Properties of Synchronization Signals Sample Clauses

Properties of Synchronization Signals. The first step of accessing the LTE network is Cell Search [3GPP15-36300]. This procedure defines the time and frequency synchronization of a UE to a target LTE cell. To this end, the UE must detect the primary and secondary synchronization signals – abbreviated as PSS and SSS respectively. Specifically, PSS and SSS are transmitted together twice in a 10ms radio frame (every 5ms) occupying 6 resource blocks (i.e. 6x12=72 subcarriers). From a system access perspective, these signals encode together the Physical Cell ID (PCI) so the UE is said to be synchronizing with a cell. In addition to their logical meaning, another important aspect related to coverage detection is the way these signals are transmitted. In one alternative, these sequences are beamformed for the higher frequency regime (e.g., mmWave) In that case the UE should synchronize with a beam (an additional dimension: space, on top of time and frequency). In another alternative, these sequences are transmitted in an omnidirectional manner to minimize the overhead of beamforming. In the second case beamforming is only used in the step the UE receives a Random Access Request, where it is certain that there are users trying to access the network.

Related to Properties of Synchronization Signals

  • Infrastructure Vulnerability Scanning Supplier will scan its internal environments (e.g., servers, network devices, etc.) related to Deliverables monthly and external environments related to Deliverables weekly. Supplier will have a defined process to address any findings but will ensure that any high-risk vulnerabilities are addressed within 30 days.

  • Synchronization The Licensor hereby grants limited synchronization rights for One (1) music video streamed online (Youtube, Vimeo, etc..) for up to 500,000 non-monetized video streams on all total sites. A separate synchronisation license will need to be purchased for distribution of video to Television, Film or Video game.

  • Start-Up and Synchronization Consistent with the mutually acceptable procedures of the Developer and Connecting Transmission Owner, the Developer is responsible for the proper synchronization of the Large Generating Facility to the New York State Transmission System in accordance with NYISO and Connecting Transmission Owner procedures and requirements.

  • Availability of Verizon Telecommunications Services 3.1 Verizon will provide a Verizon Telecommunications Service to PNG for resale pursuant to this Attachment where and to the same extent, but only where and to the same extent that such Verizon Telecommunications Service is provided to Verizon’s Customers. 3.2 Except as otherwise required by Applicable Law, subject to Section 3.1 of this Attachment, Verizon shall have the right to add, modify, grandfather, discontinue or withdraw Verizon Telecommunications Services at any time, without the consent of PNG. 3.3 To the extent required by Applicable Law, the Verizon Telecommunications Services to be provided to PNG for resale pursuant to this Attachment will include a Verizon Telecommunications Service customer-specific contract service arrangement (“CSA”) (such as a customer specific pricing arrangement or individual case based pricing arrangement) that Verizon is providing to a Verizon Customer at the time the CSA is requested by PNG.

  • Synchronization, Commissioning and Commercial Operation 5.1.1 The SPG shall give PGVCL at least thirty (30) days’ advanced preliminary written notice and at least fifteen (15) days’ advanced final written notice, of the date on which it intends to synchronize the Solar Power Project to the Grid System. 5.1.2 Subject to Article 5.1.1, the Power Project may be synchronized by the SPG to the Grid System when it meets all the connection conditions prescribed in applicable Grid Code then in effect and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 5.1.3 The synchronization equipment and all necessary arrangements / equipment including RTU for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the SPG at its generation facility of the Power Project at its own cost. The SPG shall synchronize its system with the Grid System only after the approval of synchronization scheme is granted by the head of the concerned substation/ and checking/verification is made by the concerned authorities of the PGVCL. 5.1.4 The SPG shall immediately after each synchronization/tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. In addition, the SPG will inject in-firm power to grid from time to time to carry out operational/ functional test prior to commercial operation. For avoidance of doubt, it is clarified that Synchronization / Connectivity of the Project with the grid shall not to be considered as Commissioning of the Project. 5.1.5 The SPG shall commission the Project within nine (9) Months from the Date of execution of this PPA. Declaration of COD shall be certified by the commissioning committee. 5.1.6 The Parties agree that for the purpose of commencement of the supply of electricity by SPG to PGVCL, liquidated damages for delay etc., the Scheduled Commissioning Date as defined in this Agreement shall be the relevant date.