Protection of Property. In construction and reconstruction of Specified Roads, Contractor shall not unnecessarily remove, deface, injure, or destroy trees, shrubs, or other natural features, unless specifically au- thorized. To the extent practicable, Contractor shall confine operations to within the clearing limit or other areas des- ignated in the contract and prevent the depositing of rocks, excavated materials, stumps, or other debris outside these limits.
Appears in 29 contracts
Sources: Integrated Resource Contract, Integrated Resource Contract, Integrated Resource Contract
Protection of Property. In construction and reconstruction of Specified Roads, Contractor shall not unnecessarily remove, deface, injure, or destroy trees, shrubs, or other natural features, unless specifically au- thorized. To the extent practicable, Contractor shall confine operations to within the clearing limit or other areas des- ignated in the contract and prevent the depositing of rocks, excavated materials, stumps, or other debris outside these limits.these
Appears in 4 contracts
Sources: Integrated Resource Contract, Integrated Resource Timber Contract, Integrated Resource Contract