PRE SUBMITTAL REQUIREMENTS. A. Scope Definition: Prior to GMP submittal, the Construction Manager shall thoroughly review the GMP construction document package with the Owner and determine if the scope is sufficiently defined and identify those areas requiring additional scope definition. As a minimum the following should be defined: Program building size, site limits and access, utility systems (existing and new), complete building systems descriptions, materials outline by division, MEP systems descriptions including materials, MEP system options shall be defined and accepted. B. Estimated Construction Cost: Cost estimates shall be updated concurrently with the construction document development. C. Schedule: The anticipated Notice to Proceed with Construction and Substantial Completion dates for Construction shall be coordinated and approved by the Owner. D. Value Engineering (VE): Proposed value engineering items included in the GMP shall be updated from previously submitted value engineering and should reflect the “final acceptance” of VE items, which are part of the scope of work. The VE schedule shall identify current acceptance and the date of acceptance in an adjacent column. VE items must be resolved and accepted by the Owner prior to GMP submittal.
Appears in 1 contract
PRE SUBMITTAL REQUIREMENTS. A. Scope Definition: Prior to GMP submittal, the Construction Manager Manager-at-Risk shall thoroughly review the GMP construction document package with the Owner and determine if the scope is sufficiently defined and identify those areas requiring additional scope definition. As a minimum the following should be defined: Program building size, site limits and access, utility systems (existing and new), complete building systems descriptions, materials outline by division, MEP systems descriptions including materials, MEP system options shall be defined and accepted.
B. Estimated Construction Cost: Cost estimates shall be updated concurrently with the construction document development.
C. Schedule: The anticipated Notice to Proceed with Construction and Substantial Completion dates for Construction shall be coordinated and approved by the Owner.
D. Value Engineering (VE): Proposed value engineering items included in the GMP shall be updated from previously submitted value engineering and should reflect the “final acceptance” of VE items, which are part of the scope of work. The VE schedule shall identify current acceptance and the date of acceptance in an adjacent column. VE items must be resolved and accepted by the Owner prior to GMP submittal.
Appears in 1 contract
Sources: Construction Manager Agreement
PRE SUBMITTAL REQUIREMENTS. A. Scope Definition: Prior to GMP submittal, the Construction Manager ▇▇▇▇ shall thoroughly review the GMP construction document package with the Owner and County to determine if the scope Scope is sufficiently defined and identify those areas requiring additional scope definition. As a minimum minimum, the following should shall be defined: Program building :
1. Program
2. Building size, site
3. Site limits and access, utility
4. Utility systems (existing and new), complete
5. Complete building systems descriptions, materials
6. Materials outline by division,
7. MEP systems descriptions including materials,
8. MEP system options shall be defined and acceptedoptions.
B. Estimated Construction Cost: Cost estimates shall be updated concurrently with the construction document development.
C. Schedule: The anticipated Notice to Proceed with Construction and Substantial Completion dates for Construction shall be coordinated and approved by the OwnerCounty.
D. Value Engineering (VE): Proposed value engineering items included in the GMP shall be updated from previously submitted value engineering and should shall reflect the “final acceptance” of VE items, which are part of the scope of work. The VE schedule shall identify current acceptance and the date of acceptance in an adjacent column. VE items must be resolved and accepted by the Owner County prior to GMP submittal.
Appears in 1 contract