Common use of Power Quality Requirements Clause in Contracts

Power Quality Requirements. 5.7.1 The Q shall not create power system disturbances that will breach JPS standards and power system parameters as outlined in the Generation Code and Distribution Code. 5.7.2 JPS reserves the right to install test equipment as may be required to perform a disturbance analysis and monitor the operation of the QF to evaluate the quality of the power produced. If the system is demonstrated to be a source of interference, and the interference breaches JPS standards, requirements under the Generation Code and Distribution Code or generally accepted industry standards, then the QF shall be isolated from the JPS distribution network either by using the generator or interconnection disconnect switch until corrections are made to remedy the interference. 5.7.3 It is the QE’s responsibility to eliminate the interference caused by the QF.

Appears in 2 contracts

Sources: Standard Offer Contract for the Purchase of as Available Energy, Standard Offer Contract for the Purchase of as Available Energy

Power Quality Requirements. 5.7.1 The Q QF shall not create power system disturbances that will breach JPS standards and power system parameters as outlined in the Generation Code and Distribution Code. 5.7.2 JPS reserves the right to install test equipment as may be required to perform a disturbance analysis and monitor the operation of the QF to evaluate the quality of the power produced. If the system is demonstrated to be a source of interference, and the interference breaches JPS standards, requirements under the Generation Code and Distribution Code or generally accepted industry standards, then the QF shall be isolated from the JPS distribution network either by using the generator or interconnection disconnect switch until corrections are made to remedy the interference. 5.7.3 It is the QE’s responsibility to eliminate the interference caused by the QF.

Appears in 1 contract

Sources: Standard Offer Contract