Provided by the Employer Clause Samples

Provided by the Employer. The Employer will provide in the way of water, waste disposal, ablutions, fire protection and lighting (etc) on the Affected Property. Power will be provided by the Employer the Contractor needs to ensure his own cabling, connections, DB Boards and CoC certificates of installations and connections. The Employer provides special colour coded bins for refuse disposal. These bins are emptied by the The Contractor ensures that all workers under his control strictly adhere to the correct use of refuse bins as stated in the Plant. - Employer will make available to the Contractor 220/230-volt electrical supply free of charge from the closest existing point of supply. - The Contractor is to make provision for the necessary extensions and plug points. - All Electrical boards must be inspected and tested before connecting to a power supply and then a CoC must be issued by the Contractor - The Contractor will adhere to the Electrical Installation Regulations of 1992 - The Contractor provides a First Aid service to his employees and subcontractor. In the case where these prove to be inadequate, like in the event of a serious injury, the Employer’s Medical Centre and facilities are available. - Outside the Employer’s office hours, the Employer’s First Aid Services are only available for serious injuries and life threatening situations. - The Employer is entitled, however, to recover the costs incurred, in the use of the above Employer’s facilities, from the Contractor.
Provided by the Employer. This is a mandatory cross reference form clause 25.2 in TSC3. State what the Employer will provide in the way of power, water, waste disposal, telecomms, ablutions, fire protection and lighting (etc) on the Affected Property. Give hook up locations and any constraints on how the hook up is to be done. Always conclude by stating that the Contractor shall provide everything else necessary for Providing the Service.
Provided by the Employer. Employer will provide in the way of power, water, waste disposal, ablutions, fire protection and lighting (etc) on the Affected Property Contractor shall provide everything else necessary for providing the Service.
Provided by the Employer. Forklift, overhead crane, winch, electrical to 220 and 380 v power supply, portable water, compressed air up to 6bars and scaffolding, upon 24hours in advance request.
Provided by the Employer. Supply of electricity Water Telecommunications Facilities availability
Provided by the Employer. 5.8.1.1 Water and Electricity usage 5.8.1.2 Offices, Workshops and Stores
Provided by the Employer o The Contractor is liable for any damage incurred to the Employer’s facility during the period of occupation by the Contractor. o The Contractor submits a facilities checklist to the Employer for acceptance, prior to occupation and again upon departure, which serves as proof of any damage to the Employer’s facility.‌ o All expenses incurred by the Employer in the event of the Employer having to perform repairs, at a fee that is in line with the current building tariffs, are for the Contractor’s account.
Provided by the Employer. This is a mandatory cross reference form clause 25.2 in TSC3. State what the Employer will provide
Provided by the Employer. The Employer provides potable water and laydown area on the Affected Property. The Contractor shall provide everything else necessary for Providing the Service.
Provided by the Employer. The Employer may allow the Contractor, for the execution of the works, the reasonable use of its workshop, cranes, tools and equipment, provided that the Employer's own work and business are not interfered with in any manner by such use. The Contractor shall leave all workshops, cranes, tools and equipment in as good a condition as he found them, fair wear and tear excepted, and shall be liable for any damages by the Employer as a result of any act of negligence by the Contractor, his employees or sub-Contractor while using such workshop, cranes, tools and equipment. The Contractor is responsible for the repair, replacement or correction as necessary of all pieces of tools and equipment supplied by the Employer which are damaged and/or lost whilst in the Contractor's custody and control. The Employer supplies 220 & 380 V AC power supply at existing points for the purpose of the works only. All installations or equipment complies with all relevant safety regulations and requirements. Contractor to supply own 220 or 380 VAC extensions. The Employer supplies potable water for the purpose of the works, at existing points and in reasonable quantities. Uninterrupted supply is not guaranteed and is not grounds for compensation events. Accommodation of the Contractor’s employees The Contractor makes his own arrangements for accommodation and meals.