Common use of Preliminary Geometric Project Layout Clause in Contracts

Preliminary Geometric Project Layout. The Engineer shall develop a preliminary geometric project layout (Layout) for the full length of the project to be reviewed and approved by the State prior to the Engineer proceeding with the 30% milestone submittal package. The Layout shall consist of a planimetric file of existing features and the proposed improvements within the existing and any proposed ROW. The Layout shall also include the following features: existing and proposed ROW, existing and proposed horizontal and vertical alignment and profile grade line, cross culverts, lane widths, cross slopes, ditch slopes, pavement structure, clear zone, dedicated right turn lanes, corner clips, retaining walls (if applicable) guard rail (if applicable), and water surface elevations for various rainfall frequencies, etc. Existing major subsurface and surface utilities shall be shown. The proposed alignment shall avoid as much as possible the relocation of existing utilities. The Engineer shall consider Americans with Disabilities Act (ADA) requirements when developing the layout. The Layout shall be prepared in accordance with the current Roadway Design Manual. The Engineer shall provide horizontal and vertical alignment of the project layout in English units for main lanes and cross streets. Minor alignment alternatives will be considered to provide for an optimal design. The project layout must be coordinated with the State and adjacent Engineers, if any. The Engineer shall also provide proposed and existing typical DocuSign Envelope ID: 719137B1-7E3D-42BC-8A29-9D6AE732CB6A sections with the profile grade line (PGL), lane widths, cross slopes, ROW lines, ditch shapes, pavement structures and clear zones depicted, etc. Design Alternatives: Prior to proceeding with the final preliminary geometric layout the Engineer shall also present to the State for review and approval, alternatives for the design with recommendations and cost estimates for each alternative. The Engineer will also attend all necessary meetings to discuss the outcome of the evaluations of the study.

Appears in 1 contract

Sources: Contract for Engineering Services

Preliminary Geometric Project Layout. The Engineer shall develop a preliminary geometric project layout (Layout) for the full length of the project to be reviewed and approved by the State prior to the Engineer proceeding with the 30% milestone submittal package. The Layout shall consist of a planimetric file of existing features and the proposed improvements within the existing and any proposed ROW. The Layout shall also include the following features: existing and existing/proposed ROW, existing and existing/proposed horizontal and vertical alignment and profile grade line, cross culverts, lane widths, cross slopes, ditch slopes, pavement structure, clear zone, dedicated right turn lanes, corner clips, retaining walls (if applicable) guard rail (if applicable), and water surface elevations for various rainfall frequencies, etc. Existing major subsurface and surface utilities shall be shown. The proposed alignment shall avoid as much as possible the relocation of existing utilities. The Engineer shall consider Americans with Disabilities Act (ADA) requirements when developing the layout. The Layout shall be prepared in accordance with the current Roadway Design Manual. The Engineer shall provide horizontal and vertical alignment of the project layout in English units for main lanes and cross streets. Minor alignment alternatives will be considered to provide for an optimal design. The project layout must be coordinated with the State and adjacent Engineers, if any. The Engineer shall also provide proposed and existing typical DocuSign Envelope ID: 719137B1-7E3D-42BC-8A29-9D6AE732CB6A sections with the profile grade line (PGL), lane widths, cross slopes, ROW lines, ditch shapes, pavement structures and clear zones depicted, etc. Design Alternatives: Prior to proceeding with the final preliminary geometric layout the Engineer shall also present to the State for review and approval, alternatives for the design with recommendations and cost estimates for each alternative. The Engineer will also attend all necessary meetings to discuss the outcome of the evaluations of the study.

Appears in 1 contract

Sources: Contract for Engineering Services

Preliminary Geometric Project Layout. The Engineer shall develop a preliminary geometric project layout (Layout) for the full length of the project to be reviewed and approved by the State prior to the Engineer proceeding with the 30% 30 percent milestone submittal package. The Layout shall consist of a planimetric file of existing features and the proposed improvements within the existing and any proposed ROW. The Layout shall also include the following features: existing and proposed existing/Proposed ROW, existing and existing/proposed horizontal and vertical alignment and profile grade line, cross culverts, lane widths, cross slopes, ditch slopes, pavement structure, clear zone, dedicated right turn lanes, corner clips, retaining walls (if applicable) guard rail (if applicable), and water surface elevations for various rainfall frequencies, etc. Existing major subsurface and surface utilities shall be shown. The proposed alignment shall avoid as much as possible the relocation of existing utilities. The Engineer shall consider Americans with Disabilities Act (ADA) requirements when developing the layout. The Layout shall be prepared in accordance with the current Roadway Design Manual. The Engineer shall provide horizontal and vertical alignment of the project layout in English units for main lanes and cross streets. Minor alignment alternatives will be considered to provide for an optimal design. The project layout must be coordinated with the State and adjacent Engineers, if any. The Engineer shall also provide proposed and existing typical DocuSign Envelope ID: 719137B1-7E3D-42BC-8A29-9D6AE732CB6A sections with the profile grade line (PGL), lane widths, cross slopes, ROW lines, ditch shapes, pavement structures and clear zones depicted, etc. Design Alternatives: Prior to proceeding with the final preliminary geometric layout the Engineer shall also present to the State for review and approval, alternatives for the design with recommendations and cost estimates for each alternative. The Engineer will also attend all necessary meetings to discuss the outcome of the evaluations of the study.Flush vs. raised curbed median:

Appears in 1 contract

Sources: Supplemental Agreement

Preliminary Geometric Project Layout. The Engineer shall develop a preliminary geometric project layout (Layout) for the full length of the project to be reviewed and approved by the State prior to the Engineer proceeding with the 30% milestone submittal package. The Layout shall consist of a planimetric file of existing features and the proposed improvements within the existing and any proposed ROW. The Layout shall also include the following features: existing and proposed ROW, existing and proposed horizontal and vertical alignment and profile grade line, cross culverts, lane widths, cross slopes, ditch slopes, pavement structure, clear zone, dedicated right turn lanes, corner clips, retaining walls (if applicable) guard rail (if applicable), and water surface elevations for various rainfall frequencies, etc. Existing major subsurface and surface utilities shall be shown. The proposed alignment shall avoid as much as possible the relocation of existing utilities. The Engineer shall consider Americans with Disabilities Act (ADA) requirements when developing the layout. The Layout shall be prepared in accordance with the current Roadway Design Manual. The Engineer shall provide horizontal and vertical alignment of the project layout in English units for main lanes and cross streets. Minor alignment alternatives will be considered to provide for an optimal design. The project layout must be coordinated with the State and adjacent Engineers, if any. The Engineer shall also provide proposed and existing typical DocuSign Envelope ID: 719137B1-7E3D-42BC-8A29-9D6AE732CB6A sections with the profile grade line (PGL), lane widths, cross slopes, ROW lines, ditch shapes, pavement structures and clear zones depicted, etc. Design Alternatives: Prior to proceeding with the final preliminary geometric layout the Engineer shall also present to the State for review and approval, alternatives for the design with recommendations and cost estimates for each alternative. The Engineer will also attend all necessary meetings to discuss the outcome of the evaluations of the study.. DocuSign Envelope ID: ED57FAE2-481A-4535-A126-CE7F0E526760

Appears in 1 contract

Sources: Contract for Engineering Services