Plant Material Replacement Clause Samples

Plant Material Replacement. The Contractor will assume responsibility and liability of use of chemical controls, and shall be responsible for the replacement of any plants, turf, and trees killed or damaged by improper chemical applications.
Plant Material Replacement. The Contractor will assume responsibility and liability of use of chemical controls, and shall be responsible for the replacement of any plants, turf, and trees killed or damaged by improper chemical applications. A. All creeping grasses shall be kept out of shrubs and groundcovers. B. The Contractor shall be especially careful if applying chemicals to control weeds because of possible damage to the lawn. Before such applications are made the turf should be well established and in a vigorous growth condition. All chemicals applied will be recorded and coordinated with the City. C. Broadleaf weeds in turf shall be removed selectively, without injury to the lawn grass other than slight, temporary discoloration. D. Grass weeds in lawns shall be controlled with selective post-emergence herbicides. Pre-emergent herbicide application shall be required to control crabgrass in all turf area. Scheduling for pre-emergence herbicide controls of weedy grass seeds shall be set forth in the FREQUENCY SCHEDULE. ▇. ▇▇▇▇▇ not killed with herbicides shall be removed manually. Turf and other desirable plants killed by weeds, chemicals, etc., shall be replaced at the Contractor’s expense. All replacements must be made within 7 calendar days after receiving notice from the City. F. See also WEED CONTROL and PEST CONTROL Sections above. A. The Contractor shall be responsible for the application of the appropriate chemical. B. The Contractor shall be responsible for the replacement of any plant, tree or turf area, at no cost to the City, if appropriate measures or actions were not taken to control and/or eradicate the problem. C. The City shall notify the Contractor in writing if the City has knowledge of any insect, fungus or disease problems. Preventive fungicides shall be applied as necessary. D. Insecticide and/or fungicide applications shall be recorded on the maintenance schedule and coordinated with the City’s City. See also Application of Pesticides-Use Reports above. E. Materials used shall be chemicals as approved by the State of California Department of Food and Agriculture.

Related to Plant Material Replacement

  • Elements Unsatisfactory Needs Improvement Proficient Exemplary IV-A-1. Reflective Practice Demonstrates limited reflection on practice and/or use of insights gained to improve practice. May reflect on the effectiveness of lessons/ units and interactions with students but not with colleagues and/or rarely uses insights to improve practice. Regularly reflects on the effectiveness of lessons, units, and interactions with students, both individually and with colleagues, and uses insights gained to improve practice and student learning. Regularly reflects on the effectiveness of lessons, units, and interactions with students, both individually and with colleagues; and uses and shares with colleagues, insights gained to improve practice and student learning. Is able to model this element.

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract. a. The contractor shall notify all potential subcontractors and suppliers and lessors of their EEO obligations under this contract. b. The contractor will use good faith efforts to ensure subcontractor compliance with their EEO obligations.

  • Tool Replacement Personal tools worn out and/or broken on the job will be replaced on a like- for-like basis by the Employer, provided the tool is turned in to the Employer and the Employer had knowledge the tool was being used on the job. If an employee has his/her tools stolen from a state vehicle, the Employer will replace those tools, as long as no employee negligence has occurred.

  • Contractor’s Equipment The Contractor shall be responsible for all Contractor’s Equipment. The Contractor’s Equipment shall be deemed to be exclusively intended for the execution of the Works.

  • Personnel Equipment and Material Engineer shall furnish and maintain, at its own expense, quarters for the performance of all Engineering Services, and adequate and sufficient personnel and equipment to perform the Engineering Services as required. All employees of Engineer shall have such knowledge and experience as will enable them to perform the duties assigned to them. Any employee of Engineer who, in the reasonable opinion of County, is incompetent or whose conduct becomes detrimental to the Engineering Services shall immediately be removed from association with the Project when so instructed by County. Engineer certifies that it presently has adequate qualified personnel in its employment for performance of the Engineering Services required under this Contract, or will obtain such personnel from sources other than County. Engineer may not change the Project Manager without prior written consent of County.