Project Facilities Clause Samples
Project Facilities. The Concessionaire shall construct the Project Facilities in accordance with the provisions of this Agreement including the Background Documents.
Project Facilities. The Project includes an advance recycled water treatment plant, which is located at the SMWD’s Finisterra Recycled Water pump Station site. The plant with a design capacity of 600 AFY includes micro screens, microfiltration or ultrafiltration, reverse osmosis, ultraviolet irradiation, and chemical pH adjustment to reduce nitrogen loading to the lake. No storage feature is included in the plant because it is designed to provide peak summer demand to the lake. The brine from the plant is discharged either into an existing 12-inch sewer line, through a dedicated brine line that conveys the brine downstream of the plant, or a brine concentrator that reduces the water content of the brine.
Project Facilities. 2.2.1 The Concessionaire shall develop the Project comprising of the Project Facilities as described in detail in Schedule 3 (“Project Facilities”) which include Mandatory Development Obligations and Optional Project Facilities.
2.2.2 All the Project Facilities shall be developed as per the minimum Specifications and Standards set-out for the purpose in the Schedule 4.
2.2.3 While undertaking development of the Project, the Concessionaire shall adhere to latest amended National Building Code of India, other relevant IS Codes and practices, Development Control Regulations, FAR Limits, statutory requirements, laws of land, the principles of good industry practices and any other norms as applicable from time to time.
2.2.4 The Concessionaire shall be responsible for all the Applicable Permits and Approvals as may be required for the implementation of the Project.
2.2.5 The Concessionaire shall keep the Mandatory Development Obligations ready for operation and use within the Construction Period.
Project Facilities. The Concessionaire shall be responsible for providing at least the following facilities and specialty services in the Hospital:
Project Facilities. The Contractor shall construct the Project Facilities in accordance with the provisions of this Agreement. Such Project Facilities shall include:
(a) Toll plaza;
(b) Road side furniture;
(c) Street lighting;
(d) Pedestrian facilities;
(e) Tree plantation;
(f) Truck lay-byes;
(g) bus-bays and bus shelters;
(h) rest areas ;and
(i) others to be specified
Project Facilities. The facilities identified to be developed by the concessionaire are as follows:
Project Facilities. The Greenland Institute of Natural Resources (GINR) has a number of facilities that can be made available to the research projects. The number of facilities is limited, however, so each facility must be booked in advance by the project. The first project to book a facility gains the right to its use. For some facilities a fee will be charged. A preliminary invoice will be issued at the time of booking. If the preliminary invoice is not paid within the specified time (current month plus 10 days), the booking will be cancelled without notice. A final invoice or credit note will be issued after completion of the use of the facility. The project facilities include the following: • Work space (shared office space at GINR, including PC with Internet and printer access) • Laboratories (lab ware etc. must be supplied by the project) • Accommodations • Small boats with or without ▇▇▇▇▇▇▇ as arranged • Large boats, including ▇▇▇▇▇▇▇ • Snowmobiles • Cars Current terms, conditions, and prices are available on request from the centre’s logistics department. All special equipment – CTDs, ADCPs, GPS devices, etc. – and consumables necessary for the completion of the project should, as a rule, be provided by individual projects. It will be possible, however, to borrow equipment by arrangement with the centre coordinator, provided that it is available at GCRC and is not being used for other purposes.
Project Facilities. The project facilities or amenities at the Bus Terminal premises shall consist of, but not limited to, the following: 1 Bus Circulation and Parking of Buses ( at Ground Floor) Boarding Bays 50 Bays Ideal Bays/ Maintenance Bays 28 Bays
Project Facilities. This schedule indicates the minimum spatial and functional requirements of the facilities to be provided on the Project Highway (Total length of 11.90 km) with an aim to cater to the envisaged demand till the end of the concession period. The Contractor shall construct the Project Facilities in accordance with the provisions of this Agreement. Such Project Facilities shall include:
Project Facilities. The facility to be developed by the concessionaire is to set up a Paunch Waste treatment facility comprising of a biomethanation plant having a capacity of processing 70 TPD of Paunch Waste (“Project”) being generated at the Ghazipur ▇▇▇▇▇▇▇▇▇ House.