Project Understanding. Wilco has expressed concerns over the existing chilled water system operation and has requested ▇▇▇▇▇▇▇ ▇▇▇▇▇ Engineering, LLC (RSE) to perform an evaluation of the system. The goal of this evaluation is to review design flows and balancing requirements to determine if current conditions are suitable/acceptable. In addition, RSE shall provide recommendations to remediate any existing mechanical issues found as well as to optimize system efficiency. This is for the three air cooled chillers located on the roof of the North side of the Williamson County Jail. The secondary pumps are located below on the fourth floor. No evaluation will be performed on the two air cooled chillers, installed at grade along Rock Street, as there was no indication of issues with that system.
Appears in 2 contracts
Sources: Professional Services, Professional Services