Post Project Water Quality Monitoring. 7.9.2.1 As mentioned in the Chapter 6 of the EIA report, the additional structures inside the nullah would alter the drainage characteristics of the ▇▇▇▇ ▇▇▇▇ Town Nullah though the impact is considered insignificant. However, a post project water quality monitoring is proposed to evaluate the water quality impact induced by the Project. 7.9.2.2 Post project monitoring will comprise sampling on three occasions (days) within 4 weeks after completion of the Project. The interval between two sets of monitoring shall not less than 36 hours.

Related to Post Project Water Quality Monitoring

  • Quality Assurance/Quality Control Contractor shall establish and maintain a quality assurance/quality control program which shall include procedures for continuous control of all construction and comprehensive inspection and testing of all items of Work, including any Work performed by Subcontractors, so as to ensure complete conformance to the Contract with respect to materials, workmanship, construction, finish, functional performance, and identification. The program established by Contractor shall comply with any quality assurance/quality control requirements incorporated in the Contract.

  • Quality Management System Supplier hereby undertakes, warrants and confirms, and will ensue same for its subcontractors, to remain certified in accordance with ISO 9001 standard or equivalent. At any time during the term of this Agreement, the Supplier shall, if so instructed by ISR, provide evidence of such certifications. In any event, Supplier must notify ISR, in writing, in the event said certification is suspended and/or canceled and/or not continued.

  • Project Monitoring The Developer shall provide regular status reports to the NYISO in accordance with the monitoring requirements set forth in the Development Schedule, the Public Policy Transmission Planning Process Manual and Attachment Y of the OATT.

  • Quality Management Grantee will: 1. comply with quality management requirements as directed by the System Agency. 2. develop and implement a Quality Management Plan (QMP) that conforms with 25 TAC § 448.504 and make the QMP available to System Agency upon request. The QMP must be developed no later than the end of the first quarter of the Contract term. 3. update and revise the QMP each biennium or sooner, if necessary. ▇▇▇▇▇▇▇’s governing body will review and approve the initial QMP, within the first quarter of the Contract term, and each updated and revised QMP thereafter. The QMP must describe ▇▇▇▇▇▇▇’s methods to measure, assess, and improve - i. Implementation of evidence-based practices, programs and research-based approaches to service delivery; ii. Client/participant satisfaction with the services provided by ▇▇▇▇▇▇▇; iii. Service capacity and access to services; iv. Client/participant continuum of care; and v. Accuracy of data reported to the state. 4. participate in continuous quality improvement (CQI) activities as defined and scheduled by the state including, but not limited to data verification, performing self-reviews; submitting self-review results and supporting documentation for the state’s desk reviews; and participating in the state’s onsite or desk reviews. 5. submit plan of improvement or corrective action plan and supporting documentation as requested by System Agency. 6. participate in and actively pursue CQI activities that support performance and outcomes improvement. 7. respond to consultation recommendations by System Agency, which may include, but are not limited to the following: i. Staff training; ii. Self-monitoring activities guided by System Agency, including use of quality management tools to self-identify compliance issues; and iii. Monitoring of performance reports in the System Agency electronic clinical management system.

  • COUNTY’S QUALITY ASSURANCE PLAN The County or its agent will evaluate the Contractor’s performance under this Contract on not less than an annual basis. Such evaluation will include assessing the Contractor’s compliance with all Contract terms and conditions and performance standards. Contractor deficiencies which the County determines are severe or continuing and that may place performance of the Contract in jeopardy if not corrected will be reported to the Board of Supervisors. The report will include improvement/corrective action measures taken by the County and the Contractor. If improvement does not occur consistent with the corrective action measures, the County may terminate this Contract or impose other penalties as specified in this Contract.