Plan Set. Contractor shall prepare a comprehensive submittal package for each phase of the Work that will be reviewed and approved by the County. At a minimum, each submittal package shall include the elements required to convey in sufficient detail the following for each phase of the design, as applicable: • Site Layout Drawings, with distances from roof edges and existing buildings and equipment • Underground Utilities • Construction Specifications (trenching, mounting, etc.) • Equipment Layout Drawings • Electrical Single-Line and Three-Line Diagrams • Module Stringing Diagrams • Electric Wire and Conduit Schedule • Electrical Warning Labels & Placards Plans • Lighting Plan (for shade structures) • Architectural Drawings, including compliance with Americans with Disabilities Act (ADA) • Structural/Mechanical Drawings, including roof penetration details • Geotechnical and/or Surveyor Drawings and Studies • Manufacturer’s Cut Sheets with Equipment Specifications • Data Acquisition System (DAS) Specifications, Cut Sheets, and Data Specifications Contractor shall include adequate time for County review and approval of submittals, as well as re- submittals and re-reviews. Minimum County review time shall be ten (10) business days from the date of receipt of each submittal package during each phase of the Design Review.
Appears in 2 contracts
Sources: Agreement for Design, Installation, and Commissioning of Energy Conservation Facilities, Agreement for Design, Installation, and Commissioning of Energy Conservation Facilities