Common use of Power Factor Adjustment Clause in Contracts

Power Factor Adjustment. Factor meeting the contractual requirements of the Transmission and Power Supply Providers must be maintained at the two metering locations (Meters M1 and M2) where the City’s 138 kV transmission lines connect to Substation B. The Power Factor of Facility will be measured through the meters (Meters M3 and M4) located at the Facility Delivery Point(s). The Power Factor of the City’s transmission facilities connected to Substation B will be measured through meters (Meters M5 and M6) located on the high-voltage side of the 138/69 kV step-down transformers. The combined Power Factor of the City and the Facility electric loads will be augmented through the use of two 21.6 MVAR, 138 kV capacitor banks to assist in Power Factor correction. Coffeyville Resources may elect to use the Facility’s 37,000 H.P. synchronous motor to fine-tune the Power Factor requirements. The data obtained from meters M3 through M6 will be used to determine the MVAR requirements of the Facility and the City. To the extent not otherwise recovered under SPP Charges, the costs of any necessary reactive supply and voltage control ancillary services supplied by the SPP will be billed to Coffeyville Resources and the City accordingly. All additional costs incurred by the City to adjust the Facility’s Power Factor deficiencies will be billed through part 5 of this Rate Schedule.

Appears in 2 contracts

Sources: Electric Service Agreement, Electric Service Agreement (CVR Energy Inc)