Plan Preparation. The ENGINEER shall prepare roadway plans, profiles and typical sections for the proposed improvements. This scope of services and the corresponding cost proposal are based on the ENGINEER preparing plans for a roadway reconstruction. The following plan sheets shall be included: 1. Title Sheet w/ Index of Sheets (to be included with the Main St. at RM 967 project)
Appears in 1 contract
Sources: Professional Services Agreement
Plan Preparation. The ENGINEER shall prepare roadway plans, profiles and typical sections for the proposed improvements. This scope of services and the corresponding cost proposal are based on the ENGINEER preparing plans for a roadway reconstruction. The following plan sheets shall be includedincluded as a minimum:
1. Title Sheet w/ / Index of Sheets (to be included with the Main St. at RM 967 project)Sheets
Appears in 1 contract
Sources: Professional Services Agreement
Plan Preparation. The ENGINEER shall prepare roadway plans, profiles and typical sections for the proposed improvements. This scope of services and the corresponding cost proposal are based on the ENGINEER preparing plans for a roadway reconstruction. The following plan plans sheets shall be includedincluded as a minimum:
1. Title Sheet w/ Sheet
2. Index of Sheets Sheets
3. Project Layout (to be included with the Main St. at RM 967 projectBenchmarks)
4. Typical Sections
5. General Notes
6. Quantity Sheets
Appears in 1 contract
Sources: Professional Services Agreement