Post-installation. Verify that approved “Scope of Work” has been completed. Record any changes to the scope and adjust savings if necessary based on as-built lighting. Perform a one-time post installation circuit wattage measurement on a representative sample of installed interior fixture combinations where a quantity of 50 or more of the same type of fixtures will be tested using a 90% confidence and 20% precision level (see Table 2.11a for sample size determinations). Use post retrofit wattage measurement to adjust savings estimates for all like fixtures in each facility, adjusted savings values will be used in post retrofit calculations.
Appears in 1 contract
Sources: Performance Contract
Post-installation. Verify that approved “Scope of Work” has been completed. Record any changes to the scope and adjust savings if necessary based on as-built lighting. Perform a one-time post installation circuit wattage measurement on a representative sample of installed interior fixture combinations where a quantity of 50 or more of the same type of fixtures will be tested using a 90% confidence and 20% precision level (see Table 2.11a 2.12a for sample size determinations). Use post retrofit wattage measurement to adjust savings estimates for all like fixtures in each facility, adjusted savings values will be used in post retrofit calculations.
Appears in 1 contract
Sources: Performance Contract