Unbundled Network Terminating Wire (UNTW) 2.8.3.1 UNTW is unshielded twisted copper wiring that is used to extend circuits from an intra-building network cable terminal or from a building entrance terminal to an individual End User’s point of demarcation. It is the final portion of the Loop that in multi-subscriber configurations represents the point at which the network branches out to serve individual subscribers. 2.8.3.2 This element will be provided in MDUs and/or Multi-Tenants Units (MTUs) where either Party owns wiring all the way to the End User’s premises. Neither Party will provide this element in locations where the property owner provides its own wiring to the End User’s premises, where a third party owns the wiring to the End User’s premises.
RDO Schedule/ Working Day Calendar (a) The Employer recognises that hours accrued in accordance with clause 38 create a bank of hours to be drawn upon by the Employee, as a paid RDO. The Employer recognises that Employees are entitled to take off days accrued in accordance with this clause. (b) The agreed indicative RDO/Working Day Calendars for 2024 to 2029 are attached at Appendix D of this Agreement. (c) For the avoidance of doubt, nothing in the arrangement for an indicative RDO / Working Day Calendar is intended to impose a limit on the ability of the Employer to determine with its Employees when and where work can be performed to meet operational requirements or otherwise limit the Employer’s right to manage its business and improve productivity.
Standard Work Week (a) Except as provided below, the standard work week for Full-time Employees shall normally consist of 35 hours per week, which shall normally consist of 5 equal Shifts of 7 hours. (b) The standard work week for certain Full-time Employees, including but not limited to, technical Employees, shall normally consist of 37.5 hours per week, which shall normally consist of 5 equal Shifts of 7.5 hours.
Modified Work Week Where Employees in a unit have indicated a desire to work a modified work week, the Employer may authorize experiments with modified work week schedule, providing operational requirements permit and the provision of services are not adversely affected. The averaging period for a modified work week shall not exceed three (3) calendar weeks, and the work day shall not exceed ten (10) hours .
Post-Commercial Operation Date Testing and Modifications Developer and Connecting Transmission Owner shall each at its own expense perform routine inspection and testing of its facilities and equipment in accordance with Good Utility Practice and Applicable Reliability Standards as may be necessary to ensure the continued interconnection of the Large Generating Facility with the New York State Transmission System in a safe and reliable manner. Developer and Connecting Transmission Owner shall each have the right, upon advance written notice, to require reasonable additional testing of the other Party’s facilities, at the requesting Party’s expense, as may be in accordance with Good Utility Practice.