Preventive Maintenance Projects Sample Clauses

Preventive Maintenance Projects. For purposes of this Agreement, preventive maintenance projects include all projects under $5 million (construction costs) that provide cost effective treatments to an existing roadway system and its appurtenances with the intent to preserve the system, retard future deterioration, and maintain or improve the functional condition of the system without increasing structural or operational capacity. • These projects are routine, low-risk and generally non-controversial in which AHTD has a high-level of experience and documented procedures and processes in place for ensuring compliance with Federal requirements. These projects would not include complex or unique engineering features, would not traditionally involve major changes in scope or cost, would not jeopardize design standards, and would not impact the safety and/or operation of the roadway systems. • For these projects, FHWA will still provide oversight by using a risk based approach and process/program reviews. It is understood that FHWA’s approval of funds for these projects at either the preconstruction or construction phase constitutes a determination that the project in question is eligible for Federal-aid funds and that the appropriate Federal requirements have been met to date or defined steps are to be taken to ensure that requirements will be met.

Related to Preventive Maintenance Projects

  • Preventive Maintenance The Contractor shall provide necessary preventive maintenance, required testing and inspection, calibration and/or other work necessary to maintain the equipment in complete operational condition during the warranty period.

  • Preventative Maintenance Standards of applicable Professional Governing Body. Anesthesia and surgical equipment maintenance standards as per manufacturer specifications and guidelines, subject to review and acceptance by AHS.

  • Maintenance Program LESSEE's Maintenance Program

  • Routine Maintenance (i) CRC shall be responsible for Routine Maintenance when necessary or desirable to maintain the Shared Assets in a safe operating condition, and to permit and facilitate (A) the performance by CRC of its obligations pursuant to this Agreement, and (B) the use of Shared Assets by the Operators in accordance with this Agreement. (ii) CSXT or NSR, directly or through their respective affiliates, may perform the work which CRC performed prior to the date of this Agreement when (A) CRC does not possess the skills needed for such work, (B) CRC lacks the necessary employees to do such work in a timely fashion, or (C) CRC does not possess the equipment needed to do such work. CRC and the party performing the work shall agree to a reasonable fee for such work prior to performance. CRC, CSXT and NSR may agree to have additional work performed either by CSXT, NSR or their affiliates.

  • System Maintenance The Trust understands that USBFS will perform periodic maintenance to the System(s), which may cause temporary service interruptions. To the extent possible, USBFS shall notify the Trust of all planned outages and will perform any necessary maintenance during non-business hours.