Project Reports. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of indicators agreed with the Bank. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty five (45) days after the end of the period covered by such report.
Appears in 8 contracts
Sources: Loan Agreement, Loan Agreement, Loan Agreement
Project Reports. The Borrower shall cause the Project Implementing Entity, to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with the Bank. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty five days (45) days after the end of the period covered by such report.
Appears in 8 contracts
Sources: Loan Agreement, Loan Agreement, Loan Agreement
Project Reports. 1. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of indicators agreed with the Bank. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty forty-five (45) days after the end of the period covered by such report.
2. For purposes of Section 5.08 (c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Bank not later than November 30, 2014.
Appears in 6 contracts
Sources: Loan Agreement, Loan Agreement, Loan Agreement
Project Reports. 1. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with set forth in the BankOperational Manual. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty five (45) 45 days after the end of the period covered by such report.
Appears in 5 contracts
Sources: Loan Agreement, Loan Agreement, Loan Agreement
Project Reports. 1. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with the Bank. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty five (45) days one month after the end of the period covered by such report.
Appears in 4 contracts
Sources: Loan Agreement, Loan Agreement, Loan Agreement
Project Reports. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators set forth in the Operational Manual and agreed with the Bank. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty forty-five (45) days after the end of the period covered by such report.
Appears in 4 contracts
Sources: Loan Agreement, Loan Agreement, Loan Agreement
Project Reports. 1. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of Project indicators agreed with set forth in the BankOperational Manual. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty five (45) days after the end of the period covered by such report.
Appears in 4 contracts
Sources: Loan Agreement, Loan Agreement, Loan Agreement
Project Reports. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with the Bank. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty five (45) days one month after the end of the period covered by such report.
Appears in 3 contracts
Sources: Loan Agreement, Loan Agreement, Loan Agreement
Project Reports. 1. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with (the BankPerformance Indicators) set forth below in the Operational Manual. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty forty-five (45) days after the end of the period covered by such report.
Appears in 3 contracts
Sources: Loan Agreement, Loan Agreement, Loan Agreement
Project Reports. 1. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of indicators agreed with the BankBank and set forth in the Project Operational Manual. Each Project Report shall cover the period of one calendar semesterFY Semester, and shall be furnished to the Bank not later than forty five (45) sixty days after the end of the period covered by such report.
Appears in 3 contracts
Sources: Loan Agreement, Loan Agreement, Loan Agreement
Project Reports. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of indicators agreed with the Bank. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the Bank not later than forty five one (451) days month after the end of the period covered by such report.
Appears in 3 contracts
Sources: Loan Agreement, Loan Agreement, Loan Agreement
Project Reports. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of indicators agreed with the Bank. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty five (45) days one month after the end of the period covered by such report.
Appears in 3 contracts
Sources: Loan Agreement, Loan Agreement, Loan Agreement
Project Reports. 1. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of indicators the Indicators agreed with the Bank. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty five (45) days two months after the end of the period covered by such report.
Appears in 3 contracts
Sources: Loan Agreement, Loan Agreement, Loan Agreement
Project Reports. 1. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of indicators agreed with the Bank. Each Project Report shall cover the period of one (1) calendar semesterquarter, and shall be furnished to the Bank not later than forty forty-five (45) days after the end of the period covered by such report.
Appears in 3 contracts
Sources: Loan Agreement, Loan Agreement, Loan Agreement
Project Reports. 1. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with set forth in Annex B to the BankSchedule of the Project Agreement. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty forty-five (45) days after the end of the period covered by such report.
Appears in 2 contracts
Sources: Loan Agreement, Loan Agreement
Project Reports. 1. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with the Bank. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty five (45) days after the end of the period covered by such report.
2. For purposes of Section 5.08 (c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Bank not later than six (6) months.
Appears in 2 contracts
Sources: Loan Agreement, Loan Agreement
Project Reports. 1. The Borrower shall cause the Project Implementing Entity to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of indicators agreed with acceptable to the Bank. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty five (45) days one month after the end of the period covered by such report.
Appears in 2 contracts
Sources: Loan Agreement, Loan Agreement
Project Reports. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of indicators agreed with the Bank. Each Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Bank not later than forty five (45) days one month after the end of the period covered by such report.
Appears in 2 contracts
Sources: Loan Agreement, Loan Agreement
Project Reports. The Borrower shall cause the Project Implementing Entity to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with acceptable to the Bank. Each Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Bank not later than forty five (45) days after the end of the period covered by such report.
Appears in 2 contracts
Sources: Loan Agreement, Loan Agreement
Project Reports. 1. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of indicators agreed with the BankMonitoring and Evaluation Indicators. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty five two (452) days months after the end of the period covered by such report.
2. For purposes of Section 5.08 (c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Bank not later than February 28, 2014.
Appears in 2 contracts
Sources: Loan Agreement, Loan Agreement
Project Reports. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of indicators agreed with acceptable to the BankBank and set forth in the Operational Manual. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty five (45) days one month after the end of the period covered by such report.
Appears in 2 contracts
Sources: Loan Agreement, Loan Agreement
Project Reports. The Borrower shall cause the Project Implementing Entity to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with the Bank. Each Project Report shall cover the period of one calendar semestertrimester, and shall be furnished to the Bank not later than forty five (45) days one month after the end of the period covered by such report.
Appears in 2 contracts
Sources: Loan Agreement, Loan Agreement
Project Reports. 1. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with set forth in the BankOperational Manual. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty five (45) one 45 days after the end of the period covered by such report.
Appears in 2 contracts
Sources: Loan Agreement, Loan Agreement
Project Reports. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with the Bank. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty five (45) days after the end of the period covered by such report.
Appears in 2 contracts
Sources: Loan Agreement, Loan Agreement
Project Reports. The Borrower shall cause PEPS to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of indicators agreed with the Bank. Each Project Report shall cover the period of one (1) calendar semesterquarter, and shall be furnished to the Bank not later than forty five (45) days after the end of the period covered by such report.
Appears in 2 contracts
Sources: Loan Agreement, Loan Agreement
Project Reports. 1. The Borrower shall monitor and evaluate the progress of the Project and and, through PTSMI, prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of indicators agreed with the Bank. Each Project Report shall cover the period of one one(1) calendar semesterquarter, and shall be furnished to the Bank not later than forty forty-five (45) days after the end of the period covered by such report.
Appears in 2 contracts
Sources: Loan Agreement, Loan Agreement
Project Reports. The Borrower shall shall, through RDMRDI, monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with the Bank. Each Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Bank not later than forty five (45) days one month after the end of the period covered by such report.
Appears in 2 contracts
Sources: Loan Agreement, Loan Agreement
Project Reports. The Borrower Borrower, through SENER, shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the performance indicators agreed with included in the BankOperational Manual. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty five sixty (4560) days after the end of the period covered by such report.
Appears in 2 contracts
Sources: Loan Agreement, Loan Agreement
Project Reports. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with the Bank. Each Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Bank not later than forty forty-five (45) days after the end of the period covered by such report.
Appears in 2 contracts
Sources: Loan Agreement, Loan Agreement
Project Reports. 1. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of indicators agreed with the Bank. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty five (45) days one month after the end of the period covered by such report.
2. For purposes of Section 5.08 (c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Bank not later than March 30, 2014.
Appears in 2 contracts
Sources: Loan Agreement, Loan Agreement
Project Reports. 1. The Borrower shall cause the Project Implementing Entity to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with the Bankset forth below in Annex 1 to this Schedule 2. Each Project Report shall cover the period of one one(1) calendar semesterquarter, and shall be furnished to the Bank not later than forty forty-five (45) days after the end of the period covered by such report.
Appears in 2 contracts
Sources: Loan Agreement, Loan Agreement
Project Reports. The Borrower shall monitor and evaluate the progress of the Project Project, including the status of the implementation of the EMPs, and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with the Bank. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty five (45) days after the end of the period covered by such report.
Appears in 2 contracts
Sources: Loan Agreement, Loan Agreement
Project Reports. The Borrower shall monitor and evaluate, and cause the Project Implementing Entity to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with set forth in Annex B of the BankSchedule to the Project Agreement. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the Bank not later than forty five (45) days after the end of the period covered by such reportMarch 1 and September 1 in each year, starting on September 1, 2011.
Appears in 2 contracts
Sources: Loan Agreement, Loan Agreement
Project Reports. 1. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of indicators agreed with the BankPerformance Indicators. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty five (45) days one month after the end of the period covered by such report.
2. For purposes of Section 5.08 (c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Bank not later than January 31, 2013.
Appears in 2 contracts
Sources: Loan Agreement, Loan Agreement
Project Reports. 1. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with set forth in the BankAttachment to this Schedule 2. Each Project Report shall cover the period of one (1) calendar semesterquarter, and shall be furnished to the Bank not later than forty forty-five (45) days after the end of the period covered by such report.
Appears in 2 contracts
Sources: Loan Agreement, Loan Agreement
Project Reports. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of indicators agreed with acceptable to the Bank. Each Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Bank not later than forty five (45) days one month after the end of the period covered by such report.
Appears in 2 contracts
Sources: Loan Agreement, Loan Agreement
Project Reports. The 1. Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of indicators agreed with acceptable to the Bank. Each Project Report shall cover the period of one (1) calendar semesterquarter, and shall be furnished to the Bank not later than forty forty-five (45) days after the end of the period covered by such report.
Appears in 2 contracts
Sources: Loan Agreement, Loan Agreement
Project Reports. 1. The Borrower shall monitor and evaluate evaluate, or cause to be monitored and evaluated, the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of indicators agreed with acceptable to the Bank. Each Project Report shall cover the period of one calendar semesteryear, and shall be furnished to the Bank not later than forty five two (452) days months after the end of the period covered by such report.
Appears in 2 contracts
Sources: Loan Agreement, Loan Agreement
Project Reports. 1. The Borrower shall ensure that the Project Implementing Entity monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with set forth in Annex B to Schedule to the BankProject Agreement. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the Bank not later than forty five two (452) days months after the end of the period covered by such report.
Appears in 2 contracts
Sources: Loan Agreement, Loan Agreement
Project Reports. 1. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with acceptable to the Bank. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty five (45) days one month after the end of the period covered by such report.
2. For purposes of Section 5.08 (c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Bank not later than June 30, 2015.
Appears in 2 contracts
Sources: Loan Agreement, Loan Agreement
Project Reports. 1. The Borrower shall monitor and evaluate or shall cause the Project Implementing Entity to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with set forth in the BankAnnex to Schedule 1 to the Project Agreement. Each Project Report shall cover the a six (6) month calendar period of one calendar semesterin each year that is from January through June and from July through December, commencing on July 1, 2007, and shall be furnished to the Bank not later than forty forty-five (45) days after the end of the period covered by such report.
Appears in 2 contracts
Sources: Loan Agreement, Loan Agreement
Project Reports. 1. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with the Bank. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty five (45) days one month after the end of the period covered by such report.
2. For purposes of Section 5.08 (c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Bank not later than September 30, 2016.
Appears in 2 contracts
Sources: Loan Agreement, Loan Agreement
Project Reports. 1. The Borrower shall monitor and evaluate the progress of the Project and, through its Ministry of Environment and Forests, prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with the Bank. Each Project Report shall cover the period of one calendar semestersix (6) months in each Fiscal Year, and shall be furnished to the Bank not later than forty five one (451) days month after the end of the period covered by such report.
Appears in 2 contracts
Sources: Loan Agreement, Loan Agreement
Project Reports. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators set forth in the Operational Manual and agreed with the Bank. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty five (45) days one month after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. 1. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with the BankBank and set forth in the Project Operations Manual. Each Project Report shall cover the period of one calendar semesterfour months, and shall be furnished to the Bank not later than forty five (45) days one month after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. 1. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with the Bankset forth in Annex 1 to this Schedule. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the Bank not later than forty five three (453) days months after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. 1. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with set forth in the BankOperational Manual. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty five (45) days one month after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of indicators agreed with the BankMonitoring and Evaluation Indicators. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the Bank not later than forty five one (451) days month after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. 1. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of Project indicators agreed with set forth in the BankOperational Manual. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty five (45) 45 days after the end of the period covered by such reportfirst calendar semester of each year (starting with the first calendar semester of the year 2008) and 60 days after the end of the second calendar semester of each year.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. 1. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of indicators agreed with the Bank. Each Project Report shall cover the period of one calendar semestersemester (period ending on June 30 and on December 31), and shall be furnished to the Bank not later than forty five one (451) days month after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. The Borrower Borrower, together with the Project Implementing Entity, shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of indicators agreed with the Bank. Each Project Report such report shall cover the period of one calendar semestereach Fiscal Year quarter, and shall be furnished to the Bank not later than forty forty-five (45) days after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. 1. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with set forth in the BankAnnex to the Schedule to the Project Agreement. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty five (45) days after the end of the period covered by such report.forty-five
Appears in 1 contract
Sources: Loan Agreement
Project Reports. 1. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with acceptable to the Bank. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty five (45) days one month after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with acceptable to the Bank. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty five (45) thirty days after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. 1. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the performance indicators agreed with the Bank. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty five (45) days one month after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. 1. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with set forth in Annex of the BankSchedule to the Project Agreement. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the Bank not later than forty five (45) days after the end of the period covered by such report.forty-five
Appears in 1 contract
Sources: Loan Agreement
Project Reports. 1. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with (the BankPerformance Indicators) set forth below in the Operational Manual. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty five (45) days after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. The Borrower shall ensure that the Project Implementing Entity monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with the Bankset forth in a supplemental letter of same date of this Agreement. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty five (45) days one and a half months after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. 1. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of indicators agreed with the BankMonitoring and Evaluation Indicators. Each Project Report shall cover the period of one calendar semester(1) year, and shall be furnished to the Bank each year not later than March 31.
2. For purposes of Section 5.08 (c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Bank not later than forty five six (456) days months after the end of the period covered by such reportClosing Date.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. 1. The Borrower shall, or shall cause the Project Implementing Entity, monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators set forth in the Operational Manual and agreed with the Bank. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty five (45) days after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. 1. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of indicators agreed with the BankKey Performance Indicators. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty five (45) days one month after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with the Bank. Each Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Bank not later than forty forty-five (45) days after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. 1. The Borrower shall monitor ensure that the Project Implementing Entity monitors and evaluate evaluates the progress of the Project and prepare prepares Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of indicators agreed with acceptable to the Bank. Each Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Bank not later than forty forty-five (45) days after the end of the period covered by each such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. 1. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with set forth in the BankOperational Manual. Each Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Bank not later than forty forty-five (45) days after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. The Borrower shall shall, through RD, monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with the Bank. Each Project Report shall cover the period of one calendar semester, shall include the reporting on the status of the implementation of the RAP and shall be furnished to the Bank not later than forty five (45) days one month after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. 1. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of indicators agreed with the Bank. Each Project Report shall cover the period of one calendar semesteryear, and shall be furnished to the Bank not later than forty five (45) days two months after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. 1. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with acceptable to the Bank. Each Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Bank not later than forty five (45) days one month after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. 1. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with set forth in Annex 1 to the BankSchedule to the Project Agreement. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the Bank not later than forty five sixty (4560) days after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with the Bank. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the Bank not later than forty forty-five (45) days after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of indicators agreed with the Bank. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty forty-five (45) days after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with set forth in Annex 1 to the BankSchedule to the Project Agreement. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the Bank not later than forty five sixty (4560) days after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. The Borrower Borrower, together with the Project Implementing Entity, shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of indicators agreed with the Bank. Each Project Report such report shall cover the period of one calendar semestereach Fiscal Year quarter, and shall be furnished to the Bank not later than forty five (45) days after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. The Borrower shall cause the Project Implementing Entity to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with the Bank. Each Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Bank not later than forty five (45) days after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. 1. The Borrower shall monitor and evaluate, and cause the Project Implementing Entity to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with set forth in Annex B to the BankSchedule to the Project Agreement. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the Bank not later than forty seventy-five (4575) days after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. 1. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with set forth in the BankOperational Manual. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty forty-five (45) days after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. The Borrower shall monitor and evaluate the progress under Part A of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with the Bank. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty five (45) days one month after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. 1. The Borrower shall monitor and evaluate, and shall cause the Project Implementing Entity to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with set forth in Annex B of the BankSchedule to the Project Agreement. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the Bank not later than forty five (45) days after the end of the period covered by such reportFebruary 28 and August 31 in each year, starting on August 31, 2008.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. The Borrower shall and shall cause the Project Implementing Entity to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with the Bank. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty five (45) days after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. The Borrower Borrower, through the Project Implementing Entity, shall monitor and evaluate the progress of the Project and prepare cause the Project Reports to be prepared in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of indicators agreed with the Bank. Each Project Report shall cover the period of one calendar semester(1) Financial Year quarter, and shall be furnished to the Bank not later than forty forty-five (45) days after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. 1. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of indicators agreed acceptable to the Bank, and including specific environmental reports and land acquisition reports providing results of the monitoring programs undertaken in accordance with the BankFEAP and the LAFP, as the case may be. Each Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Bank not later than forty forty-five (45) days after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with set forth in Annex 1 to the BankSchedule to the Project Agreement. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the Bank not later than forty forty-five (45) days after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. 1. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with set forth in the BankOperational Manual. Each Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Bank not later than forty five (45) days after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. 1. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with set forth in the BankOperational Manual. Each Project Report shall cover the period of one calendar semestersemester (starting with the calendar semester in which the Effective Date falls), and shall be furnished to the Bank not later than forty five (45) 45 days after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of indicators agreed with the Bank. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty five (45) days after the end of the period covered by such report. For purposes of Section 5.08 (c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Bank not later than November 30, 2012.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with set forth in the BankOperational Manual. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty five (45) days two months after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. The Borrower shall monitor and evaluate the progress under Part B of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with the Bank. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty five (45) days one month after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. 1. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with set forth in Annex 1 of the BankSchedule to the Project Agreement. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the Bank not later than forty five (45) days after the end of the period covered by such report.forty-five
Appears in 1 contract
Sources: Loan Agreement
Project Reports. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of indicators agreed with the Bank. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty five (45) days after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with the BankBank (“Indicators”). Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty five (45) days two months after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of indicators agreed with the Bankset forth in Schedule 4 to this Agreement. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the Bank not later than forty five sixty (4560) days after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with acceptable to the Bank. Each Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Bank not later than forty five (45) days after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators included in the Operational Manual and agreed with the Bank. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty five (45) days one month after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with set forth in the BankOperational Manual. Each Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Bank not later than forty five (45) 45 days after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with the Bank. Each Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Bank not later than forty five (45) days one month after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. The Borrower shall cause the Project Implementing Entity to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of indicators agreed with the Bank. Each Project Report shall cover the period of one (1) calendar semesterquarter, and shall be furnished to the Bank not later than forty forty-five (45) days after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. 1. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators set forth in the Operational Manual and agreed with the Bank. Each Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Bank not later than forty five (45) 45 days after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. 1. The Borrower shall Borrower, shall, through MIDEPLAN, monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with set forth in the BankOperational Manual. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty forty-five (45) days after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. 1. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with the BankBank and included in the Operations Manual. Each Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Bank not later than forty five (45) days after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. The Borrower shall cause the Project Implementing Entity to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of indicators agreed with the Bank. Each Project Report shall cover the period of one (1) calendar semesterquarter, and shall be furnished to the Bank not later than forty forty- five (45) days after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement