Common use of Proposed Conditions Clause in Contracts

Proposed Conditions. The proposed improvements include constructing a right turn lane on the northwest corner of the intersection of Pin Oak Road and Katy-▇▇▇▇▇▇▇▇▇ Road within the proposed ROW. Includes right-turn lane, signal pole relocation, ramp/crosswalk adjustment and inlet relocation, and right-of-way map preparation (one parcel from Pin Oak Homeowners Association). ▇▇▇▇▇▇ and ▇▇▇▇▇▇▇ Engineering, (VSE) has been engaged to provide professional engineering services to manage the project through design, bid, and construction phases. The scope also includes survey, traffic signal, subsurface utility engineering (▇▇▇), and utility coordination support services. The design phase will include the development of bid-ready plans, project manual, and specifications, including quantity take-off and estimated construction cost, identification of utility conflicts in plan view, tabulated utility conflict list with the recommended resolution, and bidding sheet. The design phase deliverables will consist of bid-ready construction plans and contract documents per the Fort Bend County (COUNTY) Mobility Bond Design Manual. The bid phase will include attending the pre-bid meeting, preparation of necessary addenda to address issues or clarifications and VSE will revise the construction plans as needed to reflect the addenda issued during the bid period and submit final construction plans to COUNTY. The construction phase will include attending the pre-construction meeting, reviewing submittals, RFI’s, substantial completion walkthrough, and preparing record drawings. The anticipated project schedule to complete the study and design phase is included as Exhibit B. The design phase, bid phase and construction phase will be performed per the current County Mobility Bond Design Manual. VSE proposes the basic services shown below:

Appears in 1 contract

Sources: Professional Services

Proposed Conditions. The proposed improvements include constructing a right turn lane on the northwest corner of the intersection of Pin Oak Road and Katy-▇▇▇▇▇▇▇▇▇ Road within the proposed ROW. Includes right-turn lane, signal pole relocation, ramp/crosswalk adjustment and inlet relocation, and right-of-way map preparation (one parcel from Pin Oak Homeowners Association). Basic Services ▇▇▇▇▇▇ and ▇▇▇▇▇▇▇ Engineering, (VSE) has been engaged to provide professional engineering services to manage the project through design, bid, and construction phases. The scope also includes survey, traffic signal, subsurface utility engineering (▇▇▇SUE), and utility coordination support services. The design phase will include the development of bid-ready plans, project manual, and specifications, including quantity take-off and estimated construction cost, identification of utility conflicts in plan view, tabulated utility conflict list with the recommended resolution, and bidding sheet. The design phase deliverables will consist of bid-ready construction plans and contract documents per the Fort Bend County (COUNTY) Mobility Bond Design Manual. The bid phase will include attending the pre-bid meeting, preparation of necessary addenda to address issues or clarifications and VSE will revise the construction plans as needed to reflect the addenda issued during the bid period and submit final construction plans to COUNTY. The construction phase will include attending the pre-construction meeting, reviewing submittals, RFI’s, substantial completion walkthrough, and preparing record drawings. The anticipated project schedule to complete the study and design phase is included as Exhibit B. The design phase, bid phase and construction phase will be performed per the current County Mobility Bond Design Manual. VSE proposes the basic services shown below:

Appears in 1 contract

Sources: Professional Services