Preliminary Version Clause Samples

The "Preliminary Version" clause defines a document or deliverable as an initial draft or incomplete version that is subject to further revision and approval. In practice, this clause clarifies that the content provided is not final and may lack certain details, be unedited, or require additional input before it is considered complete. Its core function is to set expectations for the parties involved, ensuring that recipients understand the provisional nature of the document and do not treat it as the final, binding version.
Preliminary Version. Objective: To approve the final design and accessibility accommodations of the Project. To undergo user testing and integrate their feedback into the preliminary version. To produce a fully functional, coded preliminary version of the Project with sample content.
Preliminary Version. 1 language PHASE 3: Final Version – English & French (and any additional languages)

Related to Preliminary Version

  • Preliminary Evaluation Site evaluation and planning functions should proceed concurrently with the accomplishment of Schematic Design, Design Development, and Construction Documents. The Design Professional shall conduct a preliminary review of the site based on information furnished by the Owner. The Design Professional will advise the Owner of potential site-related problems that the Design Professional notes from such review.

  • Preliminary Matters 3.1. At least five (5) days prior to the pre-construction meeting described in Section 3.2, Contractor shall submit to Consultant for Consultant’s review and acceptance: 3.1.1. A progress schedule in the indicated form: Bar Chart Modified Critical Path Method (“CPM”) CPM Computerized CPM (CPM is interpreted to be generally as outlined in the Association of General Contractors (“AGC”) publication, “The Use of CPM in Construction.”) The progress schedule shall indicate the start and completion dates of the various stages of the Work, and shall show an activity network for the planning and execution of the Work. Included with the progress schedule shall be a narrative description of the progress schedule. The progress schedule must be updated monthly by Contractor, submitted as part of each Application for Payment, and must be acceptable to Consultant. 3.1.2. A preliminary schedule of Shop Drawing submissions; and 3.1.3. In a lump sum contract or in a contract that includes lump sum bid items of Work, a preliminary schedule of values for all of the Work that includes quantities and prices of items aggregating the Contract Price and that subdivides the Work into component parts in sufficient detail to serve as the basis for progress payments during construction. Such prices will include a breakdown of labor, equipment, materials, and an appropriate amount of overhead and profit applicable to each item of Work, which amounts Contractor must confirm in writing at the time of submission. In addition, after award but prior to the submission of the progress schedule, Consultant, Contract Administrator, and Contractor shall meet with all utility owners and secure from them a schedule of utility relocation; provided, however, that neither Consultant nor Town shall be responsible for the nonperformance by the utility owners. 3.2. At a time specified by Consultant, but before Contractor starts the Work at the Project site, a conference attended by Contractor, Consultant, and others as deemed appropriate by Contract Administrator, will be held to discuss the schedules referred to in Section 3.1; to discuss procedures for handling Shop Drawings and other submittals and for processing Applications for Payment; and to establish a working understanding among the Parties as to the Work. 3.3. Within thirty-five (35) days from the Project Initiation Date set forth in the applicable Notice to Proceed, a conference attended by Contractor, Consultant, and others, as appropriate, will be held to finalize the schedules submitted in accordance with Section 3.1. Within forty-five

  • Preliminary 1. Short title

  • Preliminary Title Report (a) Within two (2) days following the Opening of Escrow, Seller shall provide Buyer a copy of its existing title insurance policy, exception documents and survey, and within twelve (12) days following the Opening of Escrow, Buyer will have prepared a Preliminary Title Report/Commitment for owners title insurance for the Property showing all liens, encumbrances and other matters affecting the title to the Property (the “Title Report”) and will provide a copy thereof together with legible copies of the documents shown as title exceptions or requirements therein to Seller. Buyer shall have ten (10) days following issuance of the Title Report to object, in Buyer’s sole and absolute discretion, to any other items contained in the Title Report . Buyer shall have until the end of the Review Period to object to any items contained in the Survey (as that term is defined in Section 3.2). Should Buyer object to any provisions contained therein, Seller shall, within five (5) days of the receipt of any such objections, advise Buyer of which title objections it will cure. Thereafter, prior to the later of five (5) days following (x) the expiration of the Review Period or (y) receipt of Seller’s title response notice, Buyer may either: (i) reject the Title Report and the Survey, in which case this Agreement is terminated, the parties will have no further rights or obligations hereunder (except those which specifically survive the termination of this Agreement) and the Initial Deposit shall be immediately refunded to Buyer without further instruction; or (ii) Buyer can choose to accept the Title Report and Survey by the placement of the Additional Deposit, which signifies acceptance of the Title Report and Survey. Any cure of title objections which Seller has elected to undertake shall be completed no later than five (5) days prior to the Closing Date. If such cure has not been completed by such time, Buyer may at such time either: (i) reject the Title Report and the Survey, in which case this Agreement is terminated, the parties will have no further rights or obligations hereunder (except those which specifically survive the termination of this Agreement) and the ▇▇▇▇▇▇▇ Money Deposit shall be immediately refunded to Buyer without further instruction; or (ii) Buyer can choose to accept the Title Report and Survey. (b) If any amended Title Reports are issued from the same title company after the expiration of the Review Period, Buyer shall have until five (5) business days following receipt of the same to review the amendment and to accept or reject any new matters set forth on Schedule B - Section 2 (Exceptions) to the amended Title Report which do not arise from the act or omission to act on the part of Buyer or its agents (the “New Exception(s)”) and shall be deemed to have accepted the New Exception(s) unless written notice of rejection is given to Seller on or before the expiration of said five (5) business days. If any New Exception(s) is rejected by Buyer and Seller does not, within five (5) business days after Buyer’s rejection of the New Exception, agree to remove the New Exception, Buyer may either: (i) reject the Title Report and the Survey, in which case this Agreement is terminated, the parties will have no further rights or obligations hereunder (except those which specifically survive the termination of this Agreement) and the Initial Deposit shall be immediately refunded to Buyer without further instruction; or (ii) Buyer can choose to accept the Title Report and Survey by the placement of the Additional Deposit, which signifies acceptance of the Title Report and Survey. (c) In the event that Buyer accepts the Title Report, those matters listed on Schedule B, Section 2 (Exceptions to Title) of Title Report shall be the “Permitted Exceptions”. In no event shall Permitted Exceptions include liens, or documents evidencing liens, securing any indebtedness, any mechanics’ or materialmen’s liens or any claims or potential claims therefor covering the Property or any portion thereof (“Seller Liens”), each of which shall be paid in full by Seller and released at Closing. (d) Seller shall reasonably cooperate with Buyer to cause unacceptable matters to be removed from the Title Report, provided, however, that Seller shall have no obligation to expend money or obtain any endorsements in order to remove any title exceptions. Seller shall, however, cause any consensual monetary liens, if any, affecting the Property to be removed as of the Closing.

  • Preliminary Design § 4.3.1 Upon the Owner’s issuance of a written consent to proceed under Section 4.2.3, the Design-Builder shall prepare and submit a Preliminary Design to the Owner. The Preliminary Design shall include a report identifying any deviations from the Owner’s Criteria, and shall include the following: .1 Confirmation of the allocations of program functions; .2 Site plan; .3 Building plans, sections and elevations;