Prior to the Delivery and installation of the TCS Clause Samples

Prior to the Delivery and installation of the TCS. 1 System, the Operator shall make, at its own expense, all alterations to and changes in its premises and equipment required to bring the site into complete conformance with the above referenced Site Plan Specifications, with respect to which the Operator shall obtain all necessary permissions and inspections, and which shall include but not be limited to making any required structural changes and the installation of: (a) electrical equipment and power lines up to the electrical inputs or control boxes attached to the TCS-1 System, as designated on the Site Plan Specifications; (b) water supply sources and equipment up to the water inflow points designated on the Site Plan Specifications; (c) water drainage and disposal sites and equipment from the water outflow points designated on the Site Plan Specifications; (d) air ventilation sources and equipment as designated on the Site Plan Specifications

Related to Prior to the Delivery and installation of the TCS

  • Delivery and Installation Delivery 7.1 Provided the conditions in clause 1.5 have been satisfied, we must, or must procure, the delivery of the System to the Premises. 7.2 The risk of loss or theft of, or damage to, the System passes to you on delivery of the System to the Premises.

  • Licenses for Permanent Installation The contractor must comply with all State mandatory licensing requirements prior to installation. Questions on licensing requirements should be directed to the State Licensing Board. Contractor must furnish and install all furniture and materials in compliance with all applicable codes, whether local, state, or federal; and that all permits or licenses required for installation will be obtained without cost to the State.

  • Equipment Installation In order to meet its obligations under this Agreement, a Party that owns, rents, or leases equipment (the equipment owner) may require installation of such equipment on property owned by another Party (the property owner), provided that the property is being used for an electric utility purpose and that the property owner shall not be required to do so if it would thereby be prevented from performing its own obligations or exercising its rights under this Agreement.

  • REMOVAL OF RECORDS FROM PREMISES Where performance of the Contract involves use by the Contractor (or the Contractor’s subsidiaries, affiliates, partners, agents or subcontractors) of Authorized User owned or licensed papers, files, computer disks or other electronic storage devices, data or records at Authorized User facilities or offices, or via remote access, the Contractor (or the Contractor’s subsidiaries, affiliates, partners, agents or subcontractors) shall not remotely access, modify, delete, copy or remove such Records without the prior written approval of the Authorized User. In no case, with or without the written approval of the Authorized User, can the Authorized User data be accessed, moved or sent outside the continental United States.

  • Cancellation and Destruction of Surrendered Receipts; Maintenance of Records All Receipts surrendered to the Depositary shall be cancelled by the Depositary. The Depositary is authorized to destroy Receipts so cancelled in accordance with its customary practices. Cancelled Receipts shall not be entitled to any benefits under this Deposit Agreement or be valid or obligatory for any purpose.