Processing Facility Sample Clauses

POPULAR SAMPLE Copied 1 times
Processing Facility. Any facility selected by Contractor which is designed, operated and legally permitted for the purpose of receiving and Processing Green Waste and/or Recyclable Materials and which is County approved.
Processing Facility. Concessionaire shall on the date of expiry of the Concession Period, hand back peaceful possession of the Project facilities to the Lead ULB free of cost and free from all encumbrances and in good operational condition. Upon service of the Termination Notice or at least 12 months before the expiry of the term of agreement, a joint inspection of the Project Facilities shall be undertaken by Independent Engineer/ the Lead ULB and Concessionaire. Concessionaire shall promptly undertake and complete such works/jobs on its own cost and expense, as may be required by the Lead ULB at least three months prior to the expiry of Concession Period and ensure that the Project Facilities may continue to meet such requirements even after the same are handed back to the Lead ULB.
Processing Facility. The licensed and permitted facility designated by the FRANCHISEE and approved by the TOWN, for the processing of Construction and Demolition Debris, and other materials as appropriate.
Processing Facility. The licensed and permitted facility designated by the 256 FRANCHISEE and approved by the CITY, for the processing of Construction and Demolition 257 Debris, and other materials as appropriate. 258 1.37 Recyclable Materials. Those materials which are capable of being recycled and 259 which would otherwise be processed as Organic Waste or disposed of as Garbage. Recyclable 260 Materials include newsprint (including inserts); mixed paper (including magazines, catalogs, 261 envelopes, junk mail, corrugated cardboard, brown bags and paper, paperboard, paper egg 262 cartons, office ledger paper, and telephone books); glass containers; aluminum beverage 263 containers; scrap and cast aluminum (not exceeding forty (40) pounds in weight nor two (2) feet
Processing Facility. The term "processing facility" means a facility where the processing of CEPs for a plan is conducted by a direct processor.
Processing Facility. Producers may request to send Produce to a facility to be pressed into juice provided they can demonstrate compliance with “Produce Sources,” immediately above. (See also Part III.
Processing Facility. The licensed and permitted facility selected by the 125 CONTRACTOR and approved by the CITY specifically designed, operated, and legally 126 permitted for the purpose of receiving, sorting, processing, storing, and/or transferring 127 Temporary Waste Collected pursuant to this Agreement. 128 1.26 Recyclable Materials. Those materials which are capable of being recycled and 129 which would otherwise be processed or disposed of as Temporary Waste. Recyclable Materials 130 include those materials defined by the CITY, including newsprint (including inserts); mixed 131 paper (including magazines, catalogs, envelopes, junk mail, corrugated cardboard, ▇▇▇▇▇ bags 132 and paper, paperboard, paper egg cartons, office ledger paper, and telephone books); glass 133 containers; aluminum beverage containers; scrap and cast aluminum (not exceeding forty (40) 134 pounds in weight nor two (2) feet in any dimension for any single item); steel including “tin” 135 cans, aerosol cans (empty, non-toxic products) and small scrap (not exceeding forty (40) 136 pounds in weight nor two (2) feet in any dimension for any single item); bimetal containers; 137 plastic bottles (#1-7); aluminum foil and pans; expanded polystyrene (EPS); and those materials 138 added by the CONTRACTOR from time to time.
Processing Facility. TFC Recycling shall maintain and deliver all Recyclable Materials collected to a Processing Facility which is operated in compliance with all applicable federal, state, local laws, regulations and/or standards throughout the term of this Agreement. TFC Recycling shall be responsible for ensuring the neat and orderly operation and appearance of the Processing Facility, to include the property on which the Processing Facility is located. TFC Recycling shall notify the Authority, in writing, not less than thirty (30) days before any relocation of the Processing Facility. TFC Recycling shall maintain all Processing Facilities in good repair at all times. TFC Recycling shall notify the Authority, in writing, if at any time the Processing Facility is in a condition in which processing capabilities or normal operations are expected to be interrupted for more than one week. TFC Recycling shall be responsible for managing all Residue resulting from processing of the Recyclable Materials. TFC Recycling shall bear all costs and full responsibility for the transport and disposal of Residue to a permitted solid waste disposal facility.
Processing Facility. Hauler shall deliver all Recyclable Material collected in City to the Eureka Recycling’s Materials Processing Facility (MRF) at ▇▇▇▇ ▇▇▇▇▇▇▇ ▇▇▇▇▇▇ NE, Minneapolis, Minnesota. The Contractor shall ensure that adequate recyclable material processing capacity will be provided at the MRF for City material collected. The Contractor shall provide written notice to the City at least 30 days in advance of any substantial change in these or subsequent plans for receiving and processing Recyclable Material collected from the City.
Processing Facility. A non-Collection Site where Processing occurs.