each gravity pipeline will be reviewed, along with size of pressure sewers. Water: The City will confirm pipeline size for the water main extension.

Related to PIPELINE SIZING

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

  • Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including without limitation those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.

  • Underground Storage Tanks In accordance with the requirements of Section 3(g) of the D.C. Underground Storage Tank Management Act of 1990, as amended by the District of Columbia Underground Storage Tank Management Act of 1990 Amendment Act of 1992 (D.C. Code § 8-113.01, et seq.) (collectively, the “UST Act”) and the applicable D.C. Underground Storage Tank Regulations, 20 DCMR Chapter 56 (the “UST Regulations”), District hereby informs the Developer that it has no knowledge of the existence or removal during its ownership of the Property of any “underground storage tanks” (as defined in the UST Act). Information pertaining to underground storage tanks and underground storage tank removals of which the D.C. Government has received notification is on file with the District Department of the Environment, Underground Storage Tank Branch, ▇▇ ▇ ▇▇▇▇▇▇, ▇.▇., ▇▇▇▇▇ ▇▇▇▇▇, ▇▇▇▇▇▇▇▇▇▇, ▇.▇., ▇▇▇▇▇, telephone (▇▇▇) ▇▇▇-▇▇▇▇. District’s knowledge for purposes of this Section shall mean and be limited to the actual knowledge of ▇▇▇▇▇▇ ▇▇▇▇▇, Property Acquisition and Disposition Division of the Department of Housing and Community Development, telephone no. (▇▇▇) ▇▇▇-▇▇▇▇. The foregoing is set forth pursuant to requirements contained in the UST Act and UST Regulations and does not constitute a representation or warranty by District.

  • Porcupine Site Highway 11 and the City of Timmins Thunder Bay and District Toronto/York-Peel

  • Interconnection Facilities 4.1.1 The Interconnection Customer shall pay for the cost of the Interconnection Facilities itemized in Attachment 2 of this Agreement. The NYISO, in consultation with the Connecting Transmission Owner, shall provide a best estimate cost, including overheads, for the purchase and construction of its Interconnection Facilities and provide a detailed itemization of such costs. Costs associated with Interconnection Facilities may be shared with other entities that may benefit from such facilities by agreement of the Interconnection Customer, such other entities, the NYISO, and the Connecting Transmission Owner. 4.1.2 The Interconnection Customer shall be responsible for its share of all reasonable expenses, including overheads, associated with (1) owning, operating, maintaining, repairing, and replacing its own Interconnection Facilities, and