Common use of Project Reports; Completion Report Clause in Contracts

Project Reports; Completion Report. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of indicators agreed with the World Bank. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the World Bank not later than one (1) month after the end of the period covered by such report. 2. The Recipient shall prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six (6) months after the Closing Date.

Appears in 6 contracts

Sources: Trust Fund Grant Agreement, Grant Agreement, Grant Agreement

Project Reports; Completion Report. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of the indicators agreed with the World Bank. Each Project Report shall cover the period of one six (16) calendar semestermonths, and shall be furnished to the World Bank not later than one forty five (145) month days after the end of the period covered by such report. 2. The Recipient shall prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six (6) months after the Closing Date.

Appears in 3 contracts

Sources: Trust Fund Grant Agreement, Trust Fund Grant Agreement, Trust Fund Grant Agreement

Project Reports; Completion Report. 1. The Recipient Recipient, through the PIU, shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 5.08 of the Standard General Conditions and on the basis of indicators agreed with the World Bank. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the World Bank not later than one forty-five (145) month days after the end of the period covered by such report. 2. The Recipient shall prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six three (63) months after the Closing Date.

Appears in 2 contracts

Sources: Grant Agreement, Grant Agreement

Project Reports; Completion Report. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of the indicators agreed with the World Bank. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the World Bank not later than forty five (45) days one (1) month after the end of the period covered by such report. 2. The Recipient shall prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six (6) months after the Closing Date. In order to assist the Recipient in preparing the Completion Report, the Recipient shall employ consultants in accordance with the provisions of Section III of this Schedule.

Appears in 2 contracts

Sources: Grant Agreement, Global Environment Facility Grant Agreement

Project Reports; Completion Report. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of the indicators agreed with the World Bank. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the World Bank not later than one (1) month after the end of the period covered by such report. 2. The Recipient shall prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six three (63) months after the Closing Date.

Appears in 2 contracts

Sources: Grant Agreement, Global Environment Facility Grant Agreement

Project Reports; Completion Report. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of indicators agreed with acceptable to the World Bank. Each Project Report shall cover the period of one (1) calendar semesterFiscal Year, and shall be furnished to the World Bank not later than one four (14) month months after the end of the period covered by such report. 2. The Recipient shall prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six (6) months after the Closing Date.

Appears in 2 contracts

Sources: Grant Agreement, Grant Agreement

Project Reports; Completion Report. 1. The Through the Project Implementing Entity the Recipient shall shall: (a) monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of the indicators agreed with the World Bank. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the World Bank not later than one forty five (145) month days after the end of the period covered by such report. 2. The Recipient shall ; and (b) prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished Conditions and furnish it to the World Bank not later than six (6) months after the Closing Date.

Appears in 2 contracts

Sources: Grant Agreement, Grant Agreement

Project Reports; Completion Report. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of the indicators agreed with the World Bank. Each Project Report shall cover the period of one (1) calendar semesterquarter, and shall be furnished to the World Bank not later than one (1) month after the end of the period covered by such report. 2. The Recipient shall prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six (6) months after the Closing Date.

Appears in 2 contracts

Sources: Grant Agreement, World Bank Iraq Trust Fund Grant Agreement

Project Reports; Completion Report. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of indicators agreed with acceptable to the World Bank. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the World Bank not later than one sixty (160) month days after the end of the period covered by such report. 2. The Recipient shall prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six (6) months after the Closing Date. In order to assist the Recipient in preparing the Completion Report, the Recipient shall employ consultants in accordance with the provisions of Section III of this Schedule.

Appears in 2 contracts

Sources: Trust Fund Grant Agreement, Global Environment Facility Trust Fund Grant Agreement

Project Reports; Completion Report. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of the indicators agreed with set forth in the World BankOperational Manual. Each Project Report shall cover the period of one (1) calendar semesterquarter, and shall be furnished to the World Bank not later than one (1) month forty five days after the end of the period covered by such report. 2. The Recipient shall prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six (6) months after the Closing Date.

Appears in 2 contracts

Sources: Grant Agreement, Grant Agreement

Project Reports; Completion Report. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of indicators agreed with the World Bank. Each Project Report shall cover the period of one (1) calendar semesterquarter, and shall be furnished to the World Bank not later than one forty five (145) month days after the end of the period covered by such report. 2. The Recipient shall prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six (6) months after the Closing Date.

Appears in 2 contracts

Sources: Grant Agreement, Grant Agreement

Project Reports; Completion Report. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of the indicators agreed with acceptable to the World Bank. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the World Bank not later than one (1) month after the end of the period covered by such report. 2. The Recipient shall prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six (6) three months after the Closing Date.

Appears in 2 contracts

Sources: Grant Agreement, Avian and Human Influenza Facility Grant Agreement

Project Reports; Completion Report. 1. The Recipient Borrower shall monitor and evaluate the progress of Part B of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of the indicators agreed with the World Bank. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the World Bank not later than one (1) month after the end of the period covered by such report. 2. The Recipient Borrower shall prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six (6) months after the Closing Date.

Appears in 2 contracts

Sources: Clean Technology Fund Loan Agreement, Loan Agreement

Project Reports; Completion Report. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of indicators agreed with the World Bank. Each Project Report shall cover the period of one (1) calendar semesterquarter, and shall be furnished to the World Bank not later than one (1) month after the end of the period covered by such report. 2. The Recipient shall prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six (6) months after the Closing Date.

Appears in 1 contract

Sources: Grant Agreement

Project Reports; Completion Report. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of indicators agreed with the World BankIndicators. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the World Bank not later than one (1) two month after the end of the period covered by such report. 2. The Recipient shall prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six (6) four months after the Closing Date.

Appears in 1 contract

Sources: Grant Agreement

Project Reports; Completion Report. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of indicators agreed with acceptable to the World Bank. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the World Bank not later than one sixty (160) month days after the end of the period covered by such report. 2. The Recipient shall prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six (6) months after the Closing Date.

Appears in 1 contract

Sources: Global Environment Facility Grant Agreement

Project Reports; Completion Report. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of indicators agreed with the World Bank. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the World Bank not later than one sixty (160) month days after the end of the period covered by such report. 2. The Recipient shall prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six (6) months after the Closing Date.

Appears in 1 contract

Sources: Trust Fund Grant Agreement

Project Reports; Completion Report. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of indicators agreed with the World Bank. Each Project Report shall cover the period of one (1) calendar semesterquarter, and shall be furnished to the World Bank not later than one (1) month after the end of the period covered by such report. 2. The Recipient shall prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six (6) months after the Closing Date.

Appears in 1 contract

Sources: Trust Fund Grant Agreement

Project Reports; Completion Report. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of the indicators agreed with the World Bank. Each Project Report shall cover the period of one (1) calendar semesterquarter, and shall be furnished to the World Bank not later than one (1) month after the end of the period covered by such report. 2. The Recipient shall prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six (6) months after the Closing Date.

Appears in 1 contract

Sources: Grant Agreement

Project Reports; Completion Report. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of indicators agreed with acceptable to the World Bank. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the World Bank not later than one (1) month after the end of the period covered by such report. 2. The Recipient shall prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six (6) months after the Closing Date.

Appears in 1 contract

Sources: Grant Agreement

Project Reports; Completion Report. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of indicators agreed with the World Bank. Each Project Report shall cover the period of one (1) calendar semesterFiscal Year trimester, and shall be furnished to the World Bank not later than one forty-five (145) month days after the end of the period covered by such report. 2. The Recipient shall prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six (6) months after the Closing Date.

Appears in 1 contract

Sources: Food Price Crisis Response Trust Fund Grant Agreement

Project Reports; Completion Report. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of indicators agreed with the World Bank. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the World Bank not later than one (1) month after the end of the period covered by such report. 2. The Recipient shall prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six (6) months after the Closing Date.

Appears in 1 contract

Sources: Grant Agreement

Project Reports; Completion Report. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis and of indicators agreed with acceptable to the World Bank. Each Project Report shall cover the period of one (1) calendar semestersix months, and shall be furnished to the World Bank not later than one (1) month after the end of the period covered by such report. 2. The Recipient shall prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six (6) months after the Closing Date.

Appears in 1 contract

Sources: Global Environment Facility Grant Agreement

Project Reports; Completion Report. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of indicators agreed with acceptable to the World Bank. Each Project Report shall cover the period of one (1) calendar semesterquarter, and shall be furnished to the World Bank not later than one (1) month after the end of the period covered by such report. 2. The Recipient shall prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six (6) months after the Closing Date.

Appears in 1 contract

Sources: Trust Fund Grant Agreement

Project Reports; Completion Report. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of indicators agreed with the World BankIndicators. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the World Bank not later than one (1) month after the end of the period covered by such report. 2. The Recipient shall prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six (6) months after the Closing Date.

Appears in 1 contract

Sources: Trust Fund Grant Agreement

Project Reports; Completion Report. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of the indicators agreed with the World Bank. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the World Bank not later than one forty-five (145) month days after the end of the period covered by such report. 2. The Recipient shall prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six (6) months after the Closing Date.

Appears in 1 contract

Sources: Grant Agreement

Project Reports; Completion Report. 1. The Recipient Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of indicators agreed with acceptable to the World Bank. Each Project Report shall cover the period of one (1) calendar semesterquarter, and shall be furnished to the World Bank not later than one forty-five (145) month days after the end of the period covered by such report. 2. The Recipient Borrower shall prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six (6) months after the Closing Date.

Appears in 1 contract

Sources: Loan Agreement

Project Reports; Completion Report. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of the indicators agreed with set forth in the World BankAnnex to this Schedule 2. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the World Bank not later than one forty-five (145) month days after the end of the period covered by such report. 2. The Recipient shall prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six (6) months after the Closing Date.

Appears in 1 contract

Sources: Grant Agreement

Project Reports; Completion Report. 1. The Recipient Borrower shall monitor and evaluate the progress of Part A of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of the indicators agreed with the World Bank. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the World Bank not later than one (1) month after the end of the period covered by such report. 2. The Recipient Borrower shall prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six (6) months after the Closing Date.

Appears in 1 contract

Sources: Clean Technology Fund Loan Agreement

Project Reports; Completion Report. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of indicators agreed with acceptable to the World Bank. Each Project Report shall cover the period of one six (16) calendar semester, months and shall be furnished to the World Bank not later than one (1) month after the end of the period covered by such report. 2. The Recipient shall prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six (6) months after the Closing Date.

Appears in 1 contract

Sources: Grant Agreement

Project Reports; Completion Report. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of indicators agreed with the World Bank. Each Project Report shall cover the period of one (1) calendar semesterquarter, and shall be furnished to the World Bank not later than one forty five (145) month days after the end of the period covered by such report. 2. The Recipient shall prepare the Completion Report in accordance with the provisions of Section 2.06 of the Standard Conditions. The Completion Report shall be furnished to the World Bank not later than six (6) months month after the Closing Date.

Appears in 1 contract

Sources: Grant Agreement