Power System Particulars; Sample Clauses

The 'Power System Particulars' clause defines the specific technical and operational details of the power system relevant to the contract. It typically outlines parameters such as voltage, frequency, capacity, and configuration of the power system components to be supplied or operated. By clearly specifying these particulars, the clause ensures that both parties have a mutual understanding of the system requirements, reducing the risk of disputes or misunderstandings regarding performance expectations.
Power System Particulars;. The plant and materials supplied shall be suitable in all respect for continuous operation in the existing system having the following data: Normal Voltage 415V 11KV 33KV Maximum Voltage 500V 12 KV 36KV No. Of phases 3 3 3 System frequency (Hz) 50 50 50 No. of wires 5 3 3 Fault level (MVA) 25 350 1500 Fault Current / Duration * * 25 kA / 3s Earth Fault Current / Duration * 3 kA / 3 s 3 kA / 3 s Neutral point Earthing Solid Resistance Resistance Conductor arrangement Vertical Horizontal Horizontal
Power System Particulars;. The plant and materials supplied shall be suitable in all respect for continuous operation in the existing system having the following data: 1 Normal Voltage 415V 11KV 33KV 2 Maximum Voltage 500V 12KV 36KV
Power System Particulars;. The plant and materials supplied shall be suitable in all respect for continuous operation in the existing system having the following data: 1 Normal Voltage 415V 11KV 33KV 2 Maximum Voltage 500V 12KV 36KV 3 No. Of phases 3 3 3 4 System frequency (Hz) 50 50 50 5 No. of wires 5 3 3 6 Fault level (MVA) 25 350 1500 7 Fault Current / Duration * * 25 kA / 3s 8 Earth Fault Current / Duration * 3 kA / 3s 3 kA / 3s 9 Neutral point Earthing Solid Resistance Resistance 10 Conductor arrangement Vertical Horizontal Horizontal
Power System Particulars;. The plant and materials supplied shall be suitable in all respect for continuous operation in the existing system having the following data: All low voltage equipment must be capable of operating within range of +10% to –15% of the rated voltage, tripping devices shall be capable of operating within the range +10% to –25% of the rated voltage.
Power System Particulars;. The plant and materials supplied shall be suitable in all respect for continuous operation in the existing system having the following data: 1 Normal Voltage 415V 11KV 33KV 2 Maximum Voltage 500V 12KV 36KV 3 No. Of phases 3 3 3 4 System frequency (Hz) 50 50 50 5 No. of wires 5 3 3 6 Fault level (MVA) 25 350 1500 7 Fault Current / Duration 120KA/3S * 25 kA / 3s 8 Earth Fault Current / Duration * 3 kA / 3s 3 kA / 3s 9 Neutral point Earthing Solid Resistance Resistance 10 Conductor arrangement Vertical Horizontal Horizontal ⮚ Technical Specifications for Item no.1: Rated 36 KV, Single Core Cable, Aluminum Conductor of 400 mm2, XLPE Insulated, Copper Wire Screened, Aluminum Wire Armored, And PVC Sheath. ◼ As per the details a) Depth of laying 1.4m b) Ground temperature 25 Co at 1.2 m c) Solid thermal resistively 1, 75 Co m/ w d) Spacing between circuits 0.55 m

Related to Power System Particulars;

  • Interconnection Service Interconnection Service allows the Interconnection Customer to connect the Large Generating Facility to the Participating TO’s Transmission System and be eligible to deliver the Large Generating Facility’s output using the available capacity of the CAISO Controlled Grid. To the extent the Interconnection Customer wants to receive Interconnection Service, the Participating TO shall construct facilities identified in Appendices A and C that the Participating TO is responsible to construct.

  • Power System Stabilizers The Developer shall procure, install, maintain and operate Power System Stabilizers in accordance with the requirements identified in the Interconnection Studies conducted for Developer’s Large Generating Facility. NYISO and Connecting Transmission Owner reserve the right to reasonably establish minimum acceptable settings for any installed Power System Stabilizers, subject to the design and operating limitations of the Large Generating Facility. If the Large Generating Facility’s Power System Stabilizers are removed from service or not capable of automatic operation, the Developer shall immediately notify the Connecting Transmission Owner and NYISO. The requirements of this paragraph shall not apply to wind generators.

  • Interconnection Customer Provided Services The services provided by Interconnection Customer under this LGIA are set forth in Article 9.6 and Article 13.5. 1. Interconnection Customer shall be paid for such services in accordance with Article 11.6.

  • Scope of Interconnection Service 1.3.1 The NYISO will provide Energy Resource Interconnection Service and Capacity Resource Interconnection Service to Interconnection Customer at the Point of Interconnection. 1.3.2 This Agreement does not constitute an agreement to purchase or deliver the Interconnection Customer’s power. The purchase or delivery of power and other services that the Interconnection Customer may require will be covered under separate agreements, if any, or applicable provisions of NYISO’s or Connecting Transmission Owner’s tariffs. The Interconnection Customer will be responsible for separately making all necessary arrangements (including scheduling) for delivery of electricity in accordance with the applicable provisions of the ISO OATT and Connecting Transmission Owner’s tariff. The execution of this Agreement does not constitute a request for, nor agreement to, provide Energy, any Ancillary Services or Installed Capacity under the NYISO Services Tariff or any Connecting Transmission Owner’s tariff. If Interconnection Customer wishes to supply or purchase Energy, Installed Capacity or Ancillary Services, then Interconnection Customer will make application to do so in accordance with the NYISO Services Tariff or Connecting Transmission Owner’s tariff.