Preliminary Life Cycle Cost Analysis. 3.3.1 At the time set forth in the Project Schedule, the A/E shall prepare and submit practical alternative three design concepts, considering passive and/or active building components, for the purpose of minimizing future energy consumption, for a preliminary Life Cycle Cost Analysis (“LCCA”) and the preliminary LCCA for each concept to the CM. 3.3.1.1 The A/E shall estimate the annual energy consumption and associated energy costs of each alternative, analyze their impact on facility life-cycle costs and incorporate cost effective alternatives into the final design. 3.3.1.2 The A/E shall re-evaluate life cycle cost as additional alternatives are considered during the continuing design development to assure their cost effective implementation.
Appears in 1 contract
Sources: Professional Services
Preliminary Life Cycle Cost Analysis. 3.3.1 6.2.3.1 At the time set forth in the Project Schedule, the Criteria A/E shall prepare and submit practical alternative three design concepts, considering passive and/or active building components, for the purpose of minimizing future energy consumption, for a preliminary Life Cycle Cost Analysis (“LCCA”) and the preliminary LCCA for each concept to the CMOwner and Contracting Authority.
3.3.1.1 6.2.3.2 The Criteria A/E shall estimate the annual energy consumption and associated energy costs of each alternative, analyze their impact on facility life-cycle costs and incorporate cost effective alternatives into the final design.
3.3.1.2 6.2.3.3 The Criteria A/E shall re-evaluate life cycle cost as additional alternatives are considered during the continuing design development to assure their cost effective implementation.
Appears in 1 contract
Sources: Criteria a/E Scope of Services