Provisioning or Requiring Activity Sample Clauses

Provisioning or Requiring Activity. The cognizant provisioning or requiring activity designated below will determine appropriate requirements (see paragraph (d) above) to be set forth in priced orders issued under paragraph

Related to Provisioning or Requiring Activity

  • Contractor Responsibility for System Agency’s Termination Costs If the System Agency terminates the Contract for cause, the Contractor shall be responsible to the System Agency for all costs incurred by the System Agency and the State of Texas to replace the Contractor. These costs include, but are not limited to, the costs of procuring a substitute vendor and the cost of any claim or litigation attributable to Contractor’s failure to perform any Work in accordance with the terms of the Contract.

  • Prevention IP shall take all appropriate measures to prevent sexual exploitation and abuse, and child safeguarding violations, by its employees, personnel or subcontractors. IP shall, inter alia, ensure that its employees, personnel or subcontractors shall have undertaken and successfully completed appropriate training with regard to the prevention of sexual exploitation and abuse, and training on safeguarding children. Such training shall include but not be limited to: reference to definitions of sexual exploitation and sexual abuse, and child safeguarding violations; a clear and unambiguous statement that any form of sexual exploitation and abuse, and any conduct that undermines the safeguarding of children, is prohibited; the requirement that any allegations of sexual exploitation and abuse, or child safeguarding violations be promptly reported as provided for in Article 14.4; and the requirement that alleged victims of sexual exploitation and abuse or child safeguarding violations, be promptly informed of and referred to available professional assistance, upon her or his consent.

  • Loop Testing/Trouble Reporting 2.1.6.1 Telepak Networks will be responsible for testing and isolating troubles on the Loops. Telepak Networks must test and isolate trouble to the BellSouth portion of a designed/non-designed unbundled Loop (e.g., UVL-SL2, UCL-D, UVL-SL1, UCL-ND, etc.) before reporting repair to the UNE Customer Wholesale Interconnection Network Services (CWINS) Center. Upon request from BellSouth at the time of the trouble report, Telepak Networks will be required to provide the results of the Telepak Networks test which indicate a problem on the BellSouth provided Loop. 2.1.6.2 Once Telepak Networks has isolated a trouble to the BellSouth provided Loop, and had issued a trouble report to BellSouth on the Loop, BellSouth will take the actions necessary to repair the Loop if a trouble actually exists. BellSouth will repair these Loops in the same time frames that BellSouth repairs similarly situated Loops to its End Users. 2.1.6.3 If Telepak Networks reports a trouble on a non-designed or designed Loop and no trouble actually exists, BellSouth will charge Telepak Networks for any dispatching and testing (both inside and outside the CO) required by BellSouth in order to confirm the Loop’s working status. 2.1.6.4 In the event BellSouth must dispatch to the end-user’s location more than once due to incorrect or incomplete information provided by Telepak Networks (e.g., incomplete address, incorrect contact name/number, etc.), BellSouth will ▇▇▇▇ ▇▇▇▇▇▇▇ Networks for each additional dispatch required to repair the circuit due to the incorrect/incomplete information provided. BellSouth will assess the applicable Trouble Determination rates from BellSouth’s FCC or state tariffs.

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the ISO OATT.

  • Vulnerability Management BNY Mellon will maintain a documented process to identify and remediate security vulnerabilities affecting its systems used to provide the services. BNY Mellon will classify security vulnerabilities using industry recognized standards and conduct continuous monitoring and testing of its networks, hardware and software including regular penetration testing and ethical hack assessments. BNY Mellon will remediate identified security vulnerabilities in accordance with its process.