Common use of Preliminary Engineering Report Clause in Contracts

Preliminary Engineering Report. This task includes defining and clarifying Owner’s requirements for the Project, including design objectives and constraints, space, capacity, and performance requirements, flexibility and expandability:  Utilizing the wastewater treatment facility recommendations from the 2018 Wastewater System Master Plan, review the recommendations and design parameters with the Town.  Consult with and analyze requirements of governmental authorities having jurisdiction to approve the portions of the Project to be designed or specified by Barge. Conduct preliminary project meeting with Tennessee Department of Environmental and Conservation (TDEC) staff as required by state regulations.  Prepare a preliminary engineering report (PER) detailing the upgrades recommended. The report will, as appropriate, contain schematic layouts, sketches, and conceptual design criteria with appropriate exhibits to indicate the agreed to requirements, considerations involved, and Engineer’s recommended solution(s). The PER will conform to TDEC requirements.  Conduct review meeting with Town staff to review PER and obtain any feedback from the Town on the elements of the project.  Submit final PER to Town (PDF format and two hard copies).  Submit final PER to TDEC for regulatory agency review.

Appears in 2 contracts

Sources: Professional Services Agreement, Professional Services Agreement