Point Source Emission Factor Development Clause Samples

Point Source Emission Factor Development. Using the results of the point source testing task (Task 3), the ERG team will develop average emission factors for the following emission units: • ▇▇▇▇▇ • Well pads • Lift and line compressor engines • Equipment leaksStorage tanks • Dehydrators • Pipelines The final sub-categorization of the emission units included in the emission factor development task will be determined in consultation with the City, considering the measured variability in emission rates for each unit type (from Task 3) and the availability of process data on which to base the emission factor (from this task). Depending on availability of data, emission factors may be developed on a temporal basis (pound per hour or pound per day) or an activity basis (pound per thousand cubic feet of gas produced). Additionally, operator data will be collected on pre-production activities (drilling, fracturing, completion) to estimate emissions from mobile sources (PM generated by truck traffic) and from temporary engines used on-site for drilling, auxiliary power, and fracturing operations (PM and NOx).

Related to Point Source Emission Factor Development

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.

  • Career Development The City and the Union agree that employee career growth can be beneficial to both the City and the affected employee. As such, consistent with training needs identified by the City and the financial resources appropriated therefore by the City, the City shall provide educational and training opportunities for employee career growth. Each employee shall be responsible for utilizing those training and educational opportunities made available by the City or other institutions for the self- development effort needed to achieve personal career goals.

  • Condominiums/Planned Unit Developments If the Mortgaged Property is a condominium unit or a planned unit development (other than a de minimis planned unit development) such condominium or planned unit development project such Mortgage Loan was originated in accordance with, and the Mortgaged Property meets the guidelines set forth in the Originator's Underwriting Guidelines;

  • Supplier Development lf the Buyer identifies problems in supplier performance based on supplier monitoring, he shall initiate improvement measures at the Supplier. The Buyer shall pursue the possibilities of continuous improvement of the Supplier. The supplier audit is a form of supplier development; the exchange of information and experience between the Buyer and the Supplier also serves this purpose.