Common use of Preliminary Work Clause in Contracts

Preliminary Work. of suitable dimensions shall be dug at the point where the connection is to be made with the main & earth removed upto 15cm below the main. The flow of water in the water main shall also be disconnected by closing the sluice valves on the mains.

Appears in 1 contract

Sources: Construction Contract

Preliminary Work. A pit of suitable dimensions shall be dug at the point where the connection is to be made with the main & and earth removed removal upto 15cm below the main. The flow of water in the water main shall also be disconnected by closing the sluice slum or wheel valves on the mains.

Appears in 1 contract

Sources: Construction Contract