Quantity Estimate Clause Samples

Quantity Estimate. The estimated quantities of timber by species designated for cutting under BT2.3 and expected to be cut under Utilization Standards are listed in AT2. Estimated quantity in AT2 does not include the following: (a) Damaged timber under BT2.13; (b) Unintentionally cut timber under BT2.14; (c) Construction timber under BT2.15 cut outside of Payment Units and removed from construction use for utilization by Purchaser; (d) Timber within clearing limits of Temporary Roads or other authorized clearings and that is not designated under BT2.31, BT2.33, BT2.34, or BT2.35; or (e) Dead or unstable live trees that are sufficiently tall to reach Purchaser’s landings or the roadbed of Specified Roads under BT2.32. Estimated quantities for such timber not included in AT2 shall be determined as stated in CT6.8. If Sale Area Map shows Payment Units where Marking or Measuring is to be completed after date of timber sale advertisement, the objective of Forest Service shall be to designate for cutting in such Payment Units sufficient timber so that Sale Area shall yield the approximate estimated quantities by species or species groups stated in AT2. However, the estimated quantities stated in AT2 are not to be construed as guarantees or limitations of the timber quantities to be designated for cutting under the terms of this contract. Quantity adjustments shall not be made under this Section after there is modification for Catastrophic Damage under BT8.32.
Quantity Estimate. The estimated quantities of timber by species designated for cutting under CT.3 and expected to be cut under Utilization Standards are listed in AT.2. Estimated quantity in AT.2 does not include the following: (a) Damaged timber under CT.1.3; (b) Unintentionally cut timber under CT.1.4; (c) Construction timber under CT.1.5 cut outside of Payment Units and removed from construction use for utiliza- tion by Contractor; (d) Timber within clearing limits of Temporary Roads or other authorized clearings and that is not designated un- der CT.3.1, CT.3.3, CT.3.4, or CT.3.5; or (e) Dead or unstable live trees that are sufficiently tall to reach Contractor’s landings, work areas, or the roadbed of Specified Roads under CT.
Quantity Estimate. The estimated quantities of timber by species designated for cutting under BT2.3 and expected to be cut under Utilization Standards are listed in (a) Damaged timber under BT2.13; (b) Unintentionally cut timber under BT2.14; (c) Construction timber under BT2.15 cut outside of Payment Units and removed from construction use for uti- lization by Contractor; (d) Timber within clearing limits of Temporary Roads or other authorized clearings and that is not designated un- der BT2.31, BT2.33, BT2.34, or BT2.35; or (e) Dead or unstable live trees that are sufficiently tall to reach Contractor’s landings, work areas, or the roadbed of Specified Roads under BT2.32. Estimated quantities for such timber not included in AT2 shall be determined as stated in CT6.8. If Contract Area Map shows Payment Units where Marking or Measuring is to be completed after date of con- tract advertisement, the objective of Forest Service shall be to designate for cutting in such Payment Units sufficient timber so that Contract Area shall yield the approximate estimated quantities by species or species groups stated in AT2. However, the estimated quantities stated in AT2 are not to be construed as guarantees or limitations of the timber quantities to be designated for cutting under the terms of this contract. Quantity adjustments shall not be made under this Section after there is modification for Catastrophic Dam- age under BT8.32.
Quantity Estimate. The estimated quantities of timber by species designated for cutting under BT2.3 and ex- pected to be cut under Utilization Standards are listed on Page 1. Estimated quantity on Page 1 does not include the fol- lowing: (a) Damaged timber under BT2.13; (b) Unintentionally cut timber under BT2.14; (c) Timber within clearing limits of roads or other authorized clearings and that is not designated under BT2.31, BT2.33, BT2.34, or BT2.35; or (d) Dead or unstable live trees that are sufficiently tall to reach Purchaser’s landings or roads under BT2.32. Estimated quantities for such timber not included on Page 1 shall be determined as stated in CT6.8.
Quantity Estimate. The estimated quantities of timber by species designated for cutting under CT.3 and expected to be cut under Utilization Standards are listed in AT.2. Estimated quantity in AT.2 does not include the following:
Quantity Estimate. The estimated quantities of forest products by species Designated for harvesting under BP2.3 and expected to be harvested are listed on Page 1. Estimated quantity on Page 1 does not include the following: (a) Damaged forest products under BP2.13, or (b) Unintentionally harvested forest products under BP2.14. Estimated quantities for such forest products not included on Page 1 shall be determined as stated in CP6.8.
Quantity Estimate. Buyer shall notify Seller in writing on or before January 1 and June 30, 2001, and on or before January 1 and June 30 of each succeeding year of Buyer's good faith estimate of its requirements for the next succeeding six month period. In the event that Buyer's actual requirements exceed its estimated requirements for any given period by more than *** , then ----------------------------- *** Terms represented by this symbol are considered confidential. These confidential terms have been omitted pursuant to a Confidential Treatment Request filed with the Securities and Exchange Commission ("SEC") and have been filed separately with the SEC. Seller shall have the option, but not the obligation, to sell Buyer any or all of such requirements in excess of *** of such estimate. In the event that Seller is unable to sell Buyer *** of its projected requirements for any period, then ***. Seller shall sell, and Buyer shall purchase, all quantities sold hereunder on the terms and conditions (including without limitation credit terms) provided herein.

Related to Quantity Estimate

  • Pre-Estimate The parties agree that if Market Quotation applies an amount recoverable under this Section 6(e) is a reasonable pre-estimate of loss and not a penalty. Such amount is payable for the loss of bargain and the loss of protection against future risks and except as otherwise provided in this Agreement neither party will be entitled to recover any additional damages as a consequence of such losses.

  • Cost Estimate The cost estimate shall set out the estimated costs for the proposed Change Order in such a way that a fair evaluation can be made. It shall include a breakdown for labor, materials, equipment and markups for overhead and profit, unless TxDOT agrees otherwise. If the work is to be performed by Subcontractors and if the work is sufficiently defined to obtain Subcontractor quotes, DB Contractor shall obtain quotes (with breakdowns showing cost of labor, materials, equipment and markups for overhead and profit) on the Subcontractor’s stationery and shall include such quotes as back-up for DB Contractor’s estimate. No markup shall be allowed in excess of the amounts allowed under Section 10.6. DB Contractor shall identify all conditions with respect to prices or other aspects of the cost estimate, such as pricing contingent on firm orders being made by a certain date or the occurrence or non-occurrence of an event.