Procedures for Maintenance and Periodic Verification. 1.8.1. The Transmitter may at its sole discretion specify the maintenance criteria and the maximum time intervals between verification cycles for those parts of Customers’ facilities that may materially adversely affect the transmission system. The obligations for maintenance and performance re-verification shall be stipulated in the appropriate schedule to this Agreement. 1.8.2. Test switches shall be provided to isolate current and potential transformer input to the relays as well as a set of switches to isolate the relays tripping outputs from the power equipment control circuitry. 1.8.3. The reasonable cost of conducting maintenance and verification tests shall be borne by the Customer. 1.8.4. The Transmitter may appoint a representative to witness relevant maintenance and verification tests and the Customer shall permit the representative to be present while those tests are being conducted. 1.8.5. To ensure that the Transmitter’s representative can witness the relevant tests, the Customer shall submit the proposed test procedures and a test schedule to the Transmitter not less than ten business days before it proposes to carry out the test. Following receipt of the request, the Transmitter may delay for technical reasons the testing for as long as ten business days. 1.8.6. The reasonable costs associated with the witnessing of verification tests by the Transmitter’s representative shall be borne by the Customer. 1.8.7. If a verification test reveals that the electrical equipment or protective relay system covered under the operations schedule does not comply with requirements, the Customer shall: 1.8.7.1. promptly notify the Transmitter of that fact; 1.8.7.2. promptly advise the Transmitter of its proposed remedial steps and its timetable for their implementation; 1.8.7.3. diligently undertake appropriate remedial work and provide the Transmitter with monthly reports on progress; and 1.8.7.4. conduct further tests or monitoring on completing the remedial work, to confirm compliance with the relevant technical requirements. 1.8.8. The Transmitter’s reasonable costs associated with witnessing the performance tests following remedial work shall be borne by the Customer. 1.8.9. Customers shall make their maintenance records and verification test results, including up- to-date as-built drawings, available to the Transmitter upon request. M H HVI 51B 50 / 51 51V 64 79-25 A21 / B21 A27 / B27 A59 / B59 A64-27 / B64-27 A64-59 / B64-59 A81U / B81U A81O / B81O A87 / B87 F L1, L2 T1, T2 RT/TT Transformer Phase Backup Instantaneous / Timed Overcurrent Voltage Controlled Overcurrent Line Ground Protection Synchronizing Relay Line Phase Protection - A&B Group Undervoltage - A&B Group Overvoltage - A&B Group Ground Undervoltage - A&B Group Ground Overvoltage - A&B Group Underfrequency - A&B Group Overfrequency - A&B Group Transformer Differential - A&B Group Failure Protection Supply Line Power Transformer Remote or Transfer Trip for HVI Device Failure Protection Circuit Breaker Circuit Breaker with Reclosure HV Interrupting Device a) Circuit Breaker b) Circuit Switcher c) Vacuum Interrupter Motor Operated Disconnect Switch HV Transformer Bushing X LV Transformer Bushing
Appears in 1 contract
Sources: Connection Agreement
Procedures for Maintenance and Periodic Verification. 1.8.1. The Transmitter Transmitter, using good utility practice, may at its sole discretion specify the maintenance criteria and the maximum time intervals between verification cycles for those parts of Customers’ facilities that may materially adversely affect the transmission system. The obligations for maintenance and performance re-verification shall be stipulated in the appropriate schedule to this Connection Agreement.
1.8.2. Test switches shall be provided to isolate current and potential transformer input to the relays as well as a set of switches to isolate the relays tripping outputs from the power equipment control circuitry.
1.8.3. The reasonable cost of conducting maintenance and verification tests shall be borne by the Customer.
1.8.4. The Transmitter may appoint a representative to witness relevant maintenance and verification tests and the Customer shall permit the representative to be present while those tests are being conducted.
1.8.5. To ensure that the Transmitter’s representative can witness the relevant tests, the Customer shall submit the proposed test procedures and a test schedule to the Transmitter not less than ten business days before it proposes to carry out the test. Following receipt of the request, the Transmitter may delay for technical reasons the testing for as long as ten business days. The Transmitter will use best efforts to make the required test date.
1.8.6. The reasonable costs associated with the witnessing of verification tests by the Transmitter’s representative shall be borne by the Customer.
1.8.7. If a verification test reveals that the electrical equipment or protective relay system covered under the operations schedule does not comply with requirements, the Customer shall:
1.8.7.1. promptly notify the Transmitter of that fact;
1.8.7.2. promptly advise the Transmitter of its proposed remedial steps and its timetable for their implementation;
1.8.7.3. diligently undertake appropriate remedial work and provide the Transmitter with monthly reports on progress; and
1.8.7.4. conduct further tests or monitoring on completing the remedial work, to confirm compliance with the relevant technical requirements.
1.8.8. The Transmitter’s reasonable costs associated with witnessing the performance tests following remedial work shall be borne by the Customer.
1.8.9. Customers shall make their maintenance records and verification test results, including up- up-to-date as-built drawings, available to the Transmitter upon request. M H HVI 51B 50 / 51 51V 64 79-25 A21 ▇▇▇ / B21 A27 ▇▇▇ ▇▇▇ / B27 A59 ▇▇▇ ▇▇▇ / B59 A64▇▇▇ ▇▇▇-27 ▇▇ / B64▇▇▇-27 A64▇▇ ▇▇▇-59 ▇▇ / B64▇▇▇-59 A81U ▇▇ ▇▇▇▇ / B81U ▇▇▇▇ A81O / B81O A87 / B87 F L1, L2 T1, T2 RT/TT Transformer Phase Backup Instantaneous / Timed Overcurrent Voltage Controlled Overcurrent Line Ground Protection Synchronizing Relay Line Phase Protection - A&B Group Undervoltage - A&B Group Overvoltage - A&B Group Ground Undervoltage - A&B Group Ground Overvoltage - A&B Group Underfrequency - A&B Group Overfrequency - A&B Group Transformer Differential - A&B Group Failure Protection Supply Line Power Transformer Remote or Transfer Trip for HVI Device Failure Protection Circuit Breaker Circuit Breaker with Reclosure HV Interrupting Device
a) Circuit Breaker
b) Circuit Switcher
c) Vacuum Interrupter Motor Operated Disconnect Switch HV Transformer Bushing X LV Transformer BushingBushing M H HVI
Appears in 1 contract
Sources: Connection Agreement
Procedures for Maintenance and Periodic Verification. 1.8.1. The Transmitter Transmitter, using good utility practice, may at its sole discretion specify the maintenance criteria and the maximum time intervals between verification cycles for those parts of Customers’ facilities that may materially adversely affect the transmission system. The obligations for maintenance and performance re-verification shall be stipulated in the appropriate schedule to this Connection Agreement.
1.8.2. Test switches shall be provided to isolate current and potential transformer input to the relays as well as a set of switches to isolate the relays tripping outputs from the power equipment control circuitry.
1.8.3. The reasonable cost of conducting maintenance and verification tests shall be borne by the Customer.
1.8.4. The Transmitter may appoint a representative to witness relevant maintenance and verification tests and the Customer shall permit the representative to be present while those tests are being conducted.
1.8.5. To ensure that the Transmitter’s representative can witness the relevant tests, the Customer shall submit the proposed test procedures and a test schedule to the Transmitter not less than ten business days before it proposes to carry out the test. Following receipt of the request, the Transmitter may delay for technical reasons the testing for as long as ten business days. The Transmitter will use best efforts to make the required test date.
1.8.6. The reasonable costs associated with the witnessing of verification tests by the Transmitter’s representative shall be borne by the Customer.
1.8.7. If a verification test reveals that the electrical equipment or protective relay system covered under the operations schedule does not comply with requirements, the Customer shall:
1.8.7.1. promptly notify the Transmitter of that fact;
1.8.7.2. promptly advise the Transmitter of its proposed remedial steps and its timetable for their implementation;
1.8.7.3. diligently undertake appropriate remedial work and provide the Transmitter with monthly reports on progress; and
1.8.7.4. conduct further tests or monitoring on completing the remedial work, to confirm compliance with the relevant technical requirements.
1.8.8. The Transmitter’s reasonable costs associated with witnessing the performance tests following remedial work shall be borne by the Customer.
1.8.9. Customers shall make their maintenance records and verification test results, including up- up-to-date as-built drawings, available to the Transmitter upon request. M H HVI 51B 50 / 51 51V 64 79-25 A21 ▇▇▇ / B21 A27 ▇▇▇ ▇▇▇ / B27 A59 ▇▇▇ ▇▇▇ / B59 A64▇▇▇ ▇▇▇-27 ▇▇ / B64▇▇▇-27 A64▇▇ ▇▇▇-59 ▇▇ / B64▇▇▇-59 A81U ▇▇ ▇▇▇▇ / B81U ▇▇▇▇ A81O / B81O A87 / B87 F L1, L2 T1, T2 RT/TT Transformer Phase Backup Instantaneous / Timed Overcurrent Voltage Controlled Overcurrent Line Ground Protection Synchronizing Relay Line Phase Protection - A&B Group Undervoltage - A&B Group Overvoltage - A&B Group Ground Undervoltage - A&B Group Ground Overvoltage - A&B Group Underfrequency - A&B Group Overfrequency - A&B Group Transformer Differential - A&B Group Failure Protection Supply Line Power Transformer Remote or Transfer Trip for HVI Device Failure Protection Circuit Breaker Circuit Breaker with Reclosure HV Interrupting Device
a) Circuit Breaker
b) Circuit Switcher
c) Vacuum Interrupter Motor Operated Disconnect Switch HV Transformer Bushing X LV Transformer BushingBushing HVI M H
Appears in 1 contract
Sources: Connection Agreement
Procedures for Maintenance and Periodic Verification. 1.8.1. The Transmitter Transmitter, using good utility practice, may at its sole discretion specify the maintenance criteria and the maximum time intervals between verification cycles for those parts of Customers’ facilities that may materially adversely affect the transmission system. The obligations for maintenance and performance re-verification shall be stipulated in the appropriate schedule to this Connection Agreement.
1.8.2. Test switches shall be provided to isolate current and potential transformer input to the relays as well as a set of switches to isolate the relays tripping outputs from the power equipment control circuitry.
1.8.3. The reasonable cost of conducting maintenance and verification tests shall be borne by the Customer.
1.8.4. The Transmitter may appoint a representative to witness relevant maintenance and verification tests and the Customer shall permit the representative to be present while those tests are being conducted.
1.8.5. To ensure that the Transmitter’s representative can witness the relevant tests, the Customer shall submit the proposed test procedures and a test schedule to the Transmitter not less than ten business days before it proposes to carry out the test. Following receipt of the request, the Transmitter may delay for technical reasons the testing for as long as ten business days. The Transmitter will use best efforts to make the required test date.
1.8.6. The reasonable costs associated with the witnessing of verification tests by the Transmitter’s representative shall be borne by the Customer.
1.8.7. If a verification test reveals that the electrical equipment or protective relay system covered under the operations schedule does not comply with requirements, the Customer shall:
1.8.7.1. promptly notify the Transmitter of that fact;
1.8.7.2. promptly advise the Transmitter of its proposed remedial steps and its timetable for their implementation;
1.8.7.3. diligently undertake appropriate remedial work and provide the Transmitter with monthly reports on progress; and
1.8.7.4. conduct further tests or monitoring on completing the remedial work, to confirm compliance with the relevant technical requirements.
1.8.8. The Transmitter’s reasonable costs associated with witnessing the performance tests following remedial work shall be borne by the Customer.
1.8.9. Customers shall make their maintenance records and verification test results, including up- up-to-date as-built drawings, available to the Transmitter upon request. M H HVI 51B 50 / 51 51V 64 79-25 A21 / B21 A27 / B27 A59 / B59 A64-27 / B64-27 A64-59 / B64-59 A81U / B81U A81O / B81O A87 / B87 F L1, L2 T1, T2 RT/TT Transformer Phase Backup Instantaneous / Timed Overcurrent Voltage Controlled Overcurrent Line Ground Protection Synchronizing Relay Line Phase Protection - A&B Group Undervoltage - A&B Group Overvoltage - A&B Group Ground Undervoltage - A&B Group Ground Overvoltage - A&B Group Underfrequency - A&B Group Overfrequency - A&B Group Transformer Differential - A&B Group Failure Protection Supply Line Power Transformer Remote or Transfer Trip for HVI Device Failure Protection Circuit Breaker Circuit Breaker with Reclosure HV Interrupting Device
a) Circuit Breaker
b) Circuit Switcher
c) Vacuum Interrupter Motor Operated Disconnect Switch HV Transformer Bushing X LV Transformer BushingBushing HVI R M H
Appears in 1 contract
Procedures for Maintenance and Periodic Verification. 1.8.1. The Transmitter Transmitter, using good utility practice, may at its sole discretion specify the maintenance criteria and the maximum time intervals between verification cycles for those parts of Customers’ facilities that may materially adversely affect the transmission system. The obligations for maintenance and performance re-verification shall be stipulated in the appropriate schedule to this Agreement.
1.8.2. Test switches shall be provided to isolate current and potential transformer input to the relays as well as a set of switches to isolate the relays tripping outputs from the power equipment control circuitry.
1.8.3. The reasonable cost of conducting maintenance and verification tests shall be borne by the Customer.
1.8.4. The Transmitter may appoint a representative to witness relevant maintenance and verification tests and the Customer shall permit the representative to be present while those tests are being conducted.
1.8.5. To ensure that the Transmitter’s representative can witness the relevant tests, the Customer shall submit the proposed test procedures and a test schedule to the Transmitter not less than ten business days before it proposes to carry out the test. Following receipt of the request, the Transmitter may delay for technical reasons the testing for as long as ten business days. The Transmitter will use best efforts to make the required test date.
1.8.6. The reasonable costs associated with the witnessing of verification tests by the Transmitter’s representative shall be borne by the Customer.
1.8.7. If a verification test reveals that the electrical equipment or protective relay system covered under the operations schedule does not comply with requirements, the Customer shall:
1.8.7.1. promptly notify the Transmitter of that fact;
1.8.7.2. promptly advise the Transmitter of its proposed remedial steps and its timetable for their implementation;
1.8.7.3. diligently undertake appropriate remedial work and provide the Transmitter with monthly reports on progress; and
1.8.7.4. conduct further tests or monitoring on completing the remedial work, to confirm compliance with the relevant technical requirements.
1.8.8. The Transmitter’s reasonable costs associated with witnessing the performance tests following remedial work shall be borne by the Customer.
1.8.9. Customers shall make their maintenance records and verification test results, including up- up-to-date as-built drawings, available to the Transmitter upon request. M H HVI 51B 50 / 51 51V 64 79-25 A21 / B21 A27 ▇▇▇ ▇▇▇ / B27 A59 ▇▇▇ ▇▇▇ / B59 A64▇▇▇ ▇▇4-▇▇ / ▇▇▇-27 ▇▇ ▇▇▇-▇▇ / B64▇▇▇-27 A64-59 ▇▇ ▇▇▇▇ / B64-59 A81U / B81U A81O ▇▇▇▇ ▇▇1O / B81O A87 / B87 F L1, L2 T1, T2 RT/TT Transformer Phase Backup Instantaneous / Timed Overcurrent Voltage Controlled Overcurrent Line Ground Protection Synchronizing Relay Line Phase Protection - A&B Group Undervoltage - A&B Group Overvoltage - A&B Group Ground Undervoltage - A&B Group Ground Overvoltage - A&B Group Underfrequency - A&B Group Overfrequency - A&B Group Transformer Differential - A&B Group Failure Protection Supply Line Power Transformer Remote or Transfer Trip for HVI Device Failure Protection Circuit Breaker Circuit Breaker with Reclosure HV Interrupting Device
a) Circuit Breaker
b) Circuit Switcher
c) Vacuum Interrupter Motor Operated Disconnect Switch HV Transformer Bushing X LV Transformer Bushing
Appears in 1 contract
Sources: Connection Agreement
Procedures for Maintenance and Periodic Verification. 1.8.1. The Transmitter may at its sole discretion specify the maintenance criteria and the maximum time intervals between verification cycles for those parts of Customers’ facilities that may materially adversely affect the transmission system. The obligations for maintenance and performance re-verification shall be stipulated in the appropriate schedule to this Agreement.
1.8.2. Test switches shall be provided to isolate current and potential transformer input to the relays as well as a set of switches to isolate the relays tripping outputs from the power equipment control circuitry.
1.8.3. The reasonable cost of conducting maintenance and verification tests shall be borne by the Customer.
1.8.4. The Transmitter may appoint a representative to witness relevant maintenance and verification tests and the Customer shall permit the representative to be present while those tests are being conducted.
1.8.5. To ensure that the Transmitter’s representative can witness the relevant tests, the Customer shall submit the proposed test procedures and a test schedule to the Transmitter not less than ten business days before it proposes to carry out the test. Following receipt of the request, the Transmitter may delay for technical reasons the testing for as long as ten business days.
1.8.6. The reasonable costs associated with the witnessing of verification tests by the Transmitter’s representative shall be borne by the Customer.
1.8.7. If a verification test reveals that the electrical equipment or protective relay system covered under the operations schedule does not comply with requirements, the Customer shall:
1.8.7.1. promptly notify the Transmitter of that fact;
1.8.7.2. promptly advise the Transmitter of its proposed remedial steps and its timetable for their implementation;
1.8.7.3. diligently undertake appropriate remedial work and provide the Transmitter with monthly reports on progress; and
1.8.7.4. conduct further tests or monitoring on completing the remedial work, to confirm compliance with the relevant technical requirements.
1.8.8. The Transmitter’s reasonable costs associated with witnessing the performance tests following remedial work shall be borne by the Customer.
1.8.9. Customers shall make their maintenance records and verification test results, including up- to-date as-built drawings, available to the Transmitter upon request. M H HVI 51B 50 / 51 51V 64 79-25 A21 ▇▇▇ / B21 A27 ▇▇▇ ▇▇▇ / B27 A59 ▇▇▇ ▇▇▇ / B59 A64▇▇▇ ▇▇▇-27 ▇▇ / B64▇▇▇-27 A64▇▇ ▇▇▇-59 ▇▇ / B64▇▇▇-59 A81U ▇▇ ▇▇▇▇ / B81U ▇▇▇▇ A81O / B81O A87 / B87 F L1, L2 T1, T2 RT/TT Transformer Phase Backup Instantaneous / Timed Overcurrent Voltage Controlled Overcurrent Line Ground Protection Synchronizing Relay Line Phase Protection - A&B Group Undervoltage - A&B Group Overvoltage - A&B Group Ground Undervoltage - A&B Group Ground Overvoltage - A&B Group Underfrequency - A&B Group Overfrequency - A&B Group Transformer Differential - A&B Group Failure Protection Supply Line Power Transformer Remote or Transfer Trip for HVI Device Failure Protection Circuit Breaker Circuit Breaker with Reclosure HV Interrupting Device
a) Circuit Breaker
b) Circuit Switcher
c) Vacuum Interrupter Motor Operated Disconnect Switch HV Transformer Bushing X LV Transformer Bushing
Appears in 1 contract
Sources: Connection Agreement
Procedures for Maintenance and Periodic Verification. 1.8.1. The Transmitter Transmitter, using good utility practice, may at its sole discretion specify the maintenance criteria and the maximum time intervals between verification cycles for those parts of Customers’ Customers= facilities that may materially adversely affect the transmission system. The obligations for maintenance and performance re-verification shall be stipulated in the appropriate schedule to this Agreement.
1.8.2. Test switches shall be provided to isolate current and potential transformer input to the relays as well as a set of switches to isolate the relays tripping outputs from the power equipment control circuitry.
1.8.3. The reasonable cost of conducting maintenance and verification tests shall be borne by the Customer.
1.8.4. The Transmitter may appoint a representative to witness relevant maintenance and verification tests and the Customer shall permit the representative to be present while those tests are being conducted.
1.8.5. To ensure that the Transmitter’s =s representative can witness the relevant tests, the Customer shall submit the proposed test procedures and a test schedule to the Transmitter not less than ten business days before it proposes to carry out the test. Following receipt of the request, the Transmitter may delay for technical reasons the testing for as long as ten business days. The Transmitter will use best efforts to make the required test date.
1.8.6. The reasonable costs associated with the witnessing of verification tests by the Transmitter’s =s representative shall be borne by the Customer.
1.8.7. If a verification test reveals that the electrical equipment or protective relay system covered under the operations schedule does not comply with requirements, the Customer shall:
1.8.7.1. promptly notify the Transmitter of that fact;
1.8.7.2. promptly advise the Transmitter of its proposed remedial steps and its timetable for their implementation;
1.8.7.3. diligently undertake appropriate remedial work and provide the Transmitter with monthly reports on progress; and
1.8.7.4. conduct further tests or monitoring on completing the remedial work, to confirm compliance with the relevant technical requirements.
1.8.8. The Transmitter’s =s reasonable costs associated with witnessing the performance tests following remedial work shall be borne by the Customer.
1.8.9. Customers shall make their maintenance records and verification test results, including up- up-to-date as-built drawings, available to the Transmitter upon request. M H HVI SCHEDULE E (CONT=D) 51B 50 / 51 51V 64 79-25 A21 ▇▇▇ / B21 A27 ▇▇▇ ▇▇▇ / B27 A59 ▇▇▇ ▇▇▇ / B59 A64▇▇▇ ▇▇▇-27 ▇▇ / B64▇▇▇-27 A64▇▇ ▇▇▇-59 ▇▇ / B64▇▇▇-59 A81U ▇▇ ▇▇▇▇ / B81U ▇▇▇▇ A81O / B81O A87 / B87 F L1, L2 T1, T2 RT/TT Transformer Phase Backup Instantaneous / Timed Overcurrent Voltage Controlled Overcurrent Line Ground Protection Synchronizing Relay Line Phase Protection - A&B Group Undervoltage - A&B Group Overvoltage - A&B Group Ground Undervoltage - A&B Group Ground Overvoltage - A&B Group Underfrequency - A&B Group Overfrequency - A&B Group Transformer Differential - A&B Group Failure Protection Supply Line Power Transformer Remote or Transfer Trip for HVI Device Failure Protection Circuit Breaker Circuit Breaker with Reclosure HV Interrupting Device
a) Circuit Breaker
b) Circuit Switcher
c) Vacuum Interrupter Motor Operated Disconnect Switch HV Transformer Bushing X LV Transformer BushingBushing M HVI SCHEDULE E (CONT=D)
Appears in 1 contract
Sources: Connection Agreement
Procedures for Maintenance and Periodic Verification. Deleted: Proposed Revised Deleted: - Amended Proposal (June 2, 2005)
1.8.1. The Transmitter Transmitter, using good utility practice, may at its sole discretion specify the maintenance criteria and the maximum time intervals between verification cycles for those parts of Customers’ Customers= facilities that may materially adversely affect the transmission system. The obligations for maintenance and performance re-verification shall be stipulated in the appropriate schedule to this Agreement.
1.8.2. Test switches shall be provided to isolate current and potential transformer input to the relays as well as a set of switches to isolate the relays tripping outputs from the power equipment control circuitry.
1.8.3. The reasonable cost of conducting maintenance and verification tests shall be borne by the Customer.
1.8.4. The Transmitter may appoint a representative to witness relevant maintenance and verification tests and the Customer shall permit the representative to be present while those tests are being conducted.
1.8.5. To ensure that the Transmitter’s =s representative can witness the relevant tests, the Customer shall submit the proposed test procedures and a test schedule to the Transmitter not less than ten business days before it proposes to carry out the test. Following receipt of the request, the Transmitter may delay for technical reasons the testing for as long as ten business days. The Transmitter will use best efforts to make the required test date.
1.8.6. The reasonable costs associated with the witnessing of verification tests by the Transmitter’s =s representative shall be borne by the Customer.
1.8.7. If a verification test reveals that the electrical equipment or protective relay system covered under the operations schedule does not comply with requirements, the Customer shall:
1.8.7.1. promptly notify the Transmitter of that fact;
1.8.7.2. promptly advise the Transmitter of its proposed remedial steps and its timetable for their implementation;
1.8.7.3. diligently undertake appropriate remedial work and provide the Transmitter with monthly reports on progress; and
1.8.7.4. conduct further tests or monitoring on completing the remedial work, to confirm compliance with the relevant technical requirements.. Transmission System Code, Appendix 1 (version B)
1.8.8. The Transmitter’s =s reasonable costs associated with witnessing the performance tests following remedial work shall be borne by the Customer.
1.8.9. Customers shall make their maintenance records and verification test results, including up- up-to-date as-built drawings, available to the Transmitter upon request. M H Transmission System Code, Appendix 1 (version B) SCHEDULE E (CONT=D) HVI 51B 50 / 51 51V 64 79-25 A21 ▇▇▇ / B21 A27 ▇▇▇ ▇▇▇ / B27 A59 ▇▇▇ ▇▇▇ / B59 A64▇▇▇ ▇▇▇-27 ▇▇ / B64▇▇▇-27 A64▇▇ ▇▇▇-59 ▇▇ / B64▇▇▇-59 A81U ▇▇ ▇▇▇▇ / B81U ▇▇▇▇ A81O / B81O A87 / B87 F L1, L2 T1, T2 RT/TT Transformer Phase Backup Instantaneous / Timed Overcurrent Voltage Controlled Overcurrent Line Ground Protection Synchronizing Relay Line Phase Protection - A&B Group Undervoltage - A&B Group Overvoltage - A&B Group Ground Undervoltage - A&B Group Ground Overvoltage - A&B Group Underfrequency - A&B Group Overfrequency - A&B Group Transformer Differential - A&B Group Failure Protection Supply Line Power Transformer Remote or Transfer Trip for HVI Device Failure Protection R Circuit Breaker Circuit Breaker with Reclosure HV Interrupting Device
a) Circuit Breaker
b) Circuit Switcher
c) Vacuum Interrupter Motor Operated Disconnect Switch HV Transformer Bushing X LV Transformer BushingBushing M H Transmission System Code, Appendix 1 (version B) SCHEDULE E (CONT=D)
Appears in 1 contract
Sources: Connection Agreement
Procedures for Maintenance and Periodic Verification. 1.8.1. The Transmitter Transmitter, using good utility practice, may at its sole discretion specify the maintenance criteria and the maximum time intervals between verification cycles for those parts of Customers’ Customers= facilities that may materially adversely affect the transmission system. The obligations for maintenance and performance re-verification shall be stipulated in the appropriate schedule to this Agreement.
1.8.2. Test switches shall be provided to isolate current and potential transformer input to the relays as well as a set of switches to isolate the relays tripping outputs from the power equipment control circuitry.
1.8.3. The reasonable cost of conducting maintenance and verification tests shall be borne by the Customer.
1.8.4. The Transmitter may appoint a representative to witness relevant maintenance and verification tests and the Customer shall permit the representative to be present while those tests are being conducted.
1.8.5. To ensure that the Transmitter’s =s representative can witness the relevant tests, the Customer shall submit the proposed test procedures and a test schedule to the Transmitter not less than ten business days before it proposes to carry out the test. Following receipt of the request, the Transmitter may delay for technical reasons the testing for as long as ten business days. The Transmitter will use best efforts to make the required test date.
1.8.6. The reasonable costs associated with the witnessing of verification tests by the Transmitter’s =s representative shall be borne by the Customer.
1.8.7. If a verification test reveals that the electrical equipment or protective relay system covered under the operations schedule does not comply with requirements, the Customer shall:
1.8.7.1. promptly notify the Transmitter of that fact;
1.8.7.2. promptly advise the Transmitter of its proposed remedial steps and its timetable for their implementation;
1.8.7.3. diligently undertake appropriate remedial work and provide the Transmitter with monthly reports on progress; and
1.8.7.4. conduct further tests or monitoring on completing the remedial work, to confirm compliance with the relevant technical requirements.
1.8.8. The Transmitter’s =s reasonable costs associated with witnessing the performance tests following remedial work shall be borne by the Customer.
1.8.9. Customers shall make their maintenance records and verification test results, including up- up-to-date as-built drawings, available to the Transmitter upon request. M H HVI SCHEDULE E (CONT=D) 51B 50 / 51 51V 64 79-25 A21 ▇▇▇ / B21 A27 ▇▇▇ ▇▇▇ / B27 A59 ▇▇▇ ▇▇▇ / B59 A64▇▇▇ ▇▇▇-27 ▇▇ / B64▇▇▇-27 A64▇▇ ▇▇▇-59 ▇▇ / B64▇▇▇-59 A81U ▇▇ ▇▇▇▇ / B81U ▇▇▇▇ A81O / B81O A87 / B87 F L1, L2 T1, T2 RT/TT Transformer Phase Backup Instantaneous / Timed Overcurrent Voltage Controlled Overcurrent Line Ground Protection Synchronizing Relay Line Phase Protection - A&B Group Undervoltage - A&B Group Overvoltage - A&B Group Ground Undervoltage - A&B Group Ground Overvoltage - A&B Group Underfrequency - A&B Group Overfrequency - A&B Group Transformer Differential - A&B Group Failure Protection Supply Line Power Transformer Remote or Transfer Trip for HVI Device Failure Protection Circuit Breaker Circuit Breaker with Reclosure HV Interrupting Device
a) Circuit Breaker
b) Circuit Switcher
c) Vacuum Interrupter Motor Operated Disconnect Switch HV Transformer Bushing X LV Transformer BushingBushing HVI M H SCHEDULE E (CONT=D)
Appears in 1 contract
Sources: Connection Agreement
Procedures for Maintenance and Periodic Verification. 1.8.1. The Transmitter Transmitter, using good utility practice, may at its sole discretion specify the maintenance criteria and the maximum time intervals between verification cycles for those parts of Customers’ Customers= facilities that may materially adversely affect the transmission system. The obligations for maintenance and performance re-verification shall be stipulated in the appropriate schedule to this Agreement.
1.8.2. Test switches shall be provided to isolate current and potential transformer input to the relays as well as a set of switches to isolate the relays tripping outputs from the power equipment control circuitry.
1.8.3. The reasonable cost of conducting maintenance and verification tests shall be borne by the Customer.
1.8.4. The Transmitter may appoint a representative to witness relevant maintenance and verification tests and the Customer shall permit the representative to be present while those tests are being conducted.
1.8.5. To ensure that the Transmitter’s =s representative can witness the relevant tests, the Customer shall submit the proposed test procedures and a test schedule to the Transmitter not less than ten business days before it proposes to carry out the test. Following receipt of the request, the Transmitter may delay for technical reasons the testing for as long as ten business days. The Transmitter will use best efforts to make the required test date.
1.8.6. The reasonable costs associated with the witnessing of verification tests by the Transmitter’s =s representative shall be borne by the Customer.
1.8.7. If a verification test reveals that the electrical equipment or protective relay system covered under the operations schedule does not comply with requirements, the Customer shall:
1.8.7.1. promptly notify the Transmitter of that fact;
1.8.7.2. promptly advise the Transmitter of its proposed remedial steps and its timetable for their implementation;
1.8.7.3. diligently undertake appropriate remedial work and provide the Transmitter with monthly reports on progress; and
1.8.7.4. conduct further tests or monitoring on completing the remedial work, to confirm compliance with the relevant technical requirements.
1.8.8. The Transmitter’s =s reasonable costs associated with witnessing the performance tests following remedial work shall be borne by the Customer.
1.8.9. Customers shall make their maintenance records and verification test results, including up- up-to-date as-built drawings, available to the Transmitter upon request. M H SCHEDULE E (CONT=D) HVI 51B 50 / 51 51V 64 79-25 A21 ▇▇▇ / B21 A27 ▇▇▇ ▇▇▇ / B27 A59 ▇▇▇ ▇▇▇ / B59 A64▇▇▇ ▇▇▇-27 ▇▇ / B64▇▇▇-27 A64▇▇ ▇▇▇-59 ▇▇ / B64▇▇▇-59 A81U ▇▇ ▇▇▇▇ / B81U ▇▇▇▇ A81O / B81O A87 / B87 F L1, L2 T1, T2 RT/TT Transformer Phase Backup Instantaneous / Timed Overcurrent Voltage Controlled Overcurrent Line Ground Protection Synchronizing Relay Line Phase Protection - A&B Group Undervoltage - A&B Group Overvoltage - A&B Group Ground Undervoltage - A&B Group Ground Overvoltage - A&B Group Underfrequency - A&B Group Overfrequency - A&B Group Transformer Differential - A&B Group Failure Protection Supply Line Power Transformer Remote or Transfer Trip for HVI Device Failure Protection Circuit Breaker Circuit Breaker with Reclosure HV Interrupting Device
a) Circuit Breaker
b) Circuit Switcher
c) Vacuum Interrupter Motor Operated Disconnect Switch HV Transformer Bushing X LV Transformer BushingBushing M H SCHEDULE E (CONT=D)
Appears in 1 contract
Procedures for Maintenance and Periodic Verification. 1.8.1. The Transmitter Transmitter, using good utility practice, may at its sole discretion specify the maintenance criteria and the maximum time intervals between verification cycles for those parts of Customers’ facilities that may materially adversely affect the transmission system. The obligations for maintenance and performance re-verification shall be stipulated in the appropriate schedule to this Agreement.
1.8.2. Test switches shall be provided to isolate current and potential transformer input to the relays as well as a set of switches to isolate the relays tripping outputs from the power equipment control circuitry.
1.8.3. The reasonable cost of conducting maintenance and verification tests shall be borne by the Customer.
1.8.4. The Transmitter may appoint a representative to witness relevant maintenance and verification tests and the Customer shall permit the representative to be present while those tests are being conducted.
1.8.5. To ensure that the Transmitter’s representative can witness the relevant tests, the Customer shall submit the proposed test procedures and a test schedule to the Transmitter not less than ten business days before it proposes to carry out the test. Following receipt of the request, the Transmitter may delay for technical reasons the testing for as long as ten business days. The Transmitter will use best efforts to make the required test date.
1.8.6. The reasonable costs associated with the witnessing of verification tests by the Transmitter’s representative shall be borne by the Customer.
1.8.7. If a verification test reveals that the electrical equipment or protective relay system covered under the operations schedule does not comply with requirements, the Customer shall:
1.8.7.1. promptly notify the Transmitter of that fact;
1.8.7.2. promptly advise the Transmitter of its proposed remedial steps and its timetable for their implementation;
1.8.7.3. diligently undertake appropriate remedial work and provide the Transmitter with monthly reports on progress; and
1.8.7.4. conduct further tests or monitoring on completing the remedial work, to confirm compliance with the relevant technical requirements.
1.8.8. The Transmitter’s reasonable costs associated with witnessing the performance tests following remedial work shall be borne by the Customer.
1.8.9. Customers shall make their maintenance records and verification test results, including up- up-to-date as-built drawings, available to the Transmitter upon request. M H HVI 51B 50 / 51 51V 64 79-25 A21 ▇▇▇ / B21 A27 ▇▇▇ ▇▇▇ / B27 A59 ▇▇▇ ▇▇▇ / B59 A64▇▇▇ ▇▇▇-27 ▇▇ / B64▇▇▇-27 A64▇▇ ▇▇▇-59 ▇▇ / B64▇▇▇-59 A81U ▇▇ ▇▇▇▇ / B81U ▇▇▇▇ A81O / B81O A87 / B87 F L1, L2 T1, T2 RT/TT Transformer Phase Backup Instantaneous / Timed Overcurrent Voltage Controlled Overcurrent Line Ground Protection Synchronizing Relay Line Phase Protection - A&B Group Undervoltage - A&B Group Overvoltage - A&B Group Ground Undervoltage - A&B Group Ground Overvoltage - A&B Group Underfrequency - A&B Group Overfrequency - A&B Group Transformer Differential - A&B Group Failure Protection Supply Line Power Transformer Remote or Transfer Trip for HVI Device Failure Protection Circuit Breaker Circuit Breaker with Reclosure HV Interrupting Device
a) Circuit Breaker
b) Circuit Switcher
c) Vacuum Interrupter Motor Operated Disconnect Switch HV Transformer Bushing X LV Transformer Bushing
Appears in 1 contract
Sources: Connection Agreement