Power Reference Limit Sample Clauses

The Power Reference Limit clause sets a maximum threshold for the amount of electrical power that can be delivered, received, or utilized under an agreement. In practice, this clause specifies the upper limit of power flow, often measured in megawatts, that a party is permitted to draw from or supply to a grid or facility. By clearly defining this cap, the clause helps prevent overloading of infrastructure, ensures operational safety, and allocates responsibility for staying within agreed technical boundaries.
Power Reference Limit. The Facility is not allowed to exceed this setting when system frequency is at 60 Hz. When system frequency is not 60 Hz, the Facility's net real power export is allowed to exceed this setting or be further reduced below this setting when commanded by the frequency response control specified in Section 3(m) of Attachment B (Facility Owned by Seller).

Related to Power Reference Limit

  • DNS name server availability Refers to the ability of a public-­‐DNS registered “IP address” of a particular name server listed as authoritative for a domain name, to answer DNS queries from an Internet user. All the public DNS-­‐registered “IP address” of all name servers of the domain name being monitored shall be tested individually. If 51% or more of the DNS testing probes get undefined/unanswered results from “DNS tests” to a name server “IP address” during a given time, the name server “IP address” will be considered unavailable.

  • Non-Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the high-side of the generator substation at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established a different power factor range that applies to all similarly situated non-synchronous generators in the control area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice. This power factor range standard shall be dynamic and can be met using, for example, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors, or a combination of the two. This requirement shall only apply to newly interconnecting non-synchronous generators that have not yet executed a Facilities Study Agreement as of September 21, 2016.

  • General Availability The commitment to availability specified in the letter of appointment shall be subject to mutually acceptable revision. Such revision will occur once per year, or, if mutually agreed between the Employer and the employee, on a more frequent basis. The Employer will issue a revised letter of appointment to reflect approved changes to employee’s general availability.

  • System Availability Although we will try to provide continuous access to the Service, we cannot and do not guarantee that the Service will be available 100% of the time and will not be liable in the event Service is unavailable. Actual service or network performance is dependent on a variety of factors outside of our control. If you notify us within twenty-four (24) hours and we confirm an outage consisting of a period of two (2) hours in any calendar month, and not due to any service, act, or omission of you, a third party, your applications, equipment or facilities, or reasons outside of our control, you shall be eligible for a service credit. A service credit shall be computed as a pro-rated charge for one day of the regular monthly fees for the Service in the next monthly statement. Intermittent service outages for periods of less than two (2) hours are not considered service outages. Outages caused by routine scheduled maintenance are also not considered an outage. You shall receive advance notice no less than forty-eight (48) hours in advance of our scheduled maintenance. Scheduled maintenance will be performed between 12:00 a.m. and 6:00 a.m. CST.

  • Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the Point of Interconnection at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established different requirements that apply to all similarly situated generators in the New York Control Area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice.