PROJECT OPENING Sample Clauses

PROJECT OPENING. Upon, and as a condition to, Project Opening, Tenant shall pay the Project Opening Fee described in Section 5(a)(ii). On or before the date of Project Opening, the parties shall execute a memorandum prepared by Landlord and reasonably acceptable to Tenant establishing the Project Opening date (and the date payments of Minimum Rent or Percentage Rent, as the case may be, shall be due under Section 5), which memorandum shall become an attachment to this Lease.
PROJECT OPENING. Borrower shall cause the Project Opening to occur on or before the Opening Date. The projected opening date of the Shop Space is anticipated to be August 25, 2016.

Related to PROJECT OPENING

  • Project Completion The Contractor agrees to schedule a final job walk with the County. If required, the County will prepare a list of incomplete items, the “Punch List”. The Contractor agrees to complete the “Punch List” corrections and schedule a final project completion job walk. The County will sign the “Punch List” as completed when determined, the project is finished. The Contractor agrees to submit the following along with its final payment request:

  • Project 3.01. The Recipient declares its commitment to the objectives of the Project. To this end, the Recipient shall carry out the Project in accordance with the provisions of Article IV of the General Conditions.

  • Project Overview With ever growing size of cities, ensuring high levels of physical security without significantly increasing the number of security personnel or budget seems to be a daunting task. A heightened sense of security and ever increasing challenges require new tactics with more access to integrated system and centralized information. This necessitates the need of designing and implementing Command and Control centers for critical infrastructure across different cities. A command and control center (CCC) in City Surveillance and Incident Response Project refers to a secure building in a government that operates as the surveillance monitoring center, coordination office and alarm monitoring center all in one. The CCC includes Video Surveillance room, Dial 100 Control room, Forensic Investigation Room, ITMS room and Data center & FMS/NOC Room. The CCC is the “nerve center” - a central administrative location from where overall assets and activities are monitored and managed. The command and control centers would be operated by State Police department. City Surveillance system would involve installation of high definition fixed and PTZ IP cameras, capable of providing optical zoom, to obtain quality video stream day in and day out for the Command & Control Center. A diversified IP based network infrastructure backbone would be deployed involving high speed fibre optics/ wireless technologies to carry video from cameras to the command and control center. The CCC would be equipped with huge video walls, workstations, video management servers and video data storage clusters of several hundred terabytes. The Command and Control Center would integrate with various security systems and sensors and enable the operators to carry out the coordinated response plans effectively. The Command & Control solution would allow the Video Surveillance Room operator/ Dial 100 operator to monitor the cameras, collect inputs, dissect information and make actionable recommendations. The system would provide configurable rules Collaborative Change Management monitoring-Feeds from various public and Capacity Building places where systems which include are already installed training of police like malls, personnel on various community centers, software's like airport and railway VMS,CCC,Dial station etc. 100,Forensic etc. Edge Equipments Network Connectivity (Cameras, Sensors, (Optical Fibre, Radio Panic Button, ITMS Communication, PRI etc.) Line, Switch etc.) with tailored alerts, dashboard visualizations, intelligent role based work flow, response tools and situation collaboration. Surveillance and Incident response project This RFP intends to select System Integrator’s who will be responsible for supply, installation, commissioning of procured items under this rate contract and FMS of Edge Equipments/items procured under this rate contract, existing items available in Abhay Command Center in 26 districts and items to be procured till project completion for this project in different cities of Rajasthan. Rate Contract for Supply, Installation, commissioning and FMS of Edge equipment’s under Surveillance and Incident Response Project in the State of Rajasthan (After Pre-bid)

  • Phase II A small portion of the work for the Phase II modifications to the Plattsburgh Substation will be performed by Transmission Owner, and the remainder will be performed by Clinton and ▇▇▇▇▇▇▇▇▇. A detailed definition of the specific scope for Transmission Owner and Clinton and ▇▇▇▇▇▇▇▇▇ including interface points shall be defined during the design phase and, as such documents become available, copies will be delivered to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The full scope includes the installation of wave traps, CCVT’s and modifications and/or additions to relaying on the MWP-1 and MWP- 2 lines. These lines will be reconfigured at the completion of Phase II to connect to ▇▇▇▇▇ and ▇▇▇▇▇▇▇ Substations on MWP-1 and the ▇▇▇▇ Substation on MWP-2. Clinton and ▇▇▇▇▇▇▇▇▇ will design the upgrades and purchase the materials based on the outline specification that was prepared and issued by Transmission Owner. The work to be performed by Clinton and ▇▇▇▇▇▇▇▇▇ will include both the materials for the exterior and interior installations and items for Transmission Owner installation inside the control building in existing relay panels and communication racks. In addition, Clinton and ▇▇▇▇▇▇▇▇▇ will be responsible for the exterior and interior construction work and will provide construction management services in coordination with Transmission Owner. The civil design for the foundations and the electrical design for the cable runs to the control room will be designed by, as approved by Transmission Owner, and installed under the supervision and control of Clinton and ▇▇▇▇▇▇▇▇▇. The equipment will be selected and procured in accordance with the specifications developed during the detailed engineering phase, copies of which shall be furnished to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The construction of the foundations, structures, wave traps, CCTV and cable runs into the control building to the termination cabinets will be completed by Clinton and ▇▇▇▇▇▇▇▇▇. The work at the Plattsburgh Substation will be installed under Transmission Owner’s CPP-1. Transmission Owner will provide Protection and Controls Engineering, install and terminate wiring from the termination cabinets to the control panels and relays, install relays and equipment in the existing panels, and will commission such work inside the 230kV control building. Transmission Owner will develop the communications protocols and data flow over the circuits.

  • Construction Completion The related Construction shall have been completed substantially in accordance with the related Plans and Specifications, the related Deed and all Applicable Laws, and such Leased Property shall be ready for occupancy and operation. All fixtures, equipment and other property contemplated under the Plans and Specifications to be incorporated into or installed in such Leased Property shall have been substantially incorporated or installed, free and clear of all Liens except for Permitted Liens.