Process Flow Charts Sample Clauses

The 'Process Flow Charts' clause defines the requirement for creating and maintaining visual diagrams that map out the sequence of steps in a particular process or workflow. Typically, this clause mandates that parties develop flow charts to illustrate how tasks, decisions, and responsibilities move from one stage to another, often as part of project management or operational procedures. By providing a clear visual representation, the clause helps ensure all stakeholders understand the process, reduces misunderstandings, and facilitates smoother coordination and communication.
Process Flow Charts. Supplier shall provide a general process flowchart for the Product(s) and major subassemblies as agreed to by both parties and shall identify all assembly, test, and inspection subprocesses.
Process Flow Charts. The Supplier must represent his production processes from the reception of goods up to dispatching in process flow charts. These process flow charts must show in an unambiguous and clear manner the different process steps, as well as the interfaces with his subcontractors and with Oerlikon. The Supplier must update his process flow charts continuously during the entire term of the project. History of Changes (scope of change) must also be updated and adjusted continuously. 10.1 Prozessablaufplan: Der Lieferant muss seine Herstellungsprozesse vom Wareneingang bis zur Auslieferung in Prozessablaufplänen darstellen. Diese enthalten eindeutig erkenntlich und nachvollziehbar die Prozessabschnitte sowie die Schnittstellen zu seinen Unterlieferanten und zu Oerlikon. Der Lieferant hält die Prozessablaufpläne während der gesamten Projektlaufzeit ständig auf aktuellem Stand. Die Änderungshistorie (Änderungsumfänge) muss aktualisiert und auf letztstand gehalten werden.
Process Flow Charts. Seller shall provide a general process flow chart for the Product(s) and major subassemblies as agreed to by both parties and shall identify all assembly, test, and inspection sub processes.
Process Flow Charts. Infortrend shall provide a general process flowchart for the Product(s) and major subassemblies as agreed to by Dot Hill, and Infortrend and shall identify all assembly, test, and inspection subprocesses.

Related to Process Flow Charts

  • Maintenance Manual No later than 60 (sixty) days prior to the Project Completion Date, the Contractor shall, in consultation with the Authority’s Engineer, evolve a maintenance manual (the “Maintenance Manual”) for the regular and preventive maintenance of the Project Highway in conformity with the Specifications and Standards, safety requirements and Good Industry Practice, and shall provide 5 (five) copies thereof to the Authority’s Engineer. The Authority’s Engineer shall review the Maintenance Manual within 15 (fifteen) days of its receipt and communicate its comments to the Contractor for necessary modifications, if any.

  • Flexible Work Schedule A flexible work schedule is any schedule that is not a regular, alternate, 9/80, or 4/10 work schedule and where the employee is not scheduled to work more than 40 hours in the "workweek" as defined in Subsections F. and H., below.

  • Operation and Maintenance Manuals Receipts for transmittal of Operation and Maintenance Manuals, Brochures and Data to the Design Professional (or Commissioning Agent) as required by Section 6.1.1.5.

  • Minimum Customer Support Requirements for TIPS Sales Vendor shall provide timely and commercially reasonable support for TIPS Sales or as agreed to in the applicable Supplemental Agreement.

  • Trunk Group Architecture and Traffic Routing 5.2.1 The Parties shall jointly establish Access Toll Connecting Trunks between CLEC and CBT by which they will jointly provide Tandem-transported Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic from and to CLEC's Customers. 5.2.2 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access and non-translated Toll Free traffic (e.g., 800/888) to allow CLEC’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier that is connected to the CBT access Tandem. 5.2.3 The Access Toll Connecting Trunks shall be one-way or two-way trunks, as mutually agreed, connecting an End Office Switch that CLEC utilizes to provide Telephone Exchange Service and Switched Exchange Access Service in the given LATA to an access Tandem Switch CBT utilizes to provide Exchange Access in the LATA.