PURCHASE OF POWER. (a) Seller shall sell and deliver and PGandE shall purchase and accept delivery of firm capacity and energy at the voltage level of ________ (1)kV as indicated below-- 1. Contract capacity - 8,526 kW; and 2. Energy - net energy output (2). Seller may convert its energy sale option as provided in section A-3 of Appendix A. (b) Seller shall provide the firm capacity and energy set forth above from its 10,750 kW Facility located at J. R. Wood Inc., 7916 West Bellvue Road, Atwater, California 95301. (c) The sch▇▇▇▇▇▇ ▇▇▇▇▇▇▇▇▇ ▇▇▇▇ ▇▇ ▇▇▇ ▇▇▇▇▇▇▇▇ ▇▇ ▇▇▇▇▇▇▇▇r 1, 1986. At the end of each calendar quarter Seller shall give written notice to PGandE of any change in the scheduled operation date. (d) To avoid exceeding the physical limitations of the interconnection facilities, Seller shall limit the Facility's actual rate of delivery into the PGandE system to __________ (1)kW. ---------- 1 The Seller requests, and PGandE consents, that this blank not be filled in at the time of executing the Agreement because the Seller, recognizing that the information is not yet available to make a definitive determination of the number to be inserted in this blank, shall request PGandE to perform an interconnection study to be done in its accustomed manner of making such studies to determine the number to be inserted. 2 Insert either "net energy oust" or "surplus energy output" to show the energy sale option selected by Seller. (e) The primary energy source for the Facility is natural gas. (f) If Seller does not begin construction of its Facility by __________ (2), PGandE may reallocate the [Date] existing capacity on PGandE's transmission and/or distribution system which would have been used to accommodate Seller's power deliveries to other uses. In the event of such reallocation, Seller shall pay PGandE for the cost of any upgrades or additions to PGandE's system necessary to accommodate the output from the Facility. Such additional facilities shall be installed, owned, and maintained in accordance with the applicable PGandE tariff. (g) The transformer loss adjustment factor is ________ (3) ---------------- 1 The appropriate number will be inserted upon completion of an interconnection study.
Appears in 1 contract
Sources: Power Purchase Agreement (Ridgewood Electric Power Trust Iii)
PURCHASE OF POWER. (a) Seller shall sell and deliver and PGandE shall purchase and accept delivery of firm capacity and energy at the voltage level of ________ (1)kV as indicated below-- 1. Contract capacity - 8,526 kW; and 2. Energy - net energy output (2). Seller may convert its energy sale option as provided in section A-3 of Appendix A.60 W. ------- -----
(b) Seller shall provide the firm capacity and energy set forth above from its 10,750 20,000 kW Facility -------- located at J. R. Wood Inc.the Rooney Ranch, 7916 West Bellvue RoadSections 21 and 28, AtwaterTownship 2 South, California 95301Range 3 East, Mount Diablo Base and Meridian, in the Altamont Pass area of Alameda County, California.
(c) The sch▇▇▇▇▇▇ ▇▇▇▇▇▇▇▇▇ ▇▇▇▇ ▇▇ ▇▇▇ ▇▇▇▇▇▇▇▇ ▇▇ ▇▇▇▇▇▇▇▇r 1scheduled operation date of the Facility is December 31, 19861984. At --------- --------- ---- -------- the end of each calendar quarter Seller shall give written notice to PGandE of any change in the scheduled operation date.. --------- --------- ----
(d) To avoid exceeding the physical limitations of the interconnection --------------- facilities, Seller shall limit the Facility's actual rate of delivery into the ---------- ---------- PGandE system to __________ (1)kW. ---------- 1 The Seller requests, and PGandE consents, that this blank not be filled in at the time of executing the Agreement because the Seller, recognizing that the information is not yet available to make a definitive determination of the number to be inserted in this blank, shall request PGandE to perform an interconnection study to be done in its accustomed manner of making such studies to determine the number to be inserted. 2 Insert either "net energy oust" or "surplus energy output" to show the energy sale option selected by Seller.kW. ------ ---------------------
(e) The primary energy source for the Facility is natural gasa small power production -------- facility with wind as the primary energy source.
(f) If Seller does not begin construction of its Facility by __________ (2)December 15, -------- 1984, PGandE may reallocate the [Date] existing capacity on PGandE's transmission and/or distribution system which would have been used to accommodate Seller's power deliveries to other uses. In the event of such reallocation, Seller shall pay PGandE for the cost of any upgrades or additions to PGandE's system necessary to accommodate the output from the Facility. Such additional -------- facilities shall be installed, owned, owned and maintained in accordance with the applicable PGandE tariff.
(g) The transformer loss adjustment factor is ________ (3) ---------------- 1 The appropriate number will be inserted upon completion of an interconnection studydetermined in Appendix A-19.
Appears in 1 contract
Sources: Power Purchase Agreement (Zond Windsystem Partners LTD Series 85 C)