Post-installation. Post shall be installed on an approved foundation with transformer base or shaft base set parallel with the curb and in a plumb position. Shaft shall be properly lined to a vertical position. Arm shall be installed perpendicular to the curb, unless otherwise directed by the Engineer. New lamppost with facilities for bolt covers shall have the bolt covers installed. All FS posts installed shall be painted to a height of 7 feet with nonconductive paint (payment for this painting shall be included in post installation item). No additional payment will be made for painting of post with nonconductive paint. All sections and appurtenant parts shall be properly secured with clips, bolts, nuts, etc. Attach new ID tags. Contractor shall also furnish and install necessary conductors and accessories for properly grounding the lamppost (DWG H-5019). Lamppost wiring is specified elsewhere. Bituminous compound and stainless steel washers equal to 300 series 18-8 shall insulate lampposts having appurtenant parts of dissimilar metals, such as aluminum and steel.
Appears in 2 contracts
Sources: Furnish and Install Agreement, Furnish and Install Agreement