Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and the Original Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth in the Project Implementation Manual. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Association not later than 45 days after the end of the period covered by such report. 2. For purposes of Section 4.08 (c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than six months after the Closing Date.
Appears in 2 contracts
Sources: Financing Agreement, Financing Agreement
Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and the Original Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the revised indicators as set forth in the Project Implementation amended Operational Manual. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Association not later than 45 days after the end of the period covered by such report.
2. For purposes of Section 4.08 (c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than six months after the Closing Dateclosing date.
Appears in 2 contracts
Sources: Financing Agreement, Financing Agreement
Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and the Original Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators agreed with the indicators set forth in the Project Implementation ManualAssociation. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Association not later than 45 forty five (45) days after the end of the period covered by such report.
2. For purposes of Section 4.08 (c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than six (6) months after prior to the Closing Date.
Appears in 2 contracts
Sources: Financing Agreement, Financing Agreement
Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and the Original Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators satisfactory to the Association set forth in the Project Implementation Manual. Each Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Association not later than 45 days after the end of the period covered by such report.
2. For purposes of Section 4.08 (c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than six months after the Closing Date.
Appears in 2 contracts
Sources: Financing Agreement, Financing Agreement
Project Reports. 1. The Recipient shall shall, together with the Project Implementing Entity, monitor and evaluate the progress of the Project and the Original Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators agreed with the indicators set forth in the Project Implementation ManualAssociation. Each Project Report shall cover the period of one (1) calendar semesterquarter, and shall be furnished to the Association not later than 45 forty-five (45) days after the end of the period covered by such report.
2. For purposes of Section 4.08 (c4.08(c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than six (6) months after the Closing Date.
Appears in 2 contracts
Sources: Financing Agreement, Financing Agreement
Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and the Original Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators satisfactory to the Association set forth in the Project Implementation ManualManual of Procedures. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Association not later than 45 days after the end of the period covered by such report.
2. For purposes of Section 4.08 (c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than six months after the Closing Date.
Appears in 2 contracts
Sources: Financing Agreement, Financing Agreement
Project Reports. 1. The Recipient Recipient, through the MPE, shall monitor and evaluate the progress of the Project and the Original Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth in agreed with the Project Implementation ManualAssociation. Each Project Report shall cover the period of one calendar semestersemester (six months), and shall be furnished to the Association not later than 45 forty five (45) days after the end of the period covered by such report.
2. For purposes of Section 4.08 (c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than six (6) months after prior to the Closing Date.
Appears in 2 contracts
Sources: Financing Agreement, Financing Agreement
Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and the Original Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth in the Project Implementation ManualAttachment 1 to this Schedule 2. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Association not later than 45 forty-five (45) days after the end of the period covered by such report.
2. For purposes of Section 4.08 (c4.08(c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than six (6) months after the Closing Date.
Appears in 2 contracts
Sources: Financing Agreement, Financing Agreement
Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and the Original Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators acceptable to the Association set forth in the Project Implementation Operational Manual. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Association not later than 45 days one month after the end of the period covered by such report.
2. For purposes of Section 4.08 (c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than six months after the Closing Date.
Appears in 2 contracts
Sources: Financing Agreement, Financing Agreement
Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and the Original Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth in acceptable to the Project Implementation ManualAssociation. Each Project Report shall cover the period of one (1) calendar semesteryear, and shall be furnished to the Association not later than 45 forty-five (45) days after the end of the period covered by such report.
2. For purposes of Section 4.08 (c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than six (6) months after the Closing Date.
Appears in 2 contracts
Sources: Financing Agreement, Financing Agreement
Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and the Original Project and shall cause TANESCO to prepare Project Reports for the Project, all in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth in the Project Implementation ManualOperating Guidelines. Each Project Report shall cover the period of one calendar semestersix months, and shall be furnished to the Association not later than 45 forty-five (45) days after the end of the period covered by such reportperiod.
2. For purposes the purpose of Section 4.08 (c4.08(c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than six 6 months after the Closing Date.
Appears in 2 contracts
Sources: Financing Agreement, Financing Agreement
Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and the Original Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth in the Project Implementation Operations Manual. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Association not later than 45 forty five days after the end of the period covered by such report.
2. For purposes of Section 4.08 (c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than six months after the Closing Date.
Appears in 2 contracts
Sources: Financing Agreement, Financing Agreement
Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and the Original Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth in agreed with the Project Implementation ManualAssociation. Each Project Report shall cover the period of one (1) calendar semesterquarter, and shall be furnished to the Association not later than 45 forty-five (45) days after the end of the period covered by such report.
2. For purposes of Section 4.08 (c4.08(c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than six (6) months after the Closing Dateclosing date.
Appears in 2 contracts
Sources: Financing Agreement, Financing Agreement
Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and the Original Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth in agreed with the Project Implementation ManualAssociation. Each Project Report shall cover the period of one (1) calendar semesterquarter, and shall be furnished to the Association not later than 45 forty-five (45) days after the end of the period covered by such report.
2. For purposes of Section 4.08 (c4.08(c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than six (6) months after the Closing Date.
Appears in 1 contract
Sources: Financing Agreement
Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and the Original Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth in the Project Implementation ManualAppendix to this Schedule 2. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the Association not later than 45 days one (1) month after the end of the period covered by such report.
2. For purposes of Section 4.08 (c4.08(c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than six (6) months after the Closing Date.
Appears in 1 contract
Sources: Financing Agreement
Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and the Original Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth in the Project Implementation Operational Manual. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Association not later than 45 forty five days after the end of the period covered by such report.
2. For purposes of Section 4.08 (c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than six months after the Closing Date.
Appears in 1 contract
Sources: Financing Agreement
Project Reports. 1. The Recipient shall shall, together with MPAO, monitor and evaluate the progress of the Project and the Original Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators acceptable to the indicators set forth in the Project Implementation ManualAssociation. Each Project Report shall cover the a bi-annual period of one calendar semester(six months), and shall be furnished to the Association not later than 45 forty five (45) calendar days after the end of the period covered by such report.
2. For purposes of Section 4.08 (c4.08(c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than six (6) months after the Closing Date.
Appears in 1 contract
Sources: Financing Agreement
Project Reports. 1. The Recipient Recipient, through MoTC, shall monitor and evaluate the progress of the Project and the Original Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth in agreed with the Project Implementation ManualAssociation. Each Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Association not later than 45 forty five (45) days after the end of the period covered by such report.
2. For purposes of Section 4.08 (c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than six four (4) months after before the Closing Date.
Appears in 1 contract
Sources: Financing Agreement
Project Reports. 1. The Recipient shall cause the ARS to monitor and evaluate the progress of the Project and the Original Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth in agreed with the Project Implementation ManualAssociation. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Association not later than 45 forty five (45) days after the end of the period covered by such report.
2. For purposes of Section 4.08 (c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than six (6) months after the Closing Date.
Appears in 1 contract
Sources: Financing Agreement
Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and the Original Project and prepare Project Reports in accordance with the provisions of Section 4.08 4.08(b) of the General Conditions and on the basis of indicators agreed with the indicators set forth in the Project Implementation ManualAssociation. Each Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Association not later than 45 forty-five (45) days after the end of the period covered by such report.
2. For purposes of Section 4.08 (c4.08(c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than six (6) months after the Closing Date.
Appears in 1 contract
Sources: Financing Agreement
Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and the Original Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators acceptable to the indicators set forth in the Project Implementation ManualAssociation. Each Project Report shall cover the period of one (1) calendar semesterquarter, and shall be furnished to the Association not later than 45 forty-five (45) days after the end of the period covered by such report.
2. For purposes of Section 4.08 (c4.08(c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than six (6) months after prior to the Closing Date.
Appears in 1 contract
Sources: Grant Agreement
Project Reports. 1. The Recipient shall and shall cause the Project Implementing Entity to monitor and evaluate the progress of the Project and the Original Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators agreed with the indicators set forth in the Project Implementation ManualAssociation. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Association not later than 45 forty five (45) days after the end of the period covered by such report.
2. For purposes of Section 4.08 (c4.08(c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than six (6) months after the Closing Date.
Appears in 1 contract
Sources: Financing Agreement
Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and the Original Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth in agreed with the Project Implementation ManualAssociation. Each Project Report shall cover the a period of one two calendar semesterquarters in line with semi-annual supervision missions conducted by the Association, and shall be furnished to the Association not later than 45 days one month after the end of the period covered by such report.
2. For purposes of Section 4.08 (c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than six (6) months after the Closing Date.
Appears in 1 contract
Sources: Financing Agreement
Project Reports. 1. The Recipient shall or shall cause the Project Implementing Entity to monitor and evaluate the progress of the Project and the Original Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators agreed with the indicators set forth in the Project Implementation ManualAssociation. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Association not later than 45 days one (1) month after the end of the period covered by such report.
2. For purposes of Section 4.08 (c4.08(c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than six months after the Closing Date.
Appears in 1 contract
Sources: Financing Agreement
Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and the Original Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators agreed with the indicators Association and set forth in the Project Implementation ManualOM. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Association not later than 45 days one month after the end of the period covered by such report.
2. For purposes of Section 4.08 (c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than six (6) months after the Closing Date.
Appears in 1 contract
Sources: Financing Agreement
Project Reports. 1. The Recipient shall, and shall cause MAI to, monitor and evaluate the progress of the Project and the Original Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators agreed with the indicators set forth in the Project Implementation ManualAssociation. Each Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Association not later than 45 forty five (45) days after the end of the period covered by such report.
2. For purposes of Section 4.08 (c4.08(c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than six (6) months after the Closing Date.
Appears in 1 contract
Sources: Financing Agreement
Project Reports. 1. The Recipient shall cause the Project Implementing Entity to monitor and evaluate the progress of the Project and the Original Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth in agreed with the Project Implementation ManualAssociation. Each Project Report shall cover the period of one (1) calendar semesterquarter, and shall be furnished to the Association not later than 45 forty-five (45) days after the end of the period covered by such report.
2. For purposes of Section 4.08 (c4.08(c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than six (6) months after the Closing Date.
Appears in 1 contract
Sources: Financing Agreement
Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and the Original Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators acceptable to the Association and set forth in the Project Implementation ManualManuals. Each Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Association not later than 45 days after the end of the period covered by such report.
2. For purposes of Section 4.08 (c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than six months after the Closing Date.
Appears in 1 contract
Sources: Financing Agreement
Project Reports. 1. The Recipient Recipient, through the PMUs, shall monitor and evaluate the progress of the Project and the Original Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators agreed with the indicators set forth in the Project Implementation ManualAssociation. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the Association not later than 45 days one (1) month after the end of the period covered by such report.
2. For purposes of Section 4.08 (c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than six (6) months after the Closing Date.
Appears in 1 contract
Sources: Financing Agreement
Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and the Original Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth in agreed with the Project Implementation ManualAssociation. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the Association not later than 45 forty-five (45) days after the end of the period covered by such report, commencing August 15, 2010.
2. For purposes of Section 4.08 (c4.08(c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than six (6) months after the Closing Dateclosing date.
Appears in 1 contract
Sources: Financing Agreement