PRP Group Activities Clause Samples

PRP Group Activities. In April 1991, the Interchem PRP Group performed an initial inspiection and inventory of the deteriorating wooden sheds located adjacent to the railroad tracks. The inspection revealed that the sheds housed containers with pesticides and other unidentified materials. The PRP Group transported 277 readily accessible empty drums from the sheds to Loveland Industries in Greeley, Colorado for triple rinsing and storage. The sheds were secured to restrict access. On June 13, 1991, an Administrative Order on Consent (AOC) was signed between EPA and the Interchem PRP Group. Pursuant to the June 1991 AOC, the PRP Group conducted the following site characterization activities in September/October 1991: • Exterior soil sampling; • Toxaphene Pad concrete sampling; • Monitoring well installation; • Groundwater sampling; • Conducting inventory of the Main Building; • Sampling of Tank contents. The site characterization study indicated that soil samples collected from areas on the north and east sides of the main building, as well as the toxaphene pad area, exceeded pesticide action levels established in the AOC. The study also indicated that five of the tanks contained fluids characterized as oil/water mixtures. The fire and explosive hazards associated with the tanks were considered minimal based upon the percent oxygen and low Lower Explosive Limit (LEL) values obtained using a Combustible Gas Indicator (CGI) during tank sampling in October 1991. The results of these investigations are discussed in the Site Characterization Report (WCC, 1992) with the exception of the inventory of the Main Building which is discussed in the Hazardous Materials Inventory Report (HMIR) (WCC, 1991a). The Phase I Interim Drum Removal was conducted by the PRPs pursuant to the 1991 AOC during October 1991 and consisted of the following: • All of the drums from the South Shed were removed and transferred to the North Shed. Two piles of unknown materials were removed from the South Shed and transferred to 55-gallon steel-drums, which were then moved to the North Shed. • The remaining empty containers (269) were removed from the Sheds by Heritage Remediation/Engineering, Inc. and transported to the Heritage facility in Lemont, Illinois. These drums were crushed and shipped to the U.S. Steel Works, where they were resmelted with other scrap metal. The walls, floors, and the interior roof of the sheds were vacuumed. • An inventory of the remaining drums was conducted. • Samples of the materials...

Related to PRP Group Activities

  • High Risk Activities 1. The Software is not fault-tolerant and is not designed, manufactured or intended for use or resale as on-line control equipment in hazardous environments requiring fail-safe performance, such as in the operation of nuclear facilities, aircraft navigation or communication systems, air traffic control, direct life support machines, or weapons systems, in which the failure of the Software could lead directly to death, personal injury, or severe physical or environmental damage ("High Risk Activities"). Syncro and its suppliers specifically disclaim any express or implied warranty of fitness for High Risk Activities.

  • Market Activities The Company will not, directly or indirectly, (i) take any action designed to cause or result in, or that constitutes or would reasonably be expected to constitute, the stabilization or manipulation of the price of any security of the Company to facilitate the sale or resale of Common Stock or (ii) sell, bid for, or purchase Common Stock in violation of Regulation M, or pay anyone any compensation for soliciting purchases of the Placement Shares other than the Agent.

  • Development Activities The Development activities referred to in item “b” of paragraph 3.1 include: studies and projects of implementation of the Production facilities; drilling and completion of the Producing and injection ▇▇▇▇▇; and installation of equipment and vessels for extraction, collection, Treatment, storage, and transfer of Oil and Gas. The installation referred to in item “c” includes, but is not limited to, offshore platforms, pipelines, Oil and Gas Treatment plants, equipment and facilities for measurement of the inspected Production, wellhead equipment, production pipes, flow lines, tanks, and other facilities exclusively intended for extraction, as well as oil and gas pipelines for Production Outflow and their respective compressor and pumping stations.

  • Business Activities The Company will not, and will not permit any of its Restricted Subsidiaries to, engage in any business other than Permitted Businesses, except to such extent as would not be material to the Company and its Restricted Subsidiaries taken as a whole.

  • Specific Activities Please give detailed information about the specific activities of the Project promoter and the Partner(s), with budget allocations 7.1 The main tasks of [name of the Project Promoter], referred to as the ‘Project Promoter’, are summarized as follows: Name Project activities Project budget 1 .... [mention the budget allocated to Project Promoter for the respective activity] EUR.... Activity 2 .... EUR... 7.2 The main input/responsibilities of [name of the Project Partner(s)], referred to as Partner 1, 2, etc., are summarized as follows: Name Project activities Project budget Partner 1... [briefly present the project activity implemented by Partner]. Activity 1 .... [mention the budget allocated to Partner 1 for the respective activity] EUR.... Activity 2 .... EUR... Name Project activities Project budget