Common use of Range of Cost Plus Fixed Fee Clause in Contracts

Range of Cost Plus Fixed Fee. Actual wages must be within the allowable range shown on the Final Cost Proposal. DocuSign Envelope ID: 92042E15-24A8-4715-A668-00F8B487D7CE * The MAXIMUM AMOUNT PAYABLE is $4,567,940.05 The maximum amount payable is based on the following data and calculations: * The maximum amount payable must be based on the contract scope. The work authorization fee schedules will be derived from this attachment. Principal 20+ $75.00 $237.91 Senior Project Manager 20+ $75.00 $237.91 Project Manager 10 to 20 $62.00 $196.68 Quality Manager 10 to 20 $61.00 $193.50 Senior Engineer 15+ $55.00 $174.47 Project Engineer 10 to 15 $46.00 $145.92 Design Engineer 5 to 10 $40.00 $126.89 Engineer-In-Training 1 to 5 $33.00 $104.68 Senior Engineer Tech 15+ $37.00 $117.37 Engineer Tech 5 to 15 $30.00 $95.17 Junior Engineer Tech 1 to 5 $22.00 $69.79 Senior CADD Operator 15+ $33.00 $104.68 CADD Operator 5 to 15 $25.00 $79.30 Junior CADD Operator 1 to 5 $21.00 $66.62 Admin/Clerical $21.00 $66.62 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15-24A8-4715-A668-00F8B487D7CE Senior Project Manager 20+ $70.00 $224.83 Senior Engineer 15+ $59.00 $189.50 Project Engineer 10 to 15 $47.00 $150.96 Design Engineer 5 to 10 $39.00 $125.26 Traffic Engineer 5 to 10 $48.00 $154.17 Traffic Engineer- Modeler/Analyst 5 to 10 $37.00 $118.84 Engineer-In-Training 1 to 5 $34.00 $109.20 Senior Engineer Tech 15+ $35.00 $112.42 Engineer Tech 5 to 15 $27.00 $86.72 Junior Engineer Tech 1 to 5 $18.56 $59.61 Senior CADD Operator 15+ $27.00 $86.72 CADD Operator 5 to 15 $22.50 $72.27 Junior CADD Operator 1 to 5 $19.00 $61.03 Senior Traffic Tech 15+ $30.00 $96.36 Traffic Tech 5 to 15 $25.00 $80.30 Admin/Clerical $15.00 $48.18 Sr. Travel Demand Modeler 15+ $54.00 $173.44 Sr Project Analyst 10+ $37.00 $118.84 Project Coordinator $30.00 $96.36 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15-24A8-4715-A668-00F8B487D7CE Principal 20+ $75.70 $183.19 Senior Project Manager 20+ $69.75 $168.80 Project Manager 10 to 20 $62.00 $150.04 Quality Manager 10 to 20 $58.50 $141.57 Senior CADD Operator 15+ $28.00 $67.76 CADD Operator 5 to 15 $25.00 $60.50 Junior CADD Operator 1 to 5 $20.00 $48.40 Senior Geologist 15+ $39.00 $94.38 Geologist 5 to 15 $30.00 $72.60 Senior Environmental Planner 15+ $55.00 $133.10 Environmental Planner IV 10 to 15 $45.50 $110.11 Environmental Planner III 5 to 10 $40.00 $96.80 Environmental Planner I/II 1 to 5 $30.50 $73.81 Senior Environmental Specialist 15+ $45.00 $108.90 Environmental Specialist 5 to 15 $30.50 $73.81 Junior Environmental Specialist 1 to 5 $26.00 $62.92 Senior Environmental Scientist 15+ $49.50 $119.79 Environmental Scientist IV 10 to 15 $42.00 $101.64 Environmental Scientist III 5 to 10 $34.00 $82.28 Environmental Scientist I/II 1 to 5 $29.00 $70.18 Senior Biologist 15+ $40.00 $96.80 Biologist IV 10 to 15 $33.00 $79.86 Biologist III 5 to 10 $30.00 $72.60 Biologist I/II 1 to 5 $28.50 $68.97 Senior Archeologist-Principal Investigator 15+ $41.00 $99.22 Archeologist IV 10 to 15 $35.00 $84.70 Archeologist III 5 to 10 $31.00 $75.02 Archeologist I/II 1 to 5 $27.00 $65.34 Senior Field Tech (Envrionmental, Biological, Archeological) 15+ $22.00 $53.24 Field Tech (Envrionmental, Biological, Archeological) 5 to 15 $17.00 $41.14 Senior Historian 15+ $32.00 $77.44 Historian IV 10 to 15 $30.20 $73.08 Historian III 5 to 10 $29.50 $71.39 Historian I/II 1 to 5 $27.00 $65.34 Senior Public Involvement Officer 15+ $42.00 $101.64 Public Involvement Officer 5 to 15 $35.00 $84.70 Senior Public Involvement Specialist 15+ $43.50 $105.27 Public Involvement Specialist 5 to 15 $33.00 $79.86 Junior Public Involvement Specialist 1 to 5 $24.50 $59.29 Senior Transportation Planner 15+ $35.00 $84.70 Transportation Planner IV 10 to 15 $32.75 $79.26 Transportation Planner III 5 to 10 $29.00 $70.18 Transportation Planner I/II 1 to 5 $20.00 $48.40 Senior Urban Planner 15+ $44.50 $107.69 Urban Planner IV 10 to 15 $39.00 $94.38 Urban Planner III 5 to 10 $33.50 $81.07 Urban Planner I/II 1 to 5 $31.00 $75.02 Environmental Inspector 5+ $32.00 $77.44 Admin/Clerical $18.00 $43.56 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15-24A8-4715-A668-00F8B487D7CE Principal 20+ $67.00 $180.57 Senior Public Involvement Officer 15+ $49.12 $132.38 Public Involvement Officer 5 to 15 $35.00 $94.33 Senior Public Involvement Specialist 15+ $41.66 $112.27 Public Involvement Specialist 5 to 15 $33.48 $90.23 Junior Public Involvement Specialist 1 to 5 $22.00 $59.29 Admin/Clerical $20.00 $53.90 Engineer Tech $28.00 $75.46 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15-24A8-4715-A668-00F8B487D7CE RPLS - Project Manager 15+ $52.00 $141.24 RPLS - Task Leader 10 to 15 $43.50 $118.16 Senior Survey Tech (Must be Surveyor in Training (SIT), or ha 5 to 10 $32.50 $88.28 Survey Tech 1 to 5 $29.50 $80.13 Senior GIS Operator $33.00 $89.64 GIS Operator $29.00 $78.77 GIS Technician $27.00 $73.34 Admin/Clerical $19.44 $52.80 Project Coordinator - Mobile LiDAR $43.00 $116.80 Mobile LiDAR Processing Technician $33.00 $89.64 Project Coordinator - AM $44.00 $119.51 Certified Photogrammetrist $36.00 $97.78 Analytical Triangulation Specialist $27.00 $73.34 Aerial Mapping Technician $25.06 $68.07 Orthophoto Specialist $24.00 $65.19 Mapping Editor (includes QA/QC, Finishing, & Finalization) $26.25 $71.30 Aerial Office Technician $20.00 $54.32 Project Coordinator - AP $40.75 $110.69 Aerial Processing Technician $29.75 $80.81 Project Coordinator - FWAL $40.50 $110.01 Airborne LiDAR Processing Technician $33.00 $89.64 Project Coordinator - HAL $40.50 $110.01 Helicopter LiDAR Processing Technician $31.50 $85.56 Photo Lab Specialist $20.25 $55.00 Photo Processing Technician $20.25 $55.00 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15-24A8-4715-A668-00F8B487D7CE 1 - Person Survey Crew (GPS and Robotic Total Stations included in indirect cost rate. Mileage not included.) hour $90.00 2 - Person Survey Crew (GPS and Robotic Total Stations included in indirect cost rate. Mileage not included.) hour $135.00 3 - Person Survey Crew (GPS and Robotic Total Stations included in indirect cost rate. Mileage not included.) hour $165.00 4 - Person Survey Crew (GPS and Robotic Total Stations included in indirect cost rate. Mileage not included.) hour $190.00 LiDAR Mobile Mapping System, (Includes Vehicle Operator, LiDAR Technician mileage on project and fuel) (Does not include travel to project.) day $6,500.00 Mobilization for Aerial Photography/LiDAR Fixed Wing Aircraft (Includes aircraft, Pilot, Camera/LiDAR Operator, fuel and transportation cost) Per Project $18,000.00 Aerial Photography Flight Crew Fixed Wing Aircraft (Includes Pilot and Camera Operator) hour $180.00 LiDAR Flight Crew Fixed Wing Aircraft (Includes Pilot and LiDAR Operator) hour $190.00 Mobilization for Helicopter Airborne LiDAR (Includes helicopter, Pilot, LiDAR Operator, fuel and transportation cost) Per Project $19,000.00 Helicopter Flight Crew Fixed Wing Aircraft (Includes Pilot and LiDAR Operator) hour $190.00 The unit costs shown include labor, overhead, and profit. Payment based on units completed. No partial payments. All unit costs are negotiated costs and are not subject to change or adjustment. Unit Cost Payment Basis: If unit costs by year are included, unit costs billed should correspond to the fiscal or calendar year, if applicable, in which the work was done. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15-24A8-4715-A668-00F8B487D7CE Principal 20+ $76.00 $238.00 Senior Project Manager 20+ $74.00 $231.74 Project Manager 10 to 20 $62.00 $194.16 Quality Manager 10 to 20 $59.00 $184.76 Senior Engineer 15+ $60.00 $187.90 Project Engineer 10 to 15 $46.00 $144.05 Design Engineer 5 to 10 $40.00 $125.26 Engineer-In-Training 1 to 5 $33.00 $103.34 Senior Engineer Tech 15+ $38.00 $119.00 Engineer Tech 5 to 15 $25.00 $78.29 Junior Engineer Tech 1 to 5 $21.00 $65.76 Senior CADD Operator 15+ $33.00 $103.34 CADD Operator 5 to 15 $30.00 $93.95 Junior CADD Operator 1 to 5 $21.00 $65.76 Senior Project Controller 15+ $35.50 $111.17 Project Controller 5 to 15 $30.00 $93.95 Public Involvement Specialist 5 to 15 $30.00 $93.95 Junior Public Involvement Specialist 1 to 5 $22.00 $68.89 Senior Utility Coordinator $47.00 $147.18 Utility Coordinator $36.00 $112.74 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15-24A8-4715-A668-00F8B487D7CE Mobilization/Demobilization mile $4.00 Level C and D. Includes labor and equipment for records research, CADD, and mapping. LF $0.44 Level B (Designation). Includes labor and equipment for records research, designating, engineering, surveying, and CADD. LF $1.30 Level A (Location, Test Holes). Includes labor and equipment for vacuum excavation, engineering, surveying, and CADD. 0 to 5 ft. each $950.00 > 5 to 8 ft. each $1,250.00 > 8 to 13 ft. each $1,550.00 > 13 to 20 ft. each $1,900.00 > 20 ft. VF over 20' $150.00 ▇▇▇ ▇▇▇▇▇ Services One (1) Designating Person with Equipment hour $120.00 ▇▇▇ ▇▇▇▇▇ Services Two (2) Designtating Person with Equipment hour $160.00 ▇▇▇ Quality Level B 3D Modeling Equipment SPAR Day $700.00 The unit costs shown include labor, overhead, and profit. Payment based on units completed. No partial payments. All unit costs are negotiated costs and are not subject to change or adjustment. Unit Cost Payment Basis: If unit costs by year are included, unit costs billed should correspond to the fiscal or calendar year, if applicable, in which the work was done. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15-24A8-4715-A668-00F8B487D7CE Lodging/Hotel - Taxes and Fees day/person $25.00 Lodging/Hotel (Taxes/fees not included) day/person Current State Rate Meals (Excluding alcohol & tips) (Overnight stay required) day/person Current State Rate Mileage mile Current State Rate SUV or ATV Rental (Includes taxes and fees; Insurance costs will not be reimbursed) day $110.00 Rental Car Fuel gallon $3.75 Rental Car (Includes taxes and fees; Insurance costs will not be reimbursed) day $52.00 Air Travel - In State - Short Notice (Coach) Rd Trip/person $350.00 Air Travel - In State - 2+ Wks Notice (Coach) Rd Trip/person Coach Fare $300.00 Air Travel - Out of State - 2+ Wks Notice (Coach) Rd Trip/person $450.00 Air Travel - Out of State - Short Notice (Coach) Rd Trip/person $650.00 Taxi/Cab fare each/person $29.00 Parking day $15.00 Toll Charges each $3.00 Standard Postage letter Current Postal Rate Certified Letter Return Receipt each Current Postal Rate Overnight Mail - letter size each Current Postal Rate Overnight Mail - oversized box each $30.00 Courier Services each $25.00 Photocopies B/W (11" X 17") each $0.20 Photocopies B/W (8 1/2" X 11") each $0.12 Photocopies Color (11" X 17") each $0.75 Photocopies Color (8 1/2" X 11") each $0.45 Digital Ortho Plotting sheet $1.40 Plots (B/W on Bond) per sq. ft. $0.50 Plots (Color on Bond) per sq. ft. $1.05 Plots (Color on Photographic Paper) per sq. ft. $4.00 Color Graphics on Foam Board square foot $4.00 Presentation Boards 30" X 40" Color Mounted each $80.00 Report Printing each $35.00 Report Binding and tabbing each $4.50 Reproduction of CD/DVD each $3.00 CDs each $1.00 4" X 6" Digital Color Print picture $0.25 Tx Parks & Wildlife Data Request Fees each $50.00 Hazardous Materials Database Search per search $300.00 Noise Meter Rental per project $57.00 Environmental Field Supplies (lathes, stakes, flagging, spray paint, etc.) day $30.00 Curator (Drawer & TX Archaeological Research Lab for artifacts & report) per project $2,100.00 Newspaper Advertisement per publication $2,500.00 Court Reporter page $4.00 Court Reporter (Public Meetings, Hearings & Transcription) day $500.00 DocuSign Envelope ID: 92042E15-24A8-4715-A668-00F8B487D7CE Translator (English to Spanish, other language as appropriate, or Sign Language) for Public Involvement event $400.00 Translator (English to Spanish, other language as appropriate, or Sign Language) hour $100.00 Custodian for Public Involvement hour/custodian $30.00 Sound Technician for Public Involvement event $250.00 Public Involvement Facility Rental (estimate) 4 hours $750.00 Public involvement Facility Rental (estimate) 8 hours $3,000.00 Public Involvement Facility Rental (estimate) hour $150.00 Public Involvement Facility Rental event $800.00 Audio - Equipment Rental each $300.00 Audio - Visual Equipment Rental event $250.00 Public Notices - Mass Mailing (500 pieces) per mailing $500.00 FEMA FIS (Manual) each $5.00 FEMA FIS Backup Data Request each $300.00 FEMA Map Revision Submittal (CLOMR/LOMR) (Submittal Fee Only) each $5,000.00 FEMA Model/Floodplain Hardcopy each $250.00 Railroad - Flagger (Service provided by RR) hour $60.00 Railroad - Insurance in addition to STD Minimum Required (Minimum coverage of $1 Million required by RR.) each $3,500.00 Railroad - Permit [Note: Read and then delete this note. Most railroad companies charge a fee of $500 for the permit to access their property.] each $1,500.00 Railroad - Safety Training (If required - Heavy Rail Safety Training Certificate, includes classroom training and employee certification card.) Per Person $150.00 Traffic Control Services, Arrow Boards and Attenuator trucks - Large Project (Includes labor, equipment and fuel) day $2,800.00 Traffic Control Services, Arrow Boards and Attenuator trucks - Medium Project (Includes labor, equipment and fuel) day $2,000.00 Traffic Control Services, Arrow Boards and Attenuator trucks - Small Project (Includes labor, equipment and fuel) day $1,450.00 Attenuator trucks - (Lan

Appears in 1 contract

Sources: Contract for Engineering Services

Range of Cost Plus Fixed Fee. Actual wages must be within the allowable range shown on the Final Cost Proposal. DocuSign Envelope ID: 92042E15AB744679-24A8CB8D-4896-47159ABF-A668-00F8B487D7CE FCD210B48E63 * The MAXIMUM AMOUNT PAYABLE is $4,567,940.05 _1,000,000.00. The maximum amount payable is based on the following data and calculations: * The maximum Maximum amount payable must be based on the contract scopenegotiated for each work authorization. The work authorization fee schedules will be derived from this attachment. Principal 20+ $75.00 $237.91 Senior Project Manager 20+ $75.00 $237.91 DocuSign Envelope ID: AB744679-CB8D-4896-9ABF-FCD210B48E63 Project Manager 10 to 20 $62.00 76.00 $196.68 Quality Manager 10 to 20 $61.00 $193.50 232.22 Senior Engineer 15+ $55.00 63.00 $174.47 192.50 Project Engineer 10 to 15 $46.00 56.00 $145.92 171.11 Design Engineer 5 to 10 $40.00 $126.89 122.22 Traffic Engineer 5 to 10 $50.00 $152.78 Traffic Engineer- Modeler/Analyst 5 to 10 $41.00 $125.28 Engineer-In-Training 1 to 5 $33.00 32.50 $104.68 99.31 Senior Engineer Tech 15+ $37.00 34.50 $117.37 105.42 Engineer Tech 5 to 15 $30.00 28.00 $95.17 Junior Engineer Tech 1 to 5 $22.00 $69.79 85.56 Senior CADD Operator 15+ $33.00 $104.68 100.83 CADD Operator 5 to 15 $25.00 27.50 $79.30 84.03 Senior Traffic Tech 15+ $32.00 $97.78 Traffic Tech 5 to 15 $26.00 $79.45 Junior Traffic Tech 1 to 5 $15.00 $45.83 Admin/Clerical $22.00 $67.22 Senior ITS Engineer 15+ $60.00 $183.33 ITS Project Engineer 10 to 15 $50.00 $152.78 ITS Design Engineer 5 to 10 $41.00 $125.28 Signal Systems Specialist $37.50 $114.58 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. Page 3 of 10 Attachment E - Fee Schedule Project Manager 10 to 20 $72.26 $174.87 Senior Engineer 15+ $67.02 $162.19 Project Engineer 10 to 15 $52.55 $127.17 Design Engineer 5 to 10 $46.01 $111.34 Traffic Engineer 5 to 10 $46.01 $111.34 Engineer-In-Training 1 to 5 $37.50 $90.75 Senior Engineer Tech 15+ $39.76 $96.22 Engineer Tech 5 to 15 $34.00 $82.28 Senior CADD Operator 15+ $36.78 $89.01 CADD Operator 5 to 15 $31.54 $76.33 Junior CADD Operator 1 to 5 $21.00 26.54 $66.62 64.23 Senior Traffic Tech 15+ $26.00 $62.92 Traffic Tech 5 to 15 $23.00 $55.66 Junior Traffic Tech 1 to 5 $20.00 $48.40 Admin/Clerical $21.00 24.52 $66.62 59.34 Signal Systems Specialist $28.84 $69.79 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15AB744679-24A8CB8D-4896-47159ABF-A668-00F8B487D7CE Senior FCD210B48E63 Project Manager 20+ $70.00 $224.83 Senior Engineer 15+ $59.00 $189.50 Project Engineer 10 to 15 20 $47.00 75.00 $150.96 Design Engineer 5 to 10 $39.00 $125.26 Traffic Engineer 5 to 10 $48.00 $154.17 Traffic Engineer- Modeler/Analyst 5 to 10 $37.00 $118.84 Engineer-In-Training 1 to 5 $34.00 $109.20 Senior Engineer Tech 15+ $35.00 $112.42 Engineer Tech 5 to 15 $27.00 $86.72 Junior Engineer Tech 1 to 5 $18.56 $59.61 Senior CADD Operator 15+ $27.00 $86.72 CADD Operator 5 to 15 $22.50 $72.27 Junior CADD Operator 1 to 5 $19.00 $61.03 181.50 Senior Traffic Tech 15+ $30.00 20.00 $96.36 48.40 Traffic Tech 5 to 15 $25.00 17.50 $80.30 42.35 Junior Traffic Tech 1 to 5 $15.00 $36.30 Admin/Clerical $15.00 20.00 $48.18 Sr. Travel Demand Modeler 15+ $54.00 $173.44 Sr Project Analyst 10+ $37.00 $118.84 Project Coordinator $30.00 $96.36 48.40 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15AB744679-24A8CB8D-4896-47159ABF-A668-00F8B487D7CE Principal 20+ $75.70 $183.19 Senior Project Manager 20+ $69.75 $168.80 FCD210B48E63 Project Manager 10 to 20 $74.00 $211.71 Senior Engineer 15+ $62.00 $150.04 Quality Manager 177.38 Project Engineer 10 to 20 15 $58.50 53.00 $141.57 151.63 Design Engineer 5 to 10 $43.00 $123.02 Traffic Engineer 5 to 10 $48.00 $137.33 Traffic Engineer- Modeler/Analyst 5 to 10 $40.00 $114.44 Engineer-In-Training 1 to 5 $33.50 $95.84 Senior Engineer Tech 15+ $36.00 $103.00 Engineer Tech 5 to 15 $30.00 $85.83 Senior CADD Operator 15+ $28.00 32.00 $67.76 91.55 CADD Operator 5 to 15 $25.00 27.00 $60.50 Junior CADD Operator 1 to 5 77.25 Admin/Clerical $20.00 23.00 $48.40 65.80 Senior Geologist ITS Engineer 15+ $39.00 58.00 $94.38 Geologist 5 to 15 $30.00 $72.60 Senior Environmental Planner 15+ $55.00 $133.10 Environmental Planner IV 165.94 ITS Project Engineer 10 to 15 $45.50 46.00 $110.11 Environmental Planner III 131.61 ITS Design Engineer 5 to 10 $40.00 $96.80 Environmental Planner I/II 1 to 5 $30.50 $73.81 Senior Environmental Specialist 15+ $45.00 $108.90 Environmental Specialist 5 to 15 $30.50 $73.81 Junior Environmental Specialist 1 to 5 $26.00 $62.92 Senior Environmental Scientist 15+ $49.50 $119.79 Environmental Scientist IV 10 to 15 $42.00 $101.64 Environmental Scientist III 5 to 10 $34.00 $82.28 Environmental Scientist I/II 1 to 5 $29.00 $70.18 Senior Biologist 15+ $40.00 $96.80 Biologist IV 10 to 15 $33.00 $79.86 Biologist III 5 to 10 $30.00 $72.60 Biologist I/II 1 to 5 $28.50 $68.97 Senior Archeologist-Principal Investigator 15+ $41.00 $99.22 Archeologist IV 10 to 15 $35.00 $84.70 Archeologist III 5 to 10 $31.00 $75.02 Archeologist I/II 1 to 5 $27.00 $65.34 Senior Field Tech (Envrionmental, Biological, Archeological) 15+ $22.00 $53.24 Field Tech (Envrionmental, Biological, Archeological) 5 to 15 $17.00 $41.14 Senior Historian 15+ $32.00 $77.44 Historian IV 10 to 15 $30.20 $73.08 Historian III 5 to 10 $29.50 $71.39 Historian I/II 1 to 5 $27.00 $65.34 Senior Public Involvement Officer 15+ $42.00 $101.64 Public Involvement Officer 5 to 15 $35.00 $84.70 Senior Public Involvement Specialist 15+ $43.50 $105.27 Public Involvement Specialist 5 to 15 $33.00 $79.86 Junior Public Involvement Specialist 1 to 5 $24.50 $59.29 Senior Transportation Planner 15+ $35.00 $84.70 Transportation Planner IV 10 to 15 $32.75 $79.26 Transportation Planner III 5 to 10 $29.00 $70.18 Transportation Planner I/II 1 to 5 $20.00 $48.40 Senior Urban Planner 15+ $44.50 $107.69 Urban Planner IV 10 to 15 $39.00 $94.38 Urban Planner III 5 to 10 $33.50 $81.07 Urban Planner I/II 1 to 5 $31.00 $75.02 Environmental Inspector 5+ $32.00 $77.44 Admin/Clerical $18.00 $43.56 114.44 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15AB744679-24A8CB8D-4896-47159ABF-A668-00F8B487D7CE Principal 20+ FCD210B48E63 Project Manager 10 to 20 $67.00 74.00 $180.57 203.00 Senior Public Involvement Officer Engineer 15+ $49.12 62.50 $132.38 Public Involvement Officer 171.46 Project Engineer 10 to 15 $62.00 $170.08 Design Engineer 5 to 10 $42.00 $115.22 Traffic Engineer 5 to 10 $46.00 $126.19 Traffic Engineer- Modeler/Analyst 5 to 10 $45.50 $124.82 Engineer-In-Training 1 to 5 $33.50 $91.90 Senior Engineer Tech 15+ $37.00 $101.50 Engineer Tech 5 to 15 $35.00 30.00 $94.33 82.30 Senior Public Involvement Specialist CADD Operator 15+ $41.66 34.50 $112.27 Public Involvement Specialist 94.64 CADD Operator 5 to 15 $33.48 28.00 $90.23 Junior Public Involvement Specialist 1 to 5 $22.00 $59.29 76.81 Admin/Clerical $20.00 22.00 $53.90 60.35 Senior ITS Engineer Tech 15+ $28.00 66.00 $75.46 181.06 ITS Project Engineer 10 to 15 $50.00 $137.16 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15AB744679-24A8CB8D-4896-47159ABF-A668-00F8B487D7CE RPLS - FCD210B48E63 Project Manager 10 to 20 $75.00 $233.58 Senior Engineer 15+ $52.00 60.10 $141.24 RPLS - Task Leader 187.18 Project Engineer 10 to 15 $43.50 51.00 $118.16 Senior Survey Tech (Must be Surveyor in Training (SIT), or ha 158.84 Design Engineer 5 to 10 $32.50 40.50 $88.28 Survey Tech 126.13 Traffic Engineer 5 to 10 $44.00 $137.03 Traffic Engineer- Modeler/Analyst 5 to 10 $40.00 $124.58 Engineer-In-Training 1 to 5 $29.50 32.00 $80.13 99.66 Senior GIS Operator Engineer Tech 15+ $33.00 $89.64 GIS Operator $29.00 $78.77 GIS Technician 102.78 Engineer Tech 5 to 15 $27.00 $73.34 84.09 Senior CADD Operator 15+ $33.00 $102.78 CADD Operator 5 to 15 $27.00 $84.09 Senior Traffic Tech 15+ $31.00 $96.55 Traffic Tech 5 to 15 $26.00 $80.98 Admin/Clerical $19.44 22.00 $52.80 68.52 Senior ITS Engineer 15+ $60.10 $187.18 ITS Project Coordinator - Mobile LiDAR Engineer 10 to 15 $43.00 50.00 $116.80 Mobile LiDAR Processing Technician $33.00 $89.64 Project Coordinator - AM $44.00 $119.51 Certified Photogrammetrist $36.00 $97.78 Analytical Triangulation Specialist $27.00 $73.34 Aerial Mapping Technician $25.06 $68.07 Orthophoto Specialist $24.00 $65.19 Mapping Editor (includes QA/QC, Finishing, & Finalization) $26.25 $71.30 Aerial Office Technician $20.00 $54.32 Project Coordinator - AP $40.75 $110.69 Aerial Processing Technician $29.75 $80.81 Project Coordinator - FWAL 155.72 ITS Design Engineer 5 to 10 $40.50 $110.01 Airborne LiDAR Processing Technician $33.00 $89.64 Project Coordinator - HAL $40.50 $110.01 Helicopter LiDAR Processing Technician $31.50 $85.56 Photo Lab 126.13 Signal Systems Specialist $20.25 37.50 $55.00 Photo Processing Technician $20.25 $55.00 116.79 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15AB744679-24A8CB8D-4896-47159ABF-A668FCD210B48E63 24-00F8B487D7CE 1 Hour Automated Tube Counts - Person Survey Crew Volume N/A per counter/day $160.00 24-Hour Automated Tube Counts - Bi-directional N/A per counter/day $210.00 24-Hour Automated Tube Counts - Urban Freeway Main Lanes N/A per counter/day $350.00 24-Hour Automated Tube Counts - Rural Main Lanes N/A per counter/day $280.00 24-Hour Automated Tube Counts - Speed or Class N/A per counter/day $220.00 Intersection Turning Movement Counts N/A per counter/hour/day $120.00 Turning Movement Count (GPS 12-hour Manual) Minor Intersection N/A each $650.00 Turning Movement Count (12-hour Manual) Major Intersection N/A each $1,400.00 2-hour Turning Movment Count, Minor Intersection, Weekday N/A each $190.00 2-hour Turning Movment Count, Major Intersection, Weekday N/A each $350.00 2-hour Turning Movment Count, Minor Intersection, Weekend N/A each $235.00 2-hour Turning Movment Count, Major Intersection, Weekend N/A each $450.00 Travel Time Runs in DMI-Equipped Vehicle (Includes labor and Robotic Total Stations included in indirect cost rate. Mileage not included.mileage) N/A hour $90.00 2 - Person 150.00 Speed Survey Crew (GPS and Robotic Total Stations included in indirect cost rate. Mileage not included.location) hour N/A per location $135.00 3 - Person Survey Crew (GPS and Robotic Total Stations included in indirect cost rate. Mileage not included.) hour 200.00 Intersection Diagrams / Sketches N/A per intersection $165.00 4 - Person Survey Crew (GPS and Robotic Total Stations included in indirect cost rate. Mileage not included.) hour 120.00 Intersection Photography N/A per intersection $190.00 LiDAR Mobile Mapping System, (Includes Vehicle Operator, LiDAR Technician mileage on project and fuel) (Does not include travel to project.) 35.00 24-Hour Volume Video/Radar Count Per Lane-Main Lane per lane/day per lane/day $6,500.00 Mobilization for Aerial Photography170.00 24-Hour 3 Classification Video/LiDAR Fixed Wing Aircraft (Includes aircraft, Pilot, CameraRadar Count Per Lane-Main Lane per lane/LiDAR Operator, fuel and transportation cost) day per lane/day $175.00 24Hour 13 Classification Video Count Per Project Lane-Main Lane per lane/day per lane/day $18,000.00 Aerial Photography Flight Crew Fixed Wing Aircraft (Includes Pilot and Camera Operator) hour 360.00 72-Hour Bluetooth O&D Main Lane per device per device $180.00 LiDAR Flight Crew Fixed Wing Aircraft (Includes Pilot and LiDAR Operator) hour 1,100.00 72-Hour Bluetooth O&D Arterial per device per device $190.00 Mobilization for Helicopter Airborne LiDAR (Includes helicopter, Pilot, LiDAR Operator, fuel and transportation cost) Per Project $19,000.00 Helicopter Flight Crew Fixed Wing Aircraft (Includes Pilot and LiDAR Operator) hour $190.00 550.00 The unit costs shown include labor, overhead, and profit. Payment based on units completed. No partial payments. All unit costs are negotiated costs and are not subject to change or adjustment. Unit Cost Payment Basis: If unit costs by year are included, unit costs billed should correspond to the fiscal or calendar year, if applicable, in which the work was done. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15AB744679-24A8CB8D-4896-47159ABF-A668-00F8B487D7CE Principal 20+ $76.00 $238.00 Senior Project Manager 20+ $74.00 $231.74 Project Manager 10 to 20 $62.00 $194.16 Quality Manager 10 to 20 $59.00 $184.76 Senior Engineer 15+ $60.00 $187.90 Project Engineer 10 to 15 $46.00 $144.05 Design Engineer 5 to 10 $40.00 $125.26 Engineer-In-Training 1 to 5 $33.00 $103.34 Senior Engineer Tech 15+ $38.00 $119.00 Engineer Tech 5 to 15 $25.00 $78.29 Junior Engineer Tech 1 to 5 $21.00 $65.76 Senior CADD Operator 15+ $33.00 $103.34 CADD Operator 5 to 15 $30.00 $93.95 Junior CADD Operator 1 to 5 $21.00 $65.76 Senior Project Controller 15+ $35.50 $111.17 Project Controller 5 to 15 $30.00 $93.95 Public Involvement Specialist 5 to 15 $30.00 $93.95 Junior Public Involvement Specialist 1 to 5 $22.00 $68.89 Senior Utility Coordinator $47.00 $147.18 Utility Coordinator $36.00 $112.74 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. FCD210B48E63 DocuSign Envelope ID: 92042E15AB744679-24A8CB8D-4896-47159ABF-A668-00F8B487D7CE Mobilization/Demobilization mile $4.00 Level C and D. Includes labor and equipment for records research, CADD, and mapping. LF $0.44 Level B (Designation). Includes labor and equipment for records research, designating, engineering, surveying, and CADD. LF $1.30 Level A (Location, Test Holes). Includes labor and equipment for vacuum excavation, engineering, surveying, and CADD. 0 to 5 ft. each $950.00 > 5 to 8 ft. each $1,250.00 > 8 to 13 ft. each $1,550.00 > 13 to 20 ft. each $1,900.00 > 20 ft. VF over 20' $150.00 ▇▇▇ ▇▇▇▇▇ Services One (1) Designating Person with Equipment hour $120.00 ▇▇▇ ▇▇▇▇▇ Services Two (2) Designtating Person with Equipment hour $160.00 ▇▇▇ Quality Level B 3D Modeling Equipment SPAR Day $700.00 The unit costs shown include labor, overhead, and profit. Payment based on units completed. No partial payments. All unit costs are negotiated costs and are not subject to change or adjustment. Unit Cost Payment Basis: If unit costs by year are included, unit costs billed should correspond to the fiscal or calendar year, if applicable, in which the work was done. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15-24A8-4715-A668-00F8B487D7CE Lodging/Hotel - Taxes and Fees day/person $25.00 FCD210B48E63 Lodging/Hotel (Taxes/fees not included) day/person Current State Rate Lodging/Hotel - Taxes and Fees day/person $30.00 Meals (Excluding alcohol & tips) (Overnight stay required) day/person Current State Rate Mileage mile Current State Rate SUV or ATV Rental (Includes taxes and fees; Insurance costs will not be reimbursed) day $110.00 Rental Car Fuel gallon $3.75 Rental Car (Includes taxes and fees; Insurance costs will not be reimbursed) day $52.00 65.00 Rental Car Fuel gallon $4.00 Air Travel - In State - Short Notice (Coach) Rd Trip/person $350.00 550.00 Air Travel - In State - 2+ Wks Notice (Coach) Rd Trip/person Coach Fare $300.00 Air Travel - Out of State - 2+ Wks Notice (Coach) Rd Trip/person $450.00 Air Travel - Out of State - Short Notice (Coach) Rd Trip/person $650.00 Taxi/Cab fare each/person $29.00 400.00 Parking day $15.00 20.00 Toll Charges each $3.00 Standard Postage letter Current Postal Rate Certified Letter Return Receipt each Current Postal Rate Overnight Mail - letter size each Current Postal Rate $28.00 Overnight Mail - oversized box each $30.00 40.00 Courier Services each $25.00 30.00 Photocopies B/W (8 1/2" X 11") each $0.10 Photocopies B/W (11" X 17") each $0.20 Photocopies B/W Color (8 1/2" X 11") each $0.12 0.40 Photocopies Color (11" X 17") each $0.75 Photocopies Color (8 1/2" X 11") each $0.45 Digital Ortho Plotting sheet $1.40 Plots (B/W on Bond) per sq. ft. $0.50 Plots (Color on Bond) per sq. ft. $1.05 Plots (Color on Photographic Paper) per sq. ft. $4.00 Color Graphics on Foam Board square foot $4.00 Presentation Boards 30" X 40" Color Mounted each $80.00 Report Printing each $35.00 Report Binding and tabbing each $4.50 Reproduction of CD/DVD each $3.00 0.80 CDs each $1.00 4" X 6" Digital Color Print picture 2.00 Profit not allowed on Other Direct Expenses. For Cost Plus Fixed Fee, Specified Rate, and Unit Cost - Fixed cost items to be billed at the fixed cost rate. Documentation, such as a usage log, must be maintained for audit purposes, and may be required to be submitted as a basis for reimbursement. For items with a maximum cost, actual cost to be billed not to exceed the maximum shown. Itemized receipts must be maintained for audit purposes, and may be required to be submitted as a basis for reimbursement. For Lump Sum - No documentation required. Invoicing by physical percent complete includes combination of direct labor and other direct expenses. NOTE: For Cost Plus Fixed Fee, Specified Rate, and Unit Cost - Miscellaneous other direct expenses up to $0.25 Tx Parks & Wildlife Data Request Fees each 100 per unit will be reimbursed at cost if approved and documented in advance by the State's Project Manager. Miscellaneous other direct expenses of $50.00 Hazardous Materials Database Search 100 per search unit or more will not be reimbursed unless a supplemental agreement to the contract and work authorization (if WAs are used) has been executed in advance authorizing the miscellaneous other direct expenses. No more than $300.00 Noise Meter Rental per project $57.00 Environmental Field Supplies (lathes, stakes, flagging, spray paint, etc.) day $30.00 Curator (Drawer & TX Archaeological Research Lab for artifacts & report) per project $2,100.00 Newspaper Advertisement per publication $2,500.00 Court Reporter page $4.00 Court Reporter (Public Meetings, Hearings & Transcription) day $500.00 2,500 in miscellaneous other direct expenses may be approved by the State's Project Manager over the life of this contract including prime provider and subproviders. For Lump Sum - This statement does not apply. DocuSign Envelope ID: 92042E15AB744679-24A8CB8D-4896-47159ABF-A668FCD210B48E63 DocuSign Envelope ID: AB744679-00F8B487D7CE Translator (English to Spanish, other language as appropriate, or Sign Language) for Public Involvement event $400.00 Translator (English to Spanish, other language as appropriate, or Sign Language) hour $100.00 Custodian for Public Involvement hour/custodian $30.00 Sound Technician for Public Involvement event $250.00 Public Involvement Facility Rental (estimate) 4 hours $750.00 Public involvement Facility Rental (estimate) 8 hours $3,000.00 Public Involvement Facility Rental (estimate) hour $150.00 Public Involvement Facility Rental event $800.00 Audio - Equipment Rental each $300.00 Audio - Visual Equipment Rental event $250.00 Public Notices - Mass Mailing (500 pieces) per mailing $500.00 FEMA FIS (Manual) each $5.00 FEMA FIS Backup Data Request each $300.00 FEMA Map Revision Submittal (CLOMR/LOMR) (Submittal Fee Only) each $5,000.00 FEMA Model/Floodplain Hardcopy each $250.00 Railroad - Flagger (Service provided by RR) hour $60.00 Railroad - Insurance in addition to STD Minimum Required (Minimum coverage of $1 Million required by RR.) each $3,500.00 Railroad - Permit [NoteCB8D-4896-9ABF-FCD210B48E63 DocuSign Envelope ID: Read and then delete this note. Most railroad companies charge a fee of $500 for the permit to access their property.] each $1,500.00 Railroad - Safety Training (If required - Heavy Rail Safety Training Certificate, includes classroom training and employee certification card.) Per Person $150.00 Traffic Control Services, Arrow Boards and Attenuator trucks - Large Project (Includes labor, equipment and fuel) day $2,800.00 Traffic Control Services, Arrow Boards and Attenuator trucks - Medium Project (Includes labor, equipment and fuel) day $2,000.00 Traffic Control Services, Arrow Boards and Attenuator trucks - Small Project (Includes labor, equipment and fuel) day $1,450.00 Attenuator trucks - (LanAB744679-CB8D-4896-9ABF-FCD210B48E63

Appears in 1 contract

Sources: Contract for Engineering Services

Range of Cost Plus Fixed Fee. Actual wages must be within the allowable range shown on the Final Cost Proposal. DocuSign Envelope ID: 92042E15EE409C2E-41D7-24A848B7-47158169-A668-00F8B487D7CE C48996185D1B * The MAXIMUM AMOUNT PAYABLE is $4,567,940.05 The maximum amount payable is based on the following data and calculations: 5,000,000.00. * The maximum Maximum amount payable must be based on the contract scopenegotiated for each work authorization. The work authorization fee schedules will be derived from this attachment. Principal 20+ $75.00 $237.91 Senior Project Manager 20+ $75.00 $237.91 Project Manager 10 to 20 20+ $62.00 70.00 $196.68 212.30 Quality Manager 10 to 20 $61.00 63.00 $193.50 191.07 Senior Engineer 15+ $55.00 60.00 $174.47 181.97 Senior Structural Engineer 15+ $65.00 $197.13 Structural Engineer 5 to 15 $60.00 $181.97 Project Engineer 10 to 15 $46.00 49.00 $145.92 148.61 Design Engineer 5 to 10 $40.00 42.00 $126.89 127.38 Engineer-In-Training 1 to 5 $33.00 32.00 $104.68 97.05 Senior Engineer Tech 15+ $37.00 32.00 $117.37 97.05 Engineer Tech 5 to 15 $30.00 27.00 $95.17 Junior Engineer Tech 1 to 5 $22.00 $69.79 81.89 Senior CADD Operator 15+ $33.00 $104.68 100.08 CADD Operator 5 to 15 $25.00 28.00 $79.30 84.92 Junior CADD Operator 1 to 5 $21.00 23.00 $66.62 69.75 Admin/Clerical $21.00 22.00 $66.62 66.72 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15EE409C2E-41D7-24A848B7-47158169-A668-00F8B487D7CE Senior C48996185D1B Project Manager 10 to 20+ $70.00 67.50 $224.83 210.15 Quality Manager 10 to 20 $62.00 $193.03 Senior Engineer 15+ $59.00 55.00 $189.50 171.23 Senior Structural Engineer 15+ $64.00 $199.25 Structural Engineer 5 to 15 $53.00 $165.01 Project Engineer 10 to 15 $47.00 49.00 $150.96 152.55 Design Engineer 5 to 10 $39.00 $125.26 Traffic Engineer 5 to 10 $48.00 $154.17 Traffic Engineer- Modeler/Analyst 5 to 10 $37.00 $118.84 121.42 Engineer-In-Training 1 to 5 $34.00 31.50 $109.20 98.07 Senior Engineer Tech 15+ $35.00 36.00 $112.42 112.08 Engineer Tech 5 to 15 $27.00 $86.72 84.06 Junior Engineer Tech 1 to 5 $18.56 20.00 $59.61 62.27 Senior CADD Operator 15+ $27.00 31.00 $86.72 96.51 CADD Operator 5 to 15 $22.50 25.00 $72.27 77.83 Junior CADD Operator 1 to 5 $19.00 23.00 $61.03 Senior Traffic Tech 15+ $30.00 $96.36 Traffic Tech 5 to 15 $25.00 $80.30 71.61 Admin/Clerical $15.00 21.00 $48.18 Sr. Travel Demand Modeler 15+ $54.00 $173.44 Sr Project Analyst 10+ $37.00 $118.84 Project Coordinator $30.00 $96.36 65.38 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15EE409C2E-41D7-24A848B7-47158169-A668-00F8B487D7CE Principal 20+ $75.70 $183.19 Senior Project Manager 20+ $69.75 $168.80 C48996185D1B Project Manager 10 to 20 20+ $62.00 66.00 $150.04 184.90 Quality Manager 10 to 20 $58.50 60.00 $141.57 168.10 Senior CADD Operator Engineer 15+ $28.00 57.00 $67.76 159.69 Project Engineer 10 to 15 $43.75 $122.57 Field Engineer 5 to 10 $31.50 $88.25 Design Engineer 5 to 10 $30.05 $84.19 Engineer-In-Training 1 to 5 $28.85 $80.83 Senior Engineer Tech 15+ $30.77 $86.20 Engineer Tech 5 to 15 $24.00 $67.24 Junior Engineer Tech 1 to 5 $20.00 $56.03 CADD Operator 5 to 15 $25.00 $60.50 Junior CADD Operator 1 to 5 $20.00 $48.40 70.04 Senior Geologist 15+ $39.00 32.00 $94.38 89.65 Geologist 5 to 15 $30.00 27.88 $72.60 Senior Environmental Planner 15+ $55.00 $133.10 Environmental Planner IV 10 to 15 $45.50 $110.11 Environmental Planner III 5 to 10 $40.00 $96.80 Environmental Planner I/II 1 to 5 $30.50 $73.81 Senior Environmental Specialist 15+ $45.00 $108.90 Environmental Specialist 5 to 15 $30.50 $73.81 Junior Environmental Specialist 1 to 5 $26.00 $62.92 Senior Environmental Scientist 15+ $49.50 $119.79 Environmental Scientist IV 10 to 15 $42.00 $101.64 Environmental Scientist III 5 to 10 $34.00 $82.28 Environmental Scientist I/II 1 to 5 $29.00 $70.18 Senior Biologist 15+ $40.00 $96.80 Biologist IV 10 to 15 $33.00 $79.86 Biologist III 5 to 10 $30.00 $72.60 Biologist I/II 1 to 5 $28.50 $68.97 Senior Archeologist-Principal Investigator 15+ $41.00 $99.22 Archeologist IV 10 to 15 $35.00 $84.70 Archeologist III 5 to 10 $31.00 $75.02 Archeologist I/II 1 to 5 $27.00 $65.34 Senior Field Tech (Envrionmental, Biological, Archeological) 15+ $22.00 $53.24 Field Tech (Envrionmental, Biological, Archeological) 5 to 15 $17.00 $41.14 Senior Historian 15+ $32.00 $77.44 Historian IV 10 to 15 $30.20 $73.08 Historian III 5 to 10 $29.50 $71.39 Historian I/II 1 to 5 $27.00 $65.34 Senior Public Involvement Officer 15+ $42.00 $101.64 Public Involvement Officer 5 to 15 $35.00 $84.70 Senior Public Involvement Specialist 15+ $43.50 $105.27 Public Involvement Specialist 5 to 15 $33.00 $79.86 Junior Public Involvement Specialist 1 to 5 $24.50 $59.29 Senior Transportation Planner 15+ $35.00 $84.70 Transportation Planner IV 10 to 15 $32.75 $79.26 Transportation Planner III 5 to 10 $29.00 $70.18 Transportation Planner I/II 1 to 5 $20.00 $48.40 Senior Urban Planner 15+ $44.50 $107.69 Urban Planner IV 10 to 15 $39.00 $94.38 Urban Planner III 5 to 10 $33.50 $81.07 Urban Planner I/II 1 to 5 $31.00 $75.02 Environmental Inspector 5+ $32.00 $77.44 78.11 Admin/Clerical $18.00 $43.56 50.43 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15EE409C2E-41D7-24A848B7-47158169-A668-00F8B487D7CE Principal C48996185D1B Project Manager 10 to 20+ $67.00 71.00 $180.57 Senior Public Involvement Officer 210.09 RPLS - Project Manager 15+ $49.12 58.00 $132.38 Public Involvement Officer 171.62 Senior Engineer 15+ $62.00 $183.46 Project Engineer 10 to 15 $48.00 $142.03 Field Engineer 5 to 10 $40.00 $118.36 Design Engineer 5 to 10 $41.00 $121.32 Engineer-In-Training 1 to 5 $33.00 $97.65 Senior Engineer Tech 15+ $35.00 $103.57 Engineer Tech 5 to 15 $35.00 31.00 $94.33 Senior Public Involvement Specialist 15+ $41.66 $112.27 Public Involvement Specialist 5 to 15 $33.48 $90.23 91.73 Junior Public Involvement Specialist Engineer Tech 1 to 5 $22.00 $59.29 65.10 Senior CADD Operator 15+ $32.00 $94.69 CADD Operator 5 to 15 $27.00 $79.89 Junior CADD Operator 1 to 5 $23.00 $68.06 RPLS - Task Leader 10 to 15 $47.00 $139.07 Senior Survey Tech (Must be Surveyor in Training (SIT), or ha 5 to 10 $33.00 $97.65 Survey Tech 1 to 5 $29.00 $85.81 Senior GIS Operator $33.00 $97.65 GIS Operator $29.00 $85.81 GIS Technician $27.00 $79.89 Flagger $20.00 $59.18 Abstractor (Property Deed Researcher, Courthouse or Internet $23.00 $68.06 Admin/Clerical $20.00 22.00 $53.90 Engineer Tech 65.10 Project Coordinator - AM $42.00 $124.28 Certified Photogrammetrist $36.00 $106.52 Analytical Triangulation Specialist $28.00 $75.46 82.85 Aerial Mapping Technician $27.00 $79.89 Orthophoto Specialist $27.00 $79.89 Mapping Editor (includes QA/QC, Finishing, & Finalization) $26.00 $76.93 Aerial Office Technician $19.00 $56.22 Project Coordinator - AP $39.00 $115.40 Aerial Processing Technician $29.00 $85.81 Project Coordinator - FWAL $37.00 $109.48 Airborne LiDAR Processing Technician $30.00 $88.77 Project Coordinator - HAL $37.00 $109.48 Helicopter LiDAR Processing Technician $30.00 $88.77 Photo Lab Specialist $20.00 $59.18 Photo Processing Technician $21.00 $62.14 Project Coordinator - Mobile LiDAR $43.00 $127.24 Mobile LiDAR Processing Technician $31.00 $91.73 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15EE409C2E-41D7-24A848B7-47158169-A668-00F8B487D7CE C48996185D1B RPLS - Project Manager 15+ $52.00 53.00 $141.24 154.93 Senior CADD Operator 15+ $33.00 $96.47 CADD Operator 5 to 15 $27.00 $78.93 RPLS - Task Leader 10 to 15 $43.50 46.00 $118.16 134.47 Senior Survey Tech (Must be Surveyor in Training (SIT), or ha 5 to 10 $32.50 35.00 $88.28 102.31 Survey Tech 1 to 5 $29.50 32.00 $80.13 Senior GIS Operator 93.54 Flagger $33.00 15.00 $89.64 GIS Operator 43.85 Abstractor (Property Deed Researcher, Courthouse or Internet $29.00 25.00 $78.77 GIS Technician $27.00 $73.34 73.08 Admin/Clerical $19.44 23.00 $52.80 Project Coordinator - Mobile LiDAR $43.00 $116.80 Mobile LiDAR Processing Technician $33.00 $89.64 Project Coordinator - AM $44.00 $119.51 Certified Photogrammetrist $36.00 $97.78 Analytical Triangulation Specialist $27.00 $73.34 Aerial Mapping Technician $25.06 $68.07 Orthophoto Specialist $24.00 $65.19 Mapping Editor (includes QA/QC, Finishing, & Finalization) $26.25 $71.30 Aerial Office Technician $20.00 $54.32 Project Coordinator - AP $40.75 $110.69 Aerial Processing Technician $29.75 $80.81 Project Coordinator - FWAL $40.50 $110.01 Airborne LiDAR Processing Technician $33.00 $89.64 Project Coordinator - HAL $40.50 $110.01 Helicopter LiDAR Processing Technician $31.50 $85.56 Photo Lab Specialist $20.25 $55.00 Photo Processing Technician $20.25 $55.00 67.23 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15EE409C2E-41D7-24A848B7-47158169-A668C48996185D1B Project Manager 10 to 20+ $64.00 $157.70 Senior Engineer 15+ $53.00 $130.59 Project Engineer 10 to 15 $42.00 $103.49 Design Engineer 5 to 10 $38.00 $93.63 Engineer-00F8B487D7CE In-Training 1 to 5 $33.00 $81.31 Senior Engineer Tech 15+ $33.00 $81.31 Engineer Tech 5 to 15 $30.00 $73.92 Junior Engineer Tech 1 to 5 $22.00 $54.21 Senior CADD Operator 15+ $33.00 $81.31 CADD Operator 5 to 15 $28.00 $68.99 Junior CADD Operator 1 to 5 $25.00 $61.60 Senior Utilities Coordinator $46.00 $113.34 Utilities Coordinator $35.00 $86.24 Senior Utlilities Field Inspector $35.00 $86.24 Utilities Field Inspector $32.00 $78.85 Admin/Clerical $24.00 $59.14 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: EE409C2E-41D7-48B7-8169-C48996185D1B Project Manager 10 to 20+ $77.00 $162.31 Quality Manager 10 to 20 $62.50 $131.75 Senior Engineer 15+ $68.00 $143.34 Project Engineer 10 to 15 $48.00 $101.18 Design Engineer 5 to 10 $40.50 $85.37 Engineer-In-Training 1 to 5 $32.00 $67.45 Senior Hydrologist 15+ $60.00 $126.48 Hydrologist 5 to 15 $50.00 $105.40 Senior Engineer Tech 15+ $37.00 $77.99 Engineer Tech 5 to 15 $30.00 $63.24 Junior Engineer Tech 1 to 5 $24.00 $50.59 Senior CADD Operator 15+ $36.00 $75.89 CADD Operator 5 to 15 $27.00 $56.91 Junior CADD Operator 1 to 5 $24.00 $50.59 Admin/Clerical $22.00 $46.37 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: EE409C2E-41D7-48B7-8169-C48996185D1B Project Manager 10 to 20+ $68.00 $207.78 Quality Manager 10 to 20 $64.00 $195.56 Senior Engineer 15+ $59.50 $181.81 Project Engineer 10 to 15 $50.00 $152.78 Design Engineer 5 to 10 $42.00 $128.33 Engineer-In-Training 1 to 5 $33.00 $100.83 Senior Engineer Tech 15+ $35.00 $106.95 Engineer Tech 5 to 15 $29.00 $88.61 Junior Engineer Tech 1 to 5 $23.00 $70.28 Senior CADD Operator 15+ $35.00 $106.95 CADD Operator 5 to 15 $26.00 $79.45 Junior CADD Operator 1 to 5 $22.00 $67.22 Senior Traffic Tech 15+ $35.00 $106.95 Traffic Tech 5 to 15 $29.00 $88.61 Junior Traffic Tech 1 to 5 $23.00 $70.28 Admin/Clerical $22.00 $67.22 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: EE409C2E-41D7-48B7-8169-C48996185D1B Project Manager 10 to 20+ $150.00 Senior Public Involvement Officer 15+ $99.72 Public Involvement Officer 5 to 15 $86.24 Senior Public Involvement Specialist 15+ $99.72 Public Involvement Specialist 5 to 15 $86.24 Junior Public Involvement Specialist 1 to 5 $60.00 Senior GIS Operator $83.55 GIS Operator $67.38 GIS Technician $64.49 Admin/Clerical $51.21 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: EE409C2E-41D7-48B7-8169-C48996185D1B 1 - Person Survey Crew (GPS and Robotic Total Stations included in indirect cost rate. Mileage not included.) hour $90.00 110.00 2 - Person Survey Crew (GPS and Robotic Total Stations included in indirect cost rate. Mileage not included.) hour $135.00 150.00 3 - Person Survey Crew (GPS and Robotic Total Stations included in indirect cost rate. Mileage not included.) hour $165.00 180.00 4 - Person Survey Crew (GPS and Robotic Total Stations included in indirect cost rate. Mileage not included.) hour $190.00 210.00 LiDAR Mobile Mapping System, (Includes Vehicle Operator, LiDAR Technician mileage on project and fuel) (Does not include travel to project.) day $6,500.00 8,200.00 Mobilization for Aerial Photography/LiDAR Fixed Wing Aircraft (Includes aircraft, Pilot, Camera/LiDAR Operator, fuel and transportation cost) Per Project per project $18,000.00 21,000.00 Aerial Photography Flight Crew Fixed Wing Aircraft (Includes Pilot and Camera Operator) hour $180.00 200.00 LiDAR Flight Crew Fixed Wing Aircraft (Includes Pilot and LiDAR Operator) hour $190.00 200.00 Mobilization for Helicopter Airborne LiDAR (Includes helicopter, Pilot, LiDAR Operator, fuel and transportation cost) Per Project per project $19,000.00 2,100.00 Helicopter Flight Crew Fixed Wing Aircraft (Includes Pilot and LiDAR Operator) hour $190.00 200.00 LiDAR Mobile Mapping System (travel to project) mile $3.75 The unit costs shown include labor, overhead, and profit. Payment based on units completed. No partial payments. All unit costs are negotiated costs and are not subject to change or adjustment. Unit Cost Payment Basis: If unit costs by year are included, unit costs billed should correspond to the fiscal or calendar year, if applicable, in which the work was done. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15EE409C2E-41D7-24A848B7-47158169-A668-00F8B487D7CE Principal 20+ $76.00 $238.00 Senior Project Manager 20+ $74.00 $231.74 Project Manager 10 to 20 $62.00 $194.16 Quality Manager 10 to 20 $59.00 $184.76 Senior Engineer 15+ $60.00 $187.90 Project Engineer 10 to 15 $46.00 $144.05 Design Engineer 5 to 10 $40.00 $125.26 Engineer-In-Training C48996185D1B 1 to 5 $33.00 $103.34 Senior Engineer Tech 15+ $38.00 $119.00 Engineer Tech 5 to 15 $25.00 $78.29 Junior Engineer Tech 1 to 5 $21.00 $65.76 Senior CADD Operator 15+ $33.00 $103.34 CADD Operator 5 to 15 $30.00 $93.95 Junior CADD Operator 1 to 5 $21.00 $65.76 Senior Project Controller 15+ $35.50 $111.17 Project Controller 5 to 15 $30.00 $93.95 Public Involvement Specialist 5 to 15 $30.00 $93.95 Junior Public Involvement Specialist 1 to 5 $22.00 $68.89 Senior Utility Coordinator $47.00 $147.18 Utility Coordinator $36.00 $112.74 Contract rates include labor, overhead, - Person Survey Crew (GPS and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification Robotic Total Stations included in the contract, but indirect cost rate. Mileage not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15-24A8-4715-A668-00F8B487D7CE Mobilization/Demobilization mile $4.00 Level C and D. Includes labor and equipment for records research, CADD, and mapping. LF $0.44 Level B (Designation). Includes labor and equipment for records research, designating, engineering, surveying, and CADD. LF $1.30 Level A (Location, Test Holes). Includes labor and equipment for vacuum excavation, engineering, surveying, and CADD. 0 to 5 ft. each $950.00 > 5 to 8 ft. each $1,250.00 > 8 to 13 ft. each $1,550.00 > 13 to 20 ft. each $1,900.00 > 20 ft. VF over 20' $150.00 ▇▇▇ ▇▇▇▇▇ Services One (1included.) Designating Person with Equipment hour $120.00 ▇▇▇ ▇▇▇▇▇ Services Two 110.00 2 - Person Survey Crew (2GPS and Robotic Total Stations included in indirect cost rate. Mileage not included.) Designtating Person with Equipment hour $160.00 ▇▇▇ Quality Level B 3D Modeling Equipment SPAR Day 155.00 3 - Person Survey Crew (GPS and Robotic Total Stations included in indirect cost rate. Mileage not included.) hour $700.00 180.00 4 - Person Survey Crew (GPS and Robotic Total Stations included in indirect cost rate. Mileage not included.) hour $210.00 The unit costs shown include labor, overhead, and profit. Payment based on units completed. No partial payments. All unit costs are negotiated costs and are not subject to change or adjustment. Unit Cost Payment Basis: If unit costs by year are included, unit costs billed should correspond to the fiscal or calendar year, if applicable, in which the work was done. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15EE409C2E-41D7-24A848B7-47158169-A668-00F8B487D7CE Lodging/Hotel - Taxes C48996185D1B Volumetric Shrinkage ASTM D427 each $65.00 Standard ▇▇▇▇▇▇▇ Test ASTM D698 each $180.00 Modified ▇▇▇▇▇▇▇ Test ASTM D1557 each $200.00 Standard Penetration Test (SPT) ASTM D1586 LF $28.00 California Bearing Ratio (Single Sample without MD Curve) ASTM D1883 test $210.00 Unconfined Compressive Strength (Soil) ASTM D2166 each $48.00 Hydraulic Conductivity Permeability ASTM D2434 each $240.00 One Dimensional Consolidation Properties of Soil ASTM D2435 each $450.00 Unconfined Compressive Strength (Rock) ASTM D2938 each $70.00 Direct Shear Test of Soils Under Consolidated Drained Conditions ASTM D3080 set of 3 $680.00 Splitting Tensile of Intact Rock Core ASTM D3967 each $125.00 Water Stand Pipes ASTM D4043 LF $20.00 Calcium Carbonate Content of Soils ASTM D4373 each $45.00 Hydraulic Conductivity Permeability ASTM D4511 each $250.00 One Dimensional Swell, Methods A & B ASTM D4546 each $180.00 One Dimensional Swell, Method C ASTM D4546 each $200.00 Permeability of Silt and Fees day/person $25.00 Lodging/Hotel (Taxes/fees not included) day/person Current State Rate Meals (Excluding alcohol & tips) (Overnight stay required) day/person Current State Rate Mileage mile Current State Rate SUV or ATV Rental (Includes taxes and fees; Insurance costs will not be reimbursed) day $110.00 Rental Car Fuel gallon $3.75 Rental Car (Includes taxes and fees; Insurance costs will not be reimbursed) day $52.00 Air Travel - In State - Short Notice (Coach) Rd Trip/person $350.00 Air Travel - In State - 2+ Wks Notice (Coach) Rd Trip/person Coach Fare Clays ASTM D5084 each $300.00 Air Travel - Out of State - 2+ Wks Notice Suction Test (CoachFilter Method) Rd Trip/person $450.00 Air Travel - Out of State - Short Notice (Coach) Rd Trip/person $650.00 Taxi/Cab fare each/person $29.00 Parking day $15.00 Toll Charges ASTM D5298 each $3.00 Standard Postage letter Current Postal Rate Certified Letter Return Receipt each Current Postal Rate Overnight Mail - letter size each Current Postal Rate Overnight Mail - oversized box 57.00 Soil Boring with SPT ASTM D1586 LF $26.00 Soil Boring/Rock Coring with TCP ( < 60 ft.) Tex-132-E LF $30.00 Soil Boring/Rock Coring with TCP ( > 60 ft.) Tex-132-E LF $35.00 Soil Boring/Rock Coring without TCP ( < 60 ft.) LF $26.00 Soil Boring /Rock Coring without TCP ( > 60 ft.) LF $30.00 Soil Boring without TCP ( < 60 ft.): (a) Utlizing Continuous Sampler ASTM D1587 LF $26.00 (b) Shelby Push Tubes Extruded in Field ASTM D1587 LF $28.00 (c) Augering LF $18.00 Soil Boring without TCP ( > 60 ft.): (a) Utlizing Continuous Sampler ASTM D1587 LF $28.00 (b) Shelby Push Tubes Extruded in Field ASTM D1587 LF $30.00 Core/drill operator/technician and coring equipment used to drill flexable and rigid pavment (2-man crew) Trip $180.00 (a) 4-in. diameter cores Inch $8.00 (b) 6-in. diameter cores Inch $10.00 Determining of Moisture Content in Soils TEX103-E each $30.00 Courier Services 9.00 Determining Liquid Limit of Soils TEX 104-E each $25.00 Photocopies B/W (11" X 17") 28.00 Determining Plastic Limit of Soils TEX 105-E each $0.20 Photocopies B/W (8 1/2" X 11") 28.00 Particle Size Analysis of Soils TEX 110-E each $0.12 Photocopies Color 55.00 Determining the Amount of Material in Soils Finer than the 78 micrometer (11" X 17"No. 200) Sieve TEX 111-E each $0.75 Photocopies Color (8 1/2" X 11") 43.00 Bar Linear Shrinkage of Fine Aggregate Tex-107-E each $0.45 Digital Ortho Plotting sheet $1.40 Plots (B/W on Bond) per sq. ft. $0.50 Plots (Color on Bond) per sq. ft. $1.05 Plots (Color on Photographic Paper) per sq. ft. $4.00 Color Graphics on Foam Board square foot $4.00 Presentation Boards 30" X 40" Color Mounted each $80.00 Report Printing each $35.00 Report Binding and tabbing each $4.50 Reproduction 32.00 Determining the Specific Gravity of CD/DVD each $3.00 CDs each $1.00 4" X 6" Digital Color Print picture $0.25 Tx Parks & Wildlife Data Request Fees Soils Tex-108-E each $50.00 Hazardous Laboratory Compaction Characteristics and Moisture-Density Relationship of Subgrade, Embankment Soils and Backfill Materials Database Search per search $300.00 Noise Meter Rental per project $57.00 Environmental Field Supplies (lathes, stakes, flagging, spray paint, etc.) day $30.00 Curator (Drawer & TX Archaeological Research Lab for artifacts & report) per project $2,100.00 Newspaper Advertisement per publication $2,500.00 Court Reporter page $4.00 Court Reporter (Public Meetings, Hearings & Transcription) day $500.00 DocuSign Envelope ID: 92042E15Tex-114-24A8-4715-A668-00F8B487D7CE Translator (English to Spanish, other language as appropriate, or Sign Language) for Public Involvement event $400.00 Translator (English to Spanish, other language as appropriate, or Sign Language) hour $100.00 Custodian for Public Involvement hour/custodian $30.00 Sound Technician for Public Involvement event $250.00 Public Involvement Facility Rental (estimate) 4 hours $750.00 Public involvement Facility Rental (estimate) 8 hours $3,000.00 Public Involvement Facility Rental (estimate) hour $150.00 Public Involvement Facility Rental event $800.00 Audio - Equipment Rental E each $300.00 Audio - Visual Equipment Rental event $250.00 Public Notices - Mass Mailing (500 pieces) per mailing $500.00 FEMA FIS (Manual) 180.00 Triaxial Compression for Disturbed Soils and Base Materials Tex-117-E each $5.00 FEMA FIS Backup Data Request each $300.00 FEMA Map Revision Submittal (CLOMR/LOMR) (Submittal Fee Only) each $5,000.00 FEMA Model/Floodplain Hardcopy 1,000.00 Soil-Cement Testing Tex-120-E each $250.00 Railroad - Flagger Soil-Lime Testing (Service provided by RR4 points) hour $60.00 Railroad - Insurance in addition to STD Minimum Required (Minimum coverage of $1 Million required by RR.) Tex-121-E each $3,500.00 Railroad - Permit [Note: Read and then delete this note. Most railroad companies charge a fee of $500 for the permit to access their property.] each $1,500.00 Railroad - Safety Training (If required - Heavy Rail Safety Training Certificate, includes classroom training and employee certification card.) Per Person $150.00 Traffic Control Services, Arrow Boards and Attenuator trucks - Large Project (Includes labor, equipment and fuel) day $2,800.00 Traffic Control Services, Arrow Boards and Attenuator trucks - Medium Project (Includes labor, equipment and fuel) day $2,000.00 Traffic Control Services, Arrow Boards and Attenuator trucks - Small Project (Includes labor, equipment and fuel) day $1,450.00 Attenuator trucks - (Lan2

Appears in 1 contract

Sources: Contract for Engineering Services

Range of Cost Plus Fixed Fee. Actual wages must be within the allowable range shown on the Final Cost Proposal. DocuSign Envelope ID: 92042E15BFA78C97-24A81D45-47154148-A6689A63-00F8B487D7CE 639ABCB9BFF8 * The MAXIMUM AMOUNT PAYABLE is $4,567,940.05 _1,000,000.00. The maximum amount payable is based on the following data and calculations: * The maximum Maximum amount payable must be based on the contract scopenegotiated for each work authorization. The work authorization fee schedules will be derived from this attachment. Principal 20+ $75.00 $237.91 Senior Project Manager 20+ $75.00 $237.91 Project Manager 10 to 20 $62.00 70.00 $196.68 Quality Manager 10 to 20 $61.00 $193.50 227.02 Senior Engineer 15+ $55.00 59.00 $174.47 191.34 Project Engineer 10 to 15 $46.00 52.00 $145.92 168.64 Design Engineer 5 to 10 $40.00 37.00 $126.89 120.00 Traffic Engineer 5 to 10 $52.00 $168.64 Traffic Engineer- Modeler/Analyst 5 to 10 $39.00 $126.48 Engineer-In-Training 1 to 5 $33.00 30.50 $104.68 98.92 Senior Engineer Tech 15+ $37.00 33.00 $117.37 107.02 Engineer Tech 5 to 15 $30.00 26.00 $95.17 Junior Engineer Tech 1 to 5 $22.00 $69.79 84.32 Senior CADD Operator 15+ $33.00 30.00 $104.68 97.29 CADD Operator 5 to 15 $25.00 23.50 $79.30 Junior CADD Operator 1 to 5 $21.00 $66.62 76.21 Admin/Clerical $21.00 $66.62 68.11 Senior ITS Engineer 15+ $59.00 $191.34 ITS Project Engineer 10 to 15 $48.00 $155.67 ITS Design Engineer 5 to 10 $39.00 $126.48 Signal Systems Specialist $35.00 $113.51 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15BFA78C97-24A81D45-47154148-A6689A63-00F8B487D7CE Senior 639ABCB9BFF8 Project Manager 20+ 10 to 20 $70.00 74.00 $224.83 211.71 Senior Engineer 15+ $59.00 62.00 $189.50 177.38 Project Engineer 10 to 15 $47.00 53.00 $150.96 151.63 Design Engineer 5 to 10 $39.00 43.00 $125.26 123.02 Traffic Engineer 5 to 10 $48.00 $154.17 137.33 Traffic Engineer- Modeler/Analyst 5 to 10 $37.00 40.00 $118.84 114.44 Engineer-In-Training 1 to 5 $34.00 33.50 $109.20 95.84 Senior Engineer Tech 15+ $35.00 36.00 $112.42 103.00 Engineer Tech 5 to 15 $27.00 30.00 $86.72 Junior Engineer Tech 1 to 5 $18.56 $59.61 85.83 Senior CADD Operator 15+ $27.00 32.00 $86.72 91.55 CADD Operator 5 to 15 $22.50 27.00 $72.27 Junior CADD Operator 1 to 5 $19.00 $61.03 Senior Traffic Tech 15+ $30.00 $96.36 Traffic Tech 5 to 15 $25.00 $80.30 77.25 Admin/Clerical $15.00 23.00 $48.18 Sr. Travel Demand Modeler 65.80 Senior ITS Engineer 15+ $54.00 58.00 $173.44 Sr 165.94 ITS Project Analyst 10+ Engineer 10 to 15 $37.00 46.00 $118.84 Project Coordinator 131.61 ITS Design Engineer 5 to 10 $30.00 40.00 $96.36 114.44 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15BFA78C97-24A81D45-47154148-A6689A63-00F8B487D7CE Principal 20+ $75.70 $183.19 Senior Project Manager 20+ $69.75 $168.80 639ABCB9BFF8 Project Manager 10 to 20 $62.00 75.00 $150.04 Quality Manager 10 to 20 $58.50 $141.57 181.50 Senior CADD Operator Traffic Tech 15+ $28.00 20.00 $67.76 CADD Operator 48.40 Traffic Tech 5 to 15 $25.00 17.50 $60.50 42.35 Junior CADD Operator Traffic Tech 1 to 5 $20.00 15.00 $48.40 Senior Geologist 15+ $39.00 $94.38 Geologist 5 to 15 $30.00 $72.60 Senior Environmental Planner 15+ $55.00 $133.10 Environmental Planner IV 10 to 15 $45.50 $110.11 Environmental Planner III 5 to 10 $40.00 $96.80 Environmental Planner I36.30 Admin/II 1 to 5 $30.50 $73.81 Senior Environmental Specialist 15+ $45.00 $108.90 Environmental Specialist 5 to 15 $30.50 $73.81 Junior Environmental Specialist 1 to 5 $26.00 $62.92 Senior Environmental Scientist 15+ $49.50 $119.79 Environmental Scientist IV 10 to 15 $42.00 $101.64 Environmental Scientist III 5 to 10 $34.00 $82.28 Environmental Scientist I/II 1 to 5 $29.00 $70.18 Senior Biologist 15+ $40.00 $96.80 Biologist IV 10 to 15 $33.00 $79.86 Biologist III 5 to 10 $30.00 $72.60 Biologist I/II 1 to 5 $28.50 $68.97 Senior Archeologist-Principal Investigator 15+ $41.00 $99.22 Archeologist IV 10 to 15 $35.00 $84.70 Archeologist III 5 to 10 $31.00 $75.02 Archeologist I/II 1 to 5 $27.00 $65.34 Senior Field Tech (Envrionmental, Biological, Archeological) 15+ $22.00 $53.24 Field Tech (Envrionmental, Biological, Archeological) 5 to 15 $17.00 $41.14 Senior Historian 15+ $32.00 $77.44 Historian IV 10 to 15 $30.20 $73.08 Historian III 5 to 10 $29.50 $71.39 Historian I/II 1 to 5 $27.00 $65.34 Senior Public Involvement Officer 15+ $42.00 $101.64 Public Involvement Officer 5 to 15 $35.00 $84.70 Senior Public Involvement Specialist 15+ $43.50 $105.27 Public Involvement Specialist 5 to 15 $33.00 $79.86 Junior Public Involvement Specialist 1 to 5 $24.50 $59.29 Senior Transportation Planner 15+ $35.00 $84.70 Transportation Planner IV 10 to 15 $32.75 $79.26 Transportation Planner III 5 to 10 $29.00 $70.18 Transportation Planner I/II 1 to 5 Clerical $20.00 $48.40 Senior Urban Planner 15+ $44.50 $107.69 Urban Planner IV 10 to 15 $39.00 $94.38 Urban Planner III 5 to 10 $33.50 $81.07 Urban Planner I/II 1 to 5 $31.00 $75.02 Environmental Inspector 5+ $32.00 $77.44 Admin/Clerical $18.00 $43.56 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15BFA78C97-24A81D45-47154148-A6689A63-00F8B487D7CE Principal 20+ 639ABCB9BFF8 Project Manager 10 to 20 $67.00 82.00 $180.57 224.57 Senior Public Involvement Officer Engineer 15+ $49.12 68.00 $132.38 Public Involvement Officer 186.23 Project Engineer 10 to 15 $62.50 $171.17 Senior Engineer Tech 15+ $40.00 $109.55 CADD Operator 5 to 15 $35.00 28.00 $94.33 76.68 Senior Public Involvement Specialist Traffic Tech 15+ $41.66 34.00 $112.27 Public Involvement Specialist 5 to 15 $33.48 $90.23 Junior Public Involvement Specialist 1 to 5 $22.00 $59.29 93.11 Admin/Clerical $20.00 23.00 $53.90 62.99 Senior ITS Engineer Tech 15+ $28.00 68.00 $75.46 186.23 ITS Project Engineer 10 to 15 $56.00 $153.37 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15BFA78C97-24A81D45-47154148-A6689A63-00F8B487D7CE RPLS - 639ABCB9BFF8 Project Manager 10 to 20 $72.26 $174.87 Senior Engineer 15+ $52.00 67.02 $141.24 RPLS - Task Leader 162.19 Project Engineer 10 to 15 $43.50 52.55 $118.16 Senior Survey Tech (Must be Surveyor in Training (SIT), or ha 127.17 Design Engineer 5 to 10 $32.50 46.01 $88.28 Survey 111.34 Traffic Engineer 5 to 10 $46.01 $111.34 Engineer-In-Training 1 to 5 $37.50 $90.75 Senior Engineer Tech 15+ $39.76 $96.22 Engineer Tech 5 to 15 $34.00 $82.28 Senior CADD Operator 15+ $36.78 $89.01 CADD Operator 5 to 15 $31.54 $76.33 Junior CADD Operator 1 to 5 $26.54 $64.23 Senior Traffic Tech 15+ $26.00 $62.92 Traffic Tech 5 to 15 $23.00 $55.66 Junior Traffic Tech 1 to 5 $29.50 20.00 $80.13 Senior GIS Operator $33.00 $89.64 GIS Operator $29.00 $78.77 GIS Technician $27.00 $73.34 48.40 Admin/Clerical $19.44 24.52 $52.80 Project Coordinator - Mobile LiDAR $43.00 $116.80 Mobile LiDAR Processing Technician $33.00 $89.64 Project Coordinator - AM $44.00 $119.51 Certified Photogrammetrist $36.00 $97.78 Analytical Triangulation 59.34 Signal Systems Specialist $27.00 28.84 $73.34 Aerial Mapping Technician $25.06 $68.07 Orthophoto Specialist $24.00 $65.19 Mapping Editor (includes QA/QC, Finishing, & Finalization) $26.25 $71.30 Aerial Office Technician $20.00 $54.32 Project Coordinator - AP $40.75 $110.69 Aerial Processing Technician $29.75 $80.81 Project Coordinator - FWAL $40.50 $110.01 Airborne LiDAR Processing Technician $33.00 $89.64 Project Coordinator - HAL $40.50 $110.01 Helicopter LiDAR Processing Technician $31.50 $85.56 Photo Lab Specialist $20.25 $55.00 Photo Processing Technician $20.25 $55.00 69.79 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15BFA78C97-24A81D45-47154148-A6689A63-00F8B487D7CE 1 639ABCB9BFF8 24-Hour Automated Tube Counts - Person Survey Crew Volume N/A per counter/day $160.00 24-Hour Automated Tube Counts - Bi-directional N/A per counter/day $210.00 24-Hour Automated Tube Counts - Urban Freeway Main Lanes N/A per counter/day $350.00 24-Hour Automated Tube Counts - Rural Main Lanes N/A per counter/day $280.00 24-Hour Automated Tube Counts - Speed or Class N/A per counter/day $220.00 Intersection Turning Movement Counts N/A per counter/hour/day $120.00 Turning Movement Count (GPS 12-hour Manual) Minor Intersection N/A each $650.00 Turning Movement Count (12-hour Manual) Major Intersection N/A each $1,400.00 2-hour Turning Movment Count, Minor Intersection, Weekday N/A each $190.00 2-hour Turning Movment Count, Major Intersection, Weekday N/A each $350.00 2-hour Turning Movment Count, Minor Intersection, Weekend N/A each $235.00 2-hour Turning Movment Count, Major Intersection, Weekend N/A each $450.00 Travel Time Runs in DMI-Equipped Vehicle (Includes labor and Robotic Total Stations included in indirect cost rate. Mileage not included.mileage) N/A hour $90.00 2 - Person 150.00 Speed Survey Crew (GPS and Robotic Total Stations included in indirect cost rate. Mileage not included.location) hour N/A per location $135.00 3 - Person Survey Crew (GPS and Robotic Total Stations included in indirect cost rate. Mileage not included.) hour 200.00 Intersection Diagrams / Sketches N/A per intersection $165.00 4 - Person Survey Crew (GPS and Robotic Total Stations included in indirect cost rate. Mileage not included.) hour 120.00 Intersection Photography N/A per intersection $190.00 LiDAR Mobile Mapping System, (Includes Vehicle Operator, LiDAR Technician mileage on project and fuel) (Does not include travel to project.) 35.00 24-Hour Volume Video/Radar Count Per Lane-Main Lane per lane/day per lane/day $6,500.00 Mobilization for Aerial Photography170.00 24-Hour 3 Classification Video/LiDAR Fixed Wing Aircraft (Includes aircraft, Pilot, CameraRadar Count Per Lane-Main Lane per lane/LiDAR Operator, fuel and transportation cost) day per lane/day $175.00 24Hour 13 Classification Video Count Per Project Lane-Main Lane per lane/day per lane/day $18,000.00 Aerial Photography Flight Crew Fixed Wing Aircraft (Includes Pilot and Camera Operator) hour 360.00 72-Hour Bluetooth O&D Main Lane per device per device $180.00 LiDAR Flight Crew Fixed Wing Aircraft (Includes Pilot and LiDAR Operator) hour 1,100.00 72-Hour Bluetooth O&D Arterial per device per device $190.00 Mobilization for Helicopter Airborne LiDAR (Includes helicopter, Pilot, LiDAR Operator, fuel and transportation cost) Per Project $19,000.00 Helicopter Flight Crew Fixed Wing Aircraft (Includes Pilot and LiDAR Operator) hour $190.00 550.00 The unit costs shown include labor, overhead, and profit. Payment based on units completed. No partial payments. All unit costs are negotiated costs and are not subject to change or adjustment. Unit Cost Payment Basis: If unit costs by year are included, unit costs billed should correspond to the fiscal or calendar year, if applicable, in which the work was done. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15BFA78C97-24A81D45-47154148-A6689A63-00F8B487D7CE Principal 20+ $76.00 $238.00 Senior Project Manager 20+ $74.00 $231.74 Project Manager 10 to 20 $62.00 $194.16 Quality Manager 10 to 20 $59.00 $184.76 Senior Engineer 15+ $60.00 $187.90 Project Engineer 10 to 15 $46.00 $144.05 Design Engineer 5 to 10 $40.00 $125.26 Engineer-In-Training 1 to 5 $33.00 $103.34 Senior Engineer Tech 15+ $38.00 $119.00 Engineer Tech 5 to 15 $25.00 $78.29 Junior Engineer Tech 1 to 5 $21.00 $65.76 Senior CADD Operator 15+ $33.00 $103.34 CADD Operator 5 to 15 $30.00 $93.95 Junior CADD Operator 1 to 5 $21.00 $65.76 Senior Project Controller 15+ $35.50 $111.17 Project Controller 5 to 15 $30.00 $93.95 Public Involvement Specialist 5 to 15 $30.00 $93.95 Junior Public Involvement Specialist 1 to 5 $22.00 $68.89 Senior Utility Coordinator $47.00 $147.18 Utility Coordinator $36.00 $112.74 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15-24A8-4715-A668-00F8B487D7CE Mobilization/Demobilization mile $4.00 Level C and D. Includes labor and equipment for records research, CADD, and mapping. LF $0.44 Level B (Designation). Includes labor and equipment for records research, designating, engineering, surveying, and CADD. LF $1.30 Level A (Location, Test Holes). Includes labor and equipment for vacuum excavation, engineering, surveying, and CADD. 0 to 5 ft. each $950.00 > 5 to 8 ft. each $1,250.00 > 8 to 13 ft. each $1,550.00 > 13 to 20 ft. each $1,900.00 > 20 ft. VF over 20' $150.00 ▇▇▇ ▇▇▇▇▇ Services One (1) Designating Person with Equipment hour $120.00 ▇▇▇ ▇▇▇▇▇ Services Two (2) Designtating Person with Equipment hour $160.00 ▇▇▇ Quality Level B 3D Modeling Equipment SPAR Day $700.00 The unit costs shown include labor, overhead, and profit. Payment based on units completed. No partial payments. All unit costs are negotiated costs and are not subject to change or adjustment. Unit Cost Payment Basis: If unit costs by year are included, unit costs billed should correspond to the fiscal or calendar year, if applicable, in which the work was done. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15-24A8-4715-A668-00F8B487D7CE Lodging/Hotel - Taxes and Fees day/person $25.00 639ABCB9BFF8 Lodging/Hotel (Taxes/fees not included) day/person Current State Rate Lodging/Hotel - Taxes and Fees day/person $30.00 Meals (Excluding alcohol & tips) (Overnight stay required) day/person Current State Rate Mileage mile Current State Rate SUV or ATV Rental (Includes taxes and fees; Insurance costs will not be reimbursed) day $110.00 Rental Car Fuel gallon $3.75 Rental Car (Includes taxes and fees; Insurance costs will not be reimbursed) day $52.00 55.00 Rental Car Fuel gallon $4.00 Air Travel - In State - Short Notice (Coach) Rd Trip/person $350.00 500.00 Air Travel - In State - 2+ Wks Notice (Coach) Rd Trip/person Coach Fare $300.00 Air Travel - Out of State - 2+ Wks Notice (Coach) Rd Trip/person $450.00 Air Travel - Out of State - Short Notice (Coach) Rd Trip/person $650.00 Taxi/Cab fare each/person $29.00 400.00 Parking day $15.00 18.00 Toll Charges each $3.00 5.00 Standard Postage letter Current Postal Rate Certified Letter Return Receipt each Current Postal Rate Overnight Mail - letter size each Current Postal Rate $28.00 Overnight Mail - oversized box each $30.00 35.00 Courier Services each $25.00 Photocopies B/W (11" X 17") each $0.20 Photocopies B/W (8 1/2" X 11") each $0.12 0.09 Photocopies Color B/W (11" X 17") each $0.75 0.18 Photocopies Color (8 1/2" X 11") each $0.45 Digital Ortho Plotting sheet $1.40 Plots 0.55 Photocopies Color (B/W on Bond) per sq. ft. $0.50 Plots (Color on Bond) per sq. ft. $1.05 Plots (Color on Photographic Paper) per sq. ft. $4.00 Color Graphics on Foam Board square foot $4.00 Presentation Boards 3011" X 40" Color Mounted 17") each $80.00 Report Printing each $35.00 Report Binding and tabbing each $4.50 Reproduction of CD/DVD each $3.00 1.00 CDs each $1.00 4" X 6" Digital Color Print picture 1.50 Profit not allowed on Other Direct Expenses. For Cost Plus Fixed Fee, Specified Rate, and Unit Cost - Fixed cost items to be billed at the fixed cost rate. Documentation, such as a usage log, must be maintained for audit purposes, and may be required to be submitted as a basis for reimbursement. For items with a maximum cost, actual cost to be billed not to exceed the maximum shown. Itemized receipts must be maintained for audit purposes, and may be required to be submitted as a basis for reimbursement. For Lump Sum - No documentation required. Invoicing by physical percent complete includes combination of direct labor and other direct expenses. NOTE: For Cost Plus Fixed Fee, Specified Rate, and Unit Cost - Miscellaneous other direct expenses up to $0.25 Tx Parks & Wildlife Data Request Fees each 100 per unit will be reimbursed at cost if approved and documented in advance by the State's Project Manager. Miscellaneous other direct expenses of $50.00 Hazardous Materials Database Search 100 per search unit or more will not be reimbursed unless a supplemental agreement to the contract and work authorization (if WAs are used) has been executed in advance authorizing the miscellaneous other direct expenses. No more than $300.00 Noise Meter Rental per project $57.00 Environmental Field Supplies (lathes, stakes, flagging, spray paint, etc.) day $30.00 Curator (Drawer & TX Archaeological Research Lab for artifacts & report) per project $2,100.00 Newspaper Advertisement per publication $2,500.00 Court Reporter page $4.00 Court Reporter (Public Meetings, Hearings & Transcription) day $500.00 2,500 in miscellaneous other direct expenses may be approved by the State's Project Manager over the life of this contract including prime provider and subproviders. For Lump Sum - This statement does not apply. DocuSign Envelope ID: 92042E15BFA78C97-24A81D45-47154148-A6689A63-00F8B487D7CE Translator (English to Spanish, other language as appropriate, or Sign Language) for Public Involvement event $400.00 Translator (English to Spanish, other language as appropriate, or Sign Language) hour $100.00 Custodian for Public Involvement hour/custodian $30.00 Sound Technician for Public Involvement event $250.00 Public Involvement Facility Rental (estimate) 4 hours $750.00 Public involvement Facility Rental (estimate) 8 hours $3,000.00 Public Involvement Facility Rental (estimate) hour $150.00 Public Involvement Facility Rental event $800.00 Audio - Equipment Rental each $300.00 Audio - Visual Equipment Rental event $250.00 Public Notices - Mass Mailing (500 pieces) per mailing $500.00 FEMA FIS (Manual) each $5.00 FEMA FIS Backup Data Request each $300.00 FEMA Map Revision Submittal (CLOMR/LOMR) (Submittal Fee Only) each $5,000.00 FEMA Model/Floodplain Hardcopy each $250.00 Railroad - Flagger (Service provided by RR) hour $60.00 Railroad - Insurance in addition to STD Minimum Required (Minimum coverage of $1 Million required by RR.) each $3,500.00 Railroad - Permit [Note639ABCB9BFF8 DocuSign Envelope ID: Read and then delete this note. Most railroad companies charge a fee of $500 for the permit to access their property.] each $1,500.00 Railroad - Safety Training (If required - Heavy Rail Safety Training Certificate, includes classroom training and employee certification card.) Per Person $150.00 Traffic Control Services, Arrow Boards and Attenuator trucks - Large Project (Includes labor, equipment and fuel) day $2,800.00 Traffic Control Services, Arrow Boards and Attenuator trucks - Medium Project (Includes labor, equipment and fuel) day $2,000.00 Traffic Control Services, Arrow Boards and Attenuator trucks - Small Project (Includes labor, equipment and fuel) day $1,450.00 Attenuator trucks - (LanBFA78C97-1D45-4148-9A63-639ABCB9BFF8 DocuSign Envelope ID: BFA78C97-1D45-4148-9A63-639ABCB9BFF8 DocuSign Envelope ID: BFA78C97-1D45-4148-9A63-639ABCB9BFF8

Appears in 1 contract

Sources: Contract for Engineering Services

Range of Cost Plus Fixed Fee. Actual wages must be within the allowable range shown on the Final Cost Proposal. DocuSign Envelope ID: 92042E159C29D357-24A8A396-47154277-A6688A61-00F8B487D7CE 569291D02A32 * The MAXIMUM AMOUNT PAYABLE is $4,567,940.05 The maximum amount payable is based on the following data and calculations: 5,000,000.00. * The maximum Maximum amount payable must be based on the contract scopenegotiated for each work authorization. The work authorization fee schedules will be derived from this attachment. Principal 20+ $75.00 $237.91 Senior Project Manager 20+ $75.00 74.70 $237.91 Project Manager 10 to 20 $62.00 $196.68 212.82 Quality Manager 10 to 20 $61.00 63.00 $193.50 179.49 Senior Engineer 15+ $55.00 60.00 $174.47 170.94 Project Engineer 10 to 15 $46.00 47.00 $145.92 133.90 Design Engineer 5 to 10 $40.00 41.00 $126.89 Engineer-In-Training 1 116.81 Traffic Engineer 5 to 10 $45.00 $128.21 Senior Hydrologist 15+ $60.00 $170.94 Hydrologist 5 to 15 $33.00 48.00 $104.68 136.75 Senior Engineer Tech 15+ $37.00 $117.37 105.41 Engineer Tech 5 to 15 $30.00 $95.17 85.47 Junior Engineer Tech 1 to 5 $22.00 $69.79 62.68 Senior CADD Operator 15+ $33.00 34.00 $104.68 96.87 CADD Operator 5 to 15 $25.00 30.00 $79.30 85.47 Junior CADD Operator 1 to 5 $21.00 24.00 $66.62 68.38 Senior Utilities Coordinator 10 to 15 $45.00 $128.21 Utilities Coordinator 5 to 10 $37.00 $105.41 Senior Utilities Field Inspector 10 to 15 $35.00 $99.72 Utilities Field Inspector 5 to 10 $30.00 $85.47 Senior Public Involvement Specialist 15+ $50.00 $142.45 Scheduler IV 15+ $52.00 $148.15 Admin/Clerical $21.00 22.50 $66.62 64.10 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E159C29D357-24A8A396-47154277-A6688A61-00F8B487D7CE 569291D02A32 Senior Project Manager 20+ $70.00 78.00 $224.83 213.73 Project Manager 10 to 20 $73.00 $200.03 Quality Manager 10 to 20 $67.00 $183.59 Senior Engineer 15+ $59.00 68.00 $189.50 186.33 Senior Structural Engineer 15+ $71.00 $194.55 Structural Engineer 5 to 15 $61.50 $168.52 Project Engineer 10 to 15 $47.00 51.00 $150.96 139.75 Design Engineer 5 to 10 $39.00 45.00 $125.26 123.30 Traffic Engineer 5 to 10 $48.00 58.00 $154.17 158.93 Traffic Engineer- Modeler/Analyst 5 to 10 $37.00 44.50 $118.84 121.93 Engineer-In-Training 1 to 5 $34.00 36.00 $109.20 98.64 Senior Hydrologist 15+ $66.00 $180.85 Hydrologist 5 to 15 $50.00 $137.01 Senior Engineer Tech 15+ $35.00 38.00 $112.42 104.12 Engineer Tech 5 to 15 $27.00 30.00 $86.72 Junior Engineer Tech 1 to 5 $18.56 $59.61 82.20 Senior CADD Operator 15+ $27.00 36.00 $86.72 98.64 CADD Operator 5 to 15 $22.50 31.00 $72.27 Junior CADD Operator 1 to 5 $19.00 $61.03 84.94 Senior Traffic Tech Public Involvement Officer 15+ $30.00 58.00 $96.36 Traffic Tech 158.93 Public Involvement Officer 5 to 15 $25.00 50.00 $80.30 137.01 Senior Public Involvement Specialist 15+ $49.00 $134.26 Public Involvement Specialist 5 to 15 $37.00 $101.38 Admin/Clerical $15.00 24.00 $48.18 Sr. Travel Demand Modeler 15+ $54.00 $173.44 Sr Project Analyst 10+ $37.00 $118.84 Project Coordinator $30.00 $96.36 65.76 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E159C29D357-24A8A396-47154277-A6688A61-00F8B487D7CE Principal 20+ $75.70 $183.19 569291D02A32 Senior Project Manager 20+ $69.75 68.00 $168.80 Project Manager 10 to 20 $62.00 $150.04 195.65 Quality Manager 10 to 20 $58.50 58.00 $141.57 166.88 Senior Structural Engineer 15+ $65.00 $187.02 Structural Engineer 5 to 15 $54.00 $155.37 Engineer-In-Training 1 to 5 $33.00 $94.95 Senior CADD Operator 15+ $28.00 32.00 $67.76 92.07 CADD Operator 5 to 15 $25.00 28.00 $60.50 Junior CADD Operator 1 to 5 $20.00 $48.40 Senior Geologist 15+ $39.00 $94.38 Geologist 5 to 15 $30.00 $72.60 Senior Environmental Planner 15+ $55.00 $133.10 Environmental Planner IV 10 to 15 $45.50 $110.11 Environmental Planner III 5 to 10 $40.00 $96.80 Environmental Planner I/II 1 to 5 $30.50 $73.81 Senior Environmental Specialist 15+ $45.00 $108.90 Environmental Specialist 5 to 15 $30.50 $73.81 Junior Environmental Specialist 1 to 5 $26.00 $62.92 Senior Environmental Scientist 15+ $49.50 $119.79 Environmental Scientist IV 10 to 15 $42.00 $101.64 Environmental Scientist III 5 to 10 $34.00 $82.28 Environmental Scientist I/II 1 to 5 $29.00 $70.18 Senior Biologist 15+ $40.00 $96.80 Biologist IV 10 to 15 $33.00 $79.86 Biologist III 5 to 10 $30.00 $72.60 Biologist I/II 1 to 5 $28.50 $68.97 Senior Archeologist-Principal Investigator 15+ $41.00 $99.22 Archeologist IV 10 to 15 $35.00 $84.70 Archeologist III 5 to 10 $31.00 $75.02 Archeologist I/II 1 to 5 $27.00 $65.34 Senior Field Tech (Envrionmental, Biological, Archeological) 15+ $22.00 $53.24 Field Tech (Envrionmental, Biological, Archeological) 5 to 15 $17.00 $41.14 Senior Historian 15+ $32.00 $77.44 Historian IV 10 to 15 $30.20 $73.08 Historian III 5 to 10 $29.50 $71.39 Historian I/II 1 to 5 $27.00 $65.34 Senior Public Involvement Officer 15+ $42.00 $101.64 Public Involvement Officer 5 to 15 $35.00 $84.70 Senior Public Involvement Specialist 15+ $43.50 $105.27 Public Involvement Specialist 5 to 15 $33.00 $79.86 Junior Public Involvement Specialist 1 to 5 $24.50 $59.29 Senior Transportation Planner 15+ $35.00 $84.70 Transportation Planner IV 10 to 15 $32.75 $79.26 Transportation Planner III 5 to 10 $29.00 $70.18 Transportation Planner I/II 1 to 5 $20.00 $48.40 Senior Urban Planner 15+ $44.50 $107.69 Urban Planner IV 10 to 15 $39.00 $94.38 Urban Planner III 5 to 10 $33.50 $81.07 Urban Planner I/II 1 to 5 $31.00 $75.02 Environmental Inspector 5+ $32.00 $77.44 80.56 Admin/Clerical $18.00 $43.56 51.79 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E159C29D357-24A8A396-47154277-A6688A61-00F8B487D7CE Principal 20+ 569291D02A32 Project Manager 10 to 20 $67.00 55.00 $180.57 167.89 Senior Public Involvement Officer Engineer 15+ $49.12 50.00 $132.38 Public Involvement Officer 152.63 Project Engineer 10 to 15 $40.00 $122.10 Design Engineer 5 to 10 $34.00 $103.79 Engineer-In-Training 1 to 5 $31.00 $94.63 Senior Engineer Tech 15+ $31.00 $94.63 Engineer Tech 5 to 15 $35.00 25.00 $94.33 76.31 Junior Engineer Tech 1 to 5 $18.00 $54.95 Senior Public Involvement Specialist Geologist 15+ $41.66 38.00 $112.27 Public Involvement Specialist 116.00 Geologist 5 to 15 $33.48 32.00 $90.23 Junior Public Involvement Specialist 97.68 Geologist-In-Training 1 to 5 $22.00 31.00 $59.29 94.63 Admin/Clerical $20.00 $53.90 Engineer Tech $28.00 $75.46 61.05 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E159C29D357-24A8A396-47154277-A6688A61-00F8B487D7CE 569291D02A32 RPLS - Project Manager 15+ $52.00 55.00 $141.24 149.06 RPLS - Task Leader 10 to 15 $43.50 50.00 $118.16 135.51 Senior Survey Tech (Must be Surveyor in Training (SIT), or ha have a minimum of five year's surveying experience) 5 to 10 $32.50 35.00 $88.28 94.86 Survey Tech 1 to 5 $29.50 33.50 $80.13 90.79 Senior GIS CADD Operator 15+ $33.00 34.25 $89.64 GIS 92.82 CADD Operator 5 to 15 $29.00 29.75 $78.77 GIS Technician 80.63 Flagger $13.00 $35.23 Abstractor (Property Deed Researcher, Courthouse or Internet research) $27.00 $73.34 73.17 Admin/Clerical $19.44 23.00 $52.80 Project Coordinator - Mobile LiDAR $43.00 $116.80 Mobile LiDAR Processing Technician $33.00 $89.64 Project Coordinator - AM $44.00 $119.51 Certified Photogrammetrist $36.00 $97.78 Analytical Triangulation Specialist $27.00 $73.34 Aerial Mapping Technician $25.06 $68.07 Orthophoto Specialist $24.00 $65.19 Mapping Editor (includes QA/QC, Finishing, & Finalization) $26.25 $71.30 Aerial Office Technician $20.00 $54.32 Project Coordinator - AP $40.75 $110.69 Aerial Processing Technician $29.75 $80.81 Project Coordinator - FWAL $40.50 $110.01 Airborne LiDAR Processing Technician $33.00 $89.64 Project Coordinator - HAL $40.50 $110.01 Helicopter LiDAR Processing Technician $31.50 $85.56 Photo Lab Specialist $20.25 $55.00 Photo Processing Technician $20.25 $55.00 62.33 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E159C29D357-24A8A396-47154277-A6688A61-00F8B487D7CE 569291D02A32 RPLS - Project Manager 15+ $51.50 $150.69 RPLS - Task Leader 10 to 15 $46.00 $134.60 Senior Survey Tech (Must be Surveyor in Training (SIT), or have a minimum of five year's surveying experience) 5 to 10 $34.00 $99.48 Survey Tech 1 to 5 $31.50 $92.17 Flagger $15.00 $43.89 Abstractor (Property Deed Researcher, Courthouse or Internet research) $26.00 $76.08 Admin/Clerical $21.00 $61.45 Senior Utilities Coordinator $51.00 $149.23 Utilities Coordinator $41.00 $119.97 Senior Utilities Field Inspector $35.00 $102.41 Utilities Field Inspector $32.00 $93.63 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 9C29D357-A396-4277-8A61-569291D02A32 1 - Person Survey Crew (GPS and Robotic Total Stations included in indirect cost rate. Mileage not included.) hour $90.00 100.00 2 - Person Survey Crew (GPS and Robotic Total Stations included in indirect cost rate. Mileage not included.) hour $135.00 145.00 3 - Person Survey Crew (GPS and Robotic Total Stations included in indirect cost rate. Mileage not included.) hour $165.00 175.00 4 - Person Survey Crew (GPS and Robotic Total Stations included in indirect cost rate. Mileage not included.) hour $190.00 200.00 LiDAR Mobile Mapping System, (Includes Vehicle Operator, LiDAR Technician mileage on project and fuel) (Does not include travel to project.) day $6,500.00 6,000.00 The unit costs shown include labor, overhead, and profit. Payment based on units completed. No partial payments. All unit costs are negotiated costs and are not subject to change or adjustment. Unit Cost Payment Basis: If unit costs by year are included, unit costs billed should correspond to the fiscal or calendar year, if applicable, in which the work was done. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 9C29D357-A396-4277-8A61-569291D02A32 DocuSign Envelope ID: 9C29D357-A396-4277-8A61-569291D02A32 1 - Person Survey Crew (GPS and Robotic Total Stations included in indirect cost rate. Mileage not included.) hour $110.00 2 - Person Survey Crew (GPS and Robotic Total Stations included in indirect cost rate. Mileage not included.) hour $160.00 3 - Person Survey Crew (GPS and Robotic Total Stations included in indirect cost rate. Mileage not included.) hour $190.00 4 - Person Survey Crew (GPS and Robotic Total Stations included in indirect cost rate. Mileage not included.) hour $204.00 LiDAR Mobile Mapping System, (Includes Vehicle Operator, LiDAR Technician mileage on project and fuel) (Does not include travel to project.) day $8,000.00 Mobilization for Aerial Photography/LiDAR Fixed Wing Aircraft (Includes aircraft, Pilot, Camera/LiDAR Operator, fuel and transportation cost) Per Project mile $18,000.00 21,500.00 Aerial Photography Flight Crew Fixed Wing Aircraft (Includes Pilot and Camera Operator) hour $180.00 185.00 LiDAR Flight Crew Fixed Wing Aircraft (Includes Pilot and LiDAR Operator) hour $190.00 Mobilization for Helicopter Airborne LiDAR (Includes helicopter, Pilot, LiDAR Operator, fuel and transportation cost) Per Project mile $19,000.00 21,500.00 Helicopter Flight Crew Fixed Wing Aircraft (Includes Pilot and LiDAR Operator) hour $190.00 The unit costs shown include labor, overhead, and profit. Payment based on units completed. No partial payments. All unit costs are negotiated costs and are not subject to change or adjustment. Unit Cost Payment Basis: If unit costs by year are included, unit costs billed should correspond to the fiscal or calendar year, if applicable, in which the work was done. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15-24A8-4715-A668-00F8B487D7CE Principal 20+ $76.00 $238.00 Senior Project Manager 20+ $74.00 $231.74 Project Manager 10 to 20 $62.00 $194.16 Quality Manager 10 to 20 $59.00 $184.76 Senior Engineer 15+ $60.00 $187.90 Project Engineer 10 to 15 $46.00 $144.05 Design Engineer 5 to 10 $40.00 $125.26 Engineer-In-Training 1 to 5 $33.00 $103.34 Senior Engineer Tech 15+ $38.00 $119.00 Engineer Tech 5 to 15 $25.00 $78.29 Junior Engineer Tech 1 to 5 $21.00 $65.76 Senior CADD Operator 15+ $33.00 $103.34 CADD Operator 5 to 15 $30.00 $93.95 Junior CADD Operator 1 to 5 $21.00 $65.76 Senior Project Controller 15+ $35.50 $111.17 Project Controller 5 to 15 $30.00 $93.95 Public Involvement Specialist 5 to 15 $30.00 $93.95 Junior Public Involvement Specialist 1 to 5 $22.00 $68.89 Senior Utility Coordinator $47.00 $147.18 Utility Coordinator $36.00 $112.74 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15-24A8-4715-A668-00F8B487D7CE Mobilization/Demobilization mile $4.00 Level C and D. Includes labor and equipment for records research, CADD, and mapping. LF $0.44 Level B (Designation). Includes labor and equipment for records research, designating, engineering, surveying, and CADD. LF $1.30 Level A (Location, Test Holes). Includes labor and equipment for vacuum excavation, engineering, surveying, and CADD. 0 to 5 ft. Volumetric Shrinkage ASTM D427 each $950.00 > 5 to 8 ft. each $1,250.00 > 8 to 13 ft. each $1,550.00 > 13 to 20 ft. each $1,900.00 > 20 ft. VF over 20' $150.00 82.00 Standard ▇▇▇▇▇▇▇ Services One (1) Designating Person with Equipment hour Test ASTM D698 each $120.00 180.00 Modified ▇▇▇▇▇▇▇ Services Two Test ASTM D1557 each $190.00 Standard Penetration Test (2SPT) Designtating Person with Equipment hour ASTM D1586 LF $160.00 25.00 California Bearing Ratio (Single Sample without MD Curve) ASTM D1883 test $225.00 Unconfined Compressive Strength (Soil) ASTM D2166 each $50.00 Hydraulic Conductivity Permeability ASTM D2434 each $255.00 One Dimensional Consolidation Properties of Soil ASTM D2435 each $175.00 Unconfined Compressive Strength (Rock) ASTM D2938 each $75.00 Direct Shear Test of Soils Under Consolidated Drained Conditions ASTM D3080 set of 3 $850.00 Splitting Tensile of Intact Rock Core ASTM D3967 each $125.00 Water Stand Pipes ASTM D4043 LF $35.00 Calcium Carbonate Content of Soils ASTM D4373 each $60.00 Hydraulic Conductivity Permeability ASTM D4511 each $275.00 One Dimensional Swell, Methods A & B ASTM D4546 each $85.00 One Dimensional Swell, Method C ASTM D4546 each $110.00 Permeability of Silt and Clays ASTM D5084 each $325.00 Suction Test (Filter Method) ASTM D5298 each $75.00 ▇▇▇▇▇▇▇▇▇▇ Quality Level B 3D Modeling Equipment SPAR Day Type Piezometers N/A each $700.00 200.00 ▇▇▇▇▇▇▇▇▇▇ Type Piezometers Installation N/A each $300.00 Vibrating Wire Piezometer N/A each $750.00 Vibrating Wire Piezometer Installation N/A each $1,000.00 Soil Boring with SPT ASTM D1586 LF $30.00 Soil Boring/Rock Coring with TCP ( < 60 ft.) Tex-132-E LF $38.00 Soil Boring/Rock Coring with TCP ( > 60 ft.) Tex-132-E LF $40.00 Soil Boring/Rock Coring without TCP ( < 60 ft.) N/A LF $34.00 Soil Boring /Rock Coring without TCP ( > 60 ft.) N/A LF $38.00 Soil Boring without TCP ( < 60 ft.): (a) Utilizing Continuous Sampler ASTM D1587 LF $32.00 (b) Shelby Push Tubes Extruded in Field ASTM D1587 LF $27.00 (c) Augering N/A LF $18.00 Core/drill operator/technician and coring equipment used to drill flexible and rigid pavement (2-man crew) N/A Trip $250.00 (a) 4-in. diameter cores N/A Inch $10.00 (b) 6-in. diameter cores N/A Inch $12.00 Determining Moisture Content in Soil Materials Tex-103-E each $11.00 Determining Liquid Limits of Soils Tex-104-E each $35.00 Determining Plastic Limit of Soils Tex-105-E each $35.00 Bar Linear Shrinkage of Fine Aggregate Tex-107-E each $28.00 Determining the Specific Gravity of Soils Tex-108-E each $32.00 Particle Size Analysis of Soils (Parts I & II) Tex-110-E each $47.00 Determining the Amount of Material in Soils Finer than the 75µm (No. 200) Sieve Tex-111-E each $30.00 Laboratory Compaction Characteristics and Moisture-Density Relationship of Base Materials Tex-113-E each $150.00 Laboratory Compaction Characteristics and Moisture-Density Relationship of Subgrade, Embankment Soils and Backfill Materials Tex-114-E each $145.00 Ball Mill Method for Determining In-Place Density of Soils and Base Materials Tex-116-E each $145.00 Triaxial Compression for Disturbed Soils and Base Materials Tex-117-E each $1,550.00 DocuSign Envelope ID: 9C29D357-A396-4277-8A61-569291D02A32 Soil-Cement Testing Tex-120-E each $235.00 Soil-Lime Testing (4 points) Tex-121-E each $245.00 Determining Soil pH Tex-128-E each $17.00 Measuring the Resistivity of Soil Materials Tex-129-E each $50.00 Slurry Testing Tex-130-E each $27.00 Texas Cone Penetration Tex-132-E each $18.00 Non-Destructive Deflection Testing Dynaflect day $2,000.00 Falling Weight Deflection (FWD) day $2,300.00 Heavy Weight Deflection (HWD) day $2,600.00 The unit costs shown include labor, overhead, and profit. Payment based on units completed. No partial payments. All unit costs are negotiated costs and are not subject to change or adjustment. Unit Cost Payment Basis: If unit costs by year are included, unit costs billed should correspond to the fiscal or calendar year, if applicable, in which the work was done. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E159C29D357-24A8A396-47154277-A6688A61-00F8B487D7CE Lodging569291D02A32 Mobilization/Hotel - Taxes Demobilization mile $4.50 Level C and Fees day/person D. Includes labor and equipment for records research, CADD, and mapping. LF $25.00 Lodging/Hotel 0.75 Level B (Taxes/fees not included) day/person Current State Rate Meals Designation). Includes labor and equipment for records research, designating, engineering, surveying, and CADD. LF $1.60 Level A (Excluding alcohol & tips) (Overnight stay required) day/person Current State Rate Mileage mile Current State Rate SUV or ATV Rental (Location, Test Holes). Includes taxes labor and fees; Insurance costs will not be reimbursed) day $110.00 Rental Car Fuel gallon $3.75 Rental Car (Includes taxes equipment for vacuum excavation, engineering, surveying, and fees; Insurance costs will not be reimbursed) day $52.00 Air Travel - In State - Short Notice (Coach) Rd Trip/person $350.00 Air Travel - In State - 2+ Wks Notice (Coach) Rd Trip/person Coach Fare $300.00 Air Travel - Out of State - 2+ Wks Notice (Coach) Rd Trip/person $450.00 Air Travel - Out of State - Short Notice (Coach) Rd Trip/person $650.00 Taxi/Cab fare each/person $29.00 Parking day $15.00 Toll Charges CADD. 0 to 5 ft. each $3.00 Standard Postage letter Current Postal Rate Certified Letter Return Receipt each Current Postal Rate Overnight Mail - letter size each Current Postal Rate Overnight Mail - oversized box 1,085.00 > 5 to 8 ft. each $30.00 Courier Services 1,485.00 > 8 to 13 ft. each $25.00 Photocopies B/W (11" X 17") 1,800.00 > 13 to 20 ft. each $0.20 Photocopies B/W (8 1/2" X 11") each $0.12 Photocopies Color (11" X 17") each $0.75 Photocopies Color (8 1/2" X 11") each $0.45 Digital Ortho Plotting sheet $1.40 Plots (B/W on Bond) per sq. ft. $0.50 Plots (Color on Bond) per sq. ft. $1.05 Plots (Color on Photographic Paper) per sq. ft. $4.00 Color Graphics on Foam Board square foot $4.00 Presentation Boards 30" X 40" Color Mounted each $80.00 Report Printing each $35.00 Report Binding and tabbing each $4.50 Reproduction of CD/DVD each $3.00 CDs each $1.00 4" X 6" Digital Color Print picture $0.25 Tx Parks & Wildlife Data Request Fees each $50.00 Hazardous Materials Database Search per search $300.00 Noise Meter Rental per project $57.00 Environmental Field Supplies (lathes, stakes, flagging, spray paint, etc.) day $30.00 Curator (Drawer & TX Archaeological Research Lab for artifacts & report) per project $2,100.00 Newspaper Advertisement per publication $2,500.00 Court Reporter page $4.00 Court Reporter (Public Meetings, Hearings & Transcription) day $500.00 DocuSign Envelope ID: 92042E15-24A8-4715-A668-00F8B487D7CE Translator (English to Spanish, other language as appropriate, or Sign Language) for Public Involvement event $400.00 Translator (English to Spanish, other language as appropriate, or Sign Language) hour $100.00 Custodian for Public Involvement hour/custodian $30.00 Sound Technician for Public Involvement event $250.00 Public Involvement Facility Rental (estimate) 4 hours $750.00 Public involvement Facility Rental (estimate) 8 hours $3,000.00 Public Involvement Facility Rental (estimate) hour $150.00 Public Involvement Facility Rental event $800.00 Audio - Equipment Rental each $300.00 Audio - Visual Equipment Rental event $250.00 Public Notices - Mass Mailing (500 pieces) per mailing $500.00 FEMA FIS (Manual) each $5.00 FEMA FIS Backup Data Request each $300.00 FEMA Map Revision Submittal (CLOMR/LOMR) (Submittal Fee Only) each $5,000.00 FEMA Model/Floodplain Hardcopy each $250.00 Railroad - Flagger (Service provided by RR) hour $60.00 Railroad - Insurance in addition to STD Minimum Required (Minimum coverage of $1 Million required by RR.) each $3,500.00 Railroad - Permit [Note: Read and then delete this note. Most railroad companies charge a fee of $500 for the permit to access their property.] each $1,500.00 Railroad - Safety Training (If required - Heavy Rail Safety Training Certificate, includes classroom training and employee certification card.) Per Person $150.00 Traffic Control Services, Arrow Boards and Attenuator trucks - Large Project (Includes labor, equipment and fuel) day $2,800.00 Traffic Control Services, Arrow Boards and Attenuator trucks - Medium Project (Includes labor, equipment and fuel) day $2,000.00 Traffic Control Services, Arrow Boards and Attenuator trucks - Small Project (Includes labor, equipment and fuel) day $1,450.00 Attenuator trucks - (Lan2,350.00

Appears in 1 contract

Sources: Contract for Engineering Services

Range of Cost Plus Fixed Fee. Actual wages must be within the allowable range shown on the Final Cost Proposal. DocuSign Envelope ID: 92042E15487DF4F5-24A8443A-402D-88BD-4715-A668-00F8B487D7CE EC5BD0BE2A0F * The MAXIMUM AMOUNT PAYABLE is $4,567,940.05 The maximum amount payable is based on the following data and calculations: 5,000,000.00. * The maximum Maximum amount payable must be based on the contract scopenegotiated for each work authorization. The work authorization fee schedules will be derived from this attachment. Principal Project Manager 10 to 20+ $75.00 74.00 $237.91 Senior Project Manager 20+ $75.00 $237.91 Project 214.96 Quality Manager 10 to 20 $62.00 $196.68 180.10 Senior Engineer 15+ $58.00 $168.48 Senior Structural Engineer 15+ $68.00 $197.53 Structural Engineer 5 to 15 $60.00 $174.29 Project Engineer 10 to 15 $51.50 $149.60 Design Engineer 5 to 10 $42.00 $122.00 Engineer-In-Training 1 to 5 $31.60 $91.79 Senior Hydrologist 15+ $57.70 $167.61 Hydrologist 5 to 15 $42.00 $122.00 Senior Engineer Tech 15+ $38.92 $113.06 Engineer Tech 5 to 15 $26.00 $75.53 Junior Engineer Tech 1 to 5 $18.00 $52.29 Senior CADD Operator 15+ $30.56 $88.77 CADD Operator 5 to 15 $27.60 $80.17 Junior CADD Operator 1 to 5 $23.89 $69.40 Records Keeper $35.31 $102.57 Admin/Clerical $23.00 $66.81 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 487DF4F5-443A-402D-88BD-EC5BD0BE2A0F Project Manager 10 to 20+ $67.50 $210.15 Quality Manager 10 to 20 $61.00 62.00 $193.50 193.03 Senior Engineer 15+ $55.00 $174.47 171.23 Senior Structural Engineer 15+ $64.00 $199.25 Structural Engineer 5 to 15 $53.00 $165.01 Project Engineer 10 to 15 $49.00 $152.55 Design Engineer 5 to 10 $39.00 $121.42 Engineer-In-Training 1 to 5 $31.50 $98.07 Senior Engineer Tech 15+ $36.00 $112.08 Engineer Tech 5 to 15 $27.00 $84.06 Junior Engineer Tech 1 to 5 $20.00 $62.27 Senior CADD Operator 15+ $31.00 $96.51 CADD Operator 5 to 15 $25.00 $77.83 Junior CADD Operator 1 to 5 $22.00 $68.49 Admin/Clerical $21.00 $65.38 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 487DF4F5-443A-402D-88BD-EC5BD0BE2A0F RPLS - Project Manager 15+ $57.70 $178.80 Licensed State Land Surveyor 10+ $55.00 $170.43 RPLS - Task Leader 10 to 15 $48.06 $148.93 Senior Survey Tech (Must be Surveyor in Training (SIT), or have a minimum of five year's surveying experience) 5 to 10 $35.10 $108.77 Survey Tech 1 to 5 $30.80 $95.44 Senior GIS Operator $34.60 $107.22 GIS Operator $27.50 $85.22 GIS Technician $26.36 $81.68 Flagger $16.00 $49.58 Abstractor (Property Deed Researcher, Courthouse or Internet research) $29.00 $89.87 Admin/Clerical $26.40 $81.81 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 487DF4F5-443A-402D-88BD-EC5BD0BE2A0F Admin/Clerical $24.00 $65.26 Project Coordinator - AM $46.00 $145.92 125.07 Certified Photogrammetrist $38.90 $105.77 Analytical Triangulation Specialist $31.00 $84.29 Aerial Mapping Technician $28.00 $76.13 Orthophoto Specialist $30.00 $81.57 Mapping Editor (includes QA/QC, Finishing, & Finalization) $28.00 $76.13 Aerial Office Technician $18.00 $48.94 Project Coordinator - AP $41.00 $111.48 Aerial Processing Technician $31.00 $84.29 Project Coordinator - FWAL $39.50 $107.40 Airborne LiDAR Processing Technician $36.00 $97.88 Project Coordinator - ▇▇▇ $39.00 $106.04 Helicopter LiDAR Processing Technician $31.00 $84.29 Photo Lab Specialist $18.00 $48.94 Photo Processing Technician $18.00 $48.94 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 487DF4F5-443A-402D-88BD-EC5BD0BE2A0F Project Manager 10 to 20+ $73.00 $203.54 Quality Manager 10 to 20 $63.00 $175.65 Senior Engineer 15+ $64.00 $178.44 Senior Structural Engineer 15+ $67.00 $186.81 Structural Engineer 5 to 15 $58.00 $161.71 Project Engineer 10 to 15 $50.00 $139.41 Design Engineer 5 to 10 $44.00 $122.68 Engineer-In-Training 1 to 5 $34.00 $94.80 Senior Hydrologist 15+ $60.00 $167.29 Hydrologist 5 to 15 $55.00 $153.35 Senior Engineer Tech 15+ $37.00 $103.16 Engineer Tech 5 to 15 $28.00 $78.07 Senior CADD Operator 15+ $34.00 $94.80 Utilities Coordinator $42.00 $117.10 Senior Traffic Tech 15+ $23.00 $64.13 Admin/Clerical $22.00 $61.34 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 487DF4F5-443A-402D-88BD-EC5BD0BE2A0F Project Manager 10 to 20+ $67.00 $209.96 Quality Manager 10 to 20 $62.00 $194.29 Senior Engineer 15+ $60.00 $188.02 Senior Structural Engineer 15+ $64.00 $200.56 Structural Engineer 5 to 15 $51.00 $159.82 Project Engineer 10 to 15 $48.00 $150.42 Design Engineer 5 to 10 $41.00 $128.48 Engineer-In-Training 1 to 5 $32.00 $100.28 Senior Hydrologist 15+ $56.00 $175.49 Hydrologist 5 to 15 $41.00 $128.48 Senior Engineer Tech 15+ $35.50 $111.25 Engineer Tech 5 to 15 $31.00 $97.14 Senior CADD Operator 15+ $33.00 $103.41 CADD Operator 5 to 15 $26.00 $81.48 Senior Utilities Coordinator $50.00 $156.68 Utilities Coordinator $42.00 $131.61 Senior Utlilities Field Inspector $34.00 $106.55 Utilities Field Inspector $27.00 $84.61 Senior Project Controller 15+ $37.00 $115.95 Project Controller 5 to 15 $30.00 $94.01 Senior Public Involvement Officer 15+ $48.00 $150.42 Public Involvement Officer 5 to 15 $41.00 $128.48 Senior Public Involvement Specialist 15+ $38.00 $119.08 Public Involvement Specialist 5 to 15 $30.00 $94.01 Licensed State Land Surveyor 10+ $52.00 $162.95 RPLS - Task Leader 10 to 15 $46.00 $144.15 Senior Survey Tech (Must be Surveyor in Training (SIT), or hav 5 to 10 $35.50 $111.25 Survey Tech 1 to 5 $31.00 $97.14 Senior GIS Operator $38.00 $119.08 GIS Operator $31.00 $97.14 GIS Technician $27.00 $84.61 Flagger $14.00 $43.87 Abstractor (Property Deed Researcher, Courthouse or Internet r $23.00 $72.07 Admin/Clerical $22.00 $68.94 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 487DF4F5-443A-402D-88BD-EC5BD0BE2A0F Project Manager 10 to 20+ $65.00 $192.14 Senior Engineer 15+ $62.50 $184.75 Project Engineer 10 to 15 $52.00 $153.71 Field Engineer 5 to 10 $41.00 $121.20 Design Engineer 5 to 10 $40.00 $126.89 118.24 Engineer-In-Training 1 to 5 $33.00 $104.68 97.55 Senior Engineer Tech 15+ $37.00 33.00 $117.37 97.55 Engineer Tech 5 to 15 $30.00 28.00 $95.17 82.77 Junior Engineer Tech 1 to 5 $22.00 20.00 $69.79 59.12 Senior CADD Operator 15+ $33.00 31.00 $104.68 91.64 CADD Operator 5 to 15 $25.00 28.00 $79.30 82.77 Junior CADD Operator 1 to 5 $21.00 20.00 $66.62 59.12 Senior Geologist 15+ $45.00 $133.02 Geologist 5 to 15 $36.00 $106.42 Geologist-In-Training 1 to 5 $28.00 $82.77 Engineer Tech: TX APA HMA Level 1-A Cert $29.00 $85.72 Engineer Tech: TX APA HMA Level 1-B Cert $29.00 $85.72 Engineer Tech: TX APA HMA Level 2 Cert $31.00 $91.64 Engineer Tech: TX APA SB 101 Cert $26.00 $76.86 Engineer Tech: TX APA SB 102 Cert $26.00 $76.86 Engineer Tech: TX APA SB 103 Cert $26.00 $76.86 Engineer Tech: TX APA SB 201 Cert $31.00 $91.64 Engineer Tech: TX APA SB 202 Cert $31.00 $91.64 Engineer Tech: ACI Field Testing Grade 1 Cert $22.00 $65.03 Engineer Tech: ACI Concrete Strength Testing Cert $26.00 $76.86 Engineer Tech: ACI Concrete Lab Testing Level 1 Cert $31.00 $91.64 Field Tech: Collect Samples at Field and TxDOT Labs $22.00 $65.03 Field Tech: Collect Haul Tickets $26.00 $76.86 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 487DF4F5-443A-402D-88BD-EC5BD0BE2A0F Project Manager 10 to 20+ $75.00 $199.86 Quality Manager 10 to 20 $67.00 $178.54 Senior Engineer 15+ $67.00 $178.54 Senior Structural Engineer 15+ $68.00 $181.20 Structural Engineer 5 to 15 $58.00 $154.56 Project Engineer 10 to 15 $52.00 $138.57 Design Engineer 5 to 10 $43.00 $114.58 Traffic Engineer 5 to 10 $49.00 $130.57 Traffic Engineer- Modeler/Analyst 5 to 10 $39.00 $103.93 Engineer-In-Training 1 to 5 $34.00 $90.60 Senior Hydrologist 15+ $60.00 $159.89 Senior Engineer Tech 15+ $38.00 $101.26 Engineer Tech 5 to 15 $31.00 $82.61 Admin/Clerical $21.00 25.00 $66.62 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15487DF4F5-24A8443A-402D-88BD-4715-A668-00F8B487D7CE Senior EC5BD0BE2A0F Project Manager 10 to 20+ $70.00 67.00 $224.83 217.29 Quality Manager 10 to 20 $62.25 $201.88 Senior Engineer 15+ $59.00 60.00 $189.50 194.59 Senior Structural Engineer 15+ $60.00 $194.59 Structural Engineer 5 to 15 $56.00 $181.62 Project Engineer 10 to 15 $47.00 50.00 $150.96 162.16 Design Engineer 5 to 10 $39.00 42.00 $125.26 136.21 Traffic Engineer 5 to 10 $48.00 50.00 $154.17 162.16 Traffic Engineer- Modeler/Analyst 5 to 10 $37.00 45.00 $118.84 145.94 Engineer-In-Training 1 to 5 $34.00 33.00 $109.20 107.02 Senior Engineer Tech 15+ $35.00 37.00 $112.42 120.00 Engineer Tech 5 to 15 $27.00 30.00 $86.72 97.29 Junior Engineer Tech 1 to 5 $18.56 18.00 $59.61 58.38 Senior CADD Operator 15+ $27.00 35.00 $86.72 113.51 CADD Operator 5 to 15 $22.50 27.00 $72.27 87.56 Junior CADD Operator 1 to 5 $19.00 $61.03 61.62 Senior Traffic Tech Utilities Coordinator $50.00 $162.16 Utilities Coordinator $38.00 $123.24 Senior Project Controller 15+ $30.00 45.00 $96.36 Traffic Tech 145.94 Project Controller 5 to 15 $25.00 35.00 $80.30 113.51 Admin/Clerical $15.00 23.00 $48.18 Sr. Travel Demand Modeler 15+ $54.00 $173.44 Sr Project Analyst 10+ $37.00 $118.84 Project Coordinator $30.00 $96.36 74.59 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15487DF4F5-24A8443A-402D-88BD-4715-A668-00F8B487D7CE Principal 20+ $75.70 $183.19 Senior Project Manager 20+ $69.75 $168.80 Project Manager 10 to 20 $62.00 $150.04 Quality Manager 10 to 20 $58.50 $141.57 Senior CADD Operator 15+ $28.00 $67.76 CADD Operator 5 to 15 $25.00 $60.50 Junior CADD Operator 1 to 5 $20.00 $48.40 Senior Geologist 15+ $39.00 $94.38 Geologist 5 to 15 $30.00 $72.60 Senior Environmental Planner 15+ $55.00 $133.10 Environmental Planner IV 10 to 15 $45.50 $110.11 Environmental Planner III 5 to 10 $40.00 $96.80 Environmental Planner I/II 1 to 5 $30.50 $73.81 Senior Environmental Specialist 15+ $45.00 $108.90 Environmental Specialist 5 to 15 $30.50 $73.81 Junior Environmental Specialist 1 to 5 $26.00 $62.92 Senior Environmental Scientist 15+ $49.50 $119.79 Environmental Scientist IV 10 to 15 $42.00 $101.64 Environmental Scientist III 5 to 10 $34.00 $82.28 Environmental Scientist I/II 1 to 5 $29.00 $70.18 Senior Biologist 15+ $40.00 $96.80 Biologist IV 10 to 15 $33.00 $79.86 Biologist III 5 to 10 $30.00 $72.60 Biologist I/II 1 to 5 $28.50 $68.97 Senior Archeologist-Principal Investigator 15+ $41.00 $99.22 Archeologist IV 10 to 15 $35.00 $84.70 Archeologist III 5 to 10 $31.00 $75.02 Archeologist I/II 1 to 5 $27.00 $65.34 Senior Field Tech (Envrionmental, Biological, Archeological) 15+ $22.00 $53.24 Field Tech (Envrionmental, Biological, Archeological) 5 to 15 $17.00 $41.14 Senior Historian 15+ $32.00 $77.44 Historian IV 10 to 15 $30.20 $73.08 Historian III 5 to 10 $29.50 $71.39 Historian I/II 1 to 5 $27.00 $65.34 Senior Public Involvement Officer 15+ $42.00 $101.64 Public Involvement Officer 5 to 15 $35.00 $84.70 Senior Public Involvement Specialist 15+ $43.50 $105.27 Public Involvement Specialist 5 to 15 $33.00 $79.86 Junior Public Involvement Specialist 1 to 5 $24.50 $59.29 Senior Transportation Planner 15+ $35.00 $84.70 Transportation Planner IV 10 to 15 $32.75 $79.26 Transportation Planner III 5 to 10 $29.00 $70.18 Transportation Planner I/II 1 to 5 $20.00 $48.40 Senior Urban Planner 15+ $44.50 $107.69 Urban Planner IV 10 to 15 $39.00 $94.38 Urban Planner III 5 to 10 $33.50 $81.07 Urban Planner I/II 1 to 5 $31.00 $75.02 Environmental Inspector 5+ $32.00 $77.44 Admin/Clerical $18.00 $43.56 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15-24A8-4715-A668-00F8B487D7CE Principal 20+ $67.00 $180.57 Senior Public Involvement Officer 15+ $49.12 $132.38 Public Involvement Officer 5 to 15 $35.00 $94.33 Senior Public Involvement Specialist 15+ $41.66 $112.27 Public Involvement Specialist 5 to 15 $33.48 $90.23 Junior Public Involvement Specialist 1 to 5 $22.00 $59.29 Admin/Clerical $20.00 $53.90 Engineer Tech $28.00 $75.46 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15-24A8-4715-A668-00F8B487D7CE RPLS - Project Manager 15+ $52.00 $141.24 RPLS - Task Leader 10 to 15 $43.50 $118.16 Senior Survey Tech (Must be Surveyor in Training (SIT), or ha 5 to 10 $32.50 $88.28 Survey Tech 1 to 5 $29.50 $80.13 Senior GIS Operator $33.00 $89.64 GIS Operator $29.00 $78.77 GIS Technician $27.00 $73.34 Admin/Clerical $19.44 $52.80 Project Coordinator - Mobile LiDAR $43.00 $116.80 Mobile LiDAR Processing Technician $33.00 $89.64 Project Coordinator - AM $44.00 $119.51 Certified Photogrammetrist $36.00 $97.78 Analytical Triangulation Specialist $27.00 $73.34 Aerial Mapping Technician $25.06 $68.07 Orthophoto Specialist $24.00 $65.19 Mapping Editor (includes QA/QC, Finishing, & Finalization) $26.25 $71.30 Aerial Office Technician $20.00 $54.32 Project Coordinator - AP $40.75 $110.69 Aerial Processing Technician $29.75 $80.81 Project Coordinator - FWAL $40.50 $110.01 Airborne LiDAR Processing Technician $33.00 $89.64 Project Coordinator - HAL $40.50 $110.01 Helicopter LiDAR Processing Technician $31.50 $85.56 Photo Lab Specialist $20.25 $55.00 Photo Processing Technician $20.25 $55.00 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15-24A8-4715-A668-00F8B487D7CE EC5BD0BE2A0F 1 - Person Survey Crew (GPS and Robotic Total Stations included in indirect cost rate. Mileage not included.) hour $90.00 110.00 2 - Person Survey Crew (GPS and Robotic Total Stations included in indirect cost rate. Mileage not included.) hour $135.00 150.00 3 - Person Survey Crew (GPS and Robotic Total Stations included in indirect cost rate. Mileage not included.) hour $165.00 180.00 4 - Person Survey Crew (GPS and Robotic Total Stations included in indirect cost rate. Mileage not included.) hour $190.00 210.00 LiDAR Mobile Mapping System, (Includes Vehicle Operator, LiDAR Technician mileage on project and fuel) (Does not include travel to project.) day $6,500.00 Mobilization for Aerial Photography/LiDAR Fixed Wing Aircraft (Includes aircraft, Pilot, Camera/LiDAR Operator, fuel and transportation cost) Per Project $18,000.00 Aerial Photography Flight Crew Fixed Wing Aircraft (Includes Pilot and Camera Operator) hour $180.00 LiDAR Flight Crew Fixed Wing Aircraft (Includes Pilot and LiDAR Operator) hour $190.00 Mobilization for Helicopter Airborne LiDAR (Includes helicopter, Pilot, LiDAR Operator, fuel and transportation cost) Per Project $19,000.00 Helicopter Flight Crew Fixed Wing Aircraft (Includes Pilot and LiDAR Operator) hour $190.00 8,000.00 The unit costs shown include labor, overhead, and profit. Payment based on units completed. No partial payments. All unit costs are negotiated costs and are not subject to change or adjustment. Unit Cost Payment Basis: If unit costs by year are included, unit costs billed should correspond to the fiscal or calendar year, if applicable, in which the work was done. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15487DF4F5-24A8443A-402D-88BD-4715-A668-00F8B487D7CE Principal 20+ $76.00 $238.00 Senior Project Manager 20+ $74.00 $231.74 Project Manager 10 to 20 $62.00 $194.16 Quality Manager 10 to 20 $59.00 $184.76 Senior Engineer 15+ $60.00 $187.90 Project Engineer 10 to 15 $46.00 $144.05 Design Engineer 5 to 10 $40.00 $125.26 Engineer-In-Training EC5BD0BE2A0F 1 to 5 $33.00 $103.34 Senior Engineer Tech 15+ $38.00 $119.00 Engineer Tech 5 to 15 $25.00 $78.29 Junior Engineer Tech 1 to 5 $21.00 $65.76 Senior CADD Operator 15+ $33.00 $103.34 CADD Operator 5 to 15 $30.00 $93.95 Junior CADD Operator 1 to 5 $21.00 $65.76 Senior Project Controller 15+ $35.50 $111.17 Project Controller 5 to 15 $30.00 $93.95 Public Involvement Specialist 5 to 15 $30.00 $93.95 Junior Public Involvement Specialist 1 to 5 $22.00 $68.89 Senior Utility Coordinator $47.00 $147.18 Utility Coordinator $36.00 $112.74 Contract rates include labor, overhead, - Person Survey Crew (GPS and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification Robotic Total Stations included in the contract, but indirect cost rate. Mileage not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15-24A8-4715-A668-00F8B487D7CE Mobilization/Demobilization mile $4.00 Level C and D. Includes labor and equipment for records research, CADD, and mapping. LF $0.44 Level B (Designation). Includes labor and equipment for records research, designating, engineering, surveying, and CADD. LF $1.30 Level A (Location, Test Holes). Includes labor and equipment for vacuum excavation, engineering, surveying, and CADD. 0 to 5 ft. each $950.00 > 5 to 8 ft. each $1,250.00 > 8 to 13 ft. each $1,550.00 > 13 to 20 ft. each $1,900.00 > 20 ft. VF over 20' $150.00 ▇▇▇ ▇▇▇▇▇ Services One (1included.) Designating Person with Equipment hour $120.00 ▇▇▇ ▇▇▇▇▇ Services Two 110.00 2 - Person Survey Crew (2GPS and Robotic Total Stations included in indirect cost rate. Mileage not included.) Designtating Person with Equipment hour $160.00 ▇▇▇ Quality Level B 3D Modeling Equipment SPAR Day 155.00 3 - Person Survey Crew (GPS and Robotic Total Stations included in indirect cost rate. Mileage not included.) hour $700.00 185.00 4 - Person Survey Crew (GPS and Robotic Total Stations included in indirect cost rate. Mileage not included.) hour $210.00 The unit costs shown include labor, overhead, and profit. Payment based on units completed. No partial payments. All unit costs are negotiated costs and are not subject to change or adjustment. Unit Cost Payment Basis: If unit costs by year are included, unit costs billed should correspond to the fiscal or calendar year, if applicable, in which the work was done. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15487DF4F5-24A8443A-402D-88BD-4715-A668-00F8B487D7CE LodgingEC5BD0BE2A0F Mobilization for Aerial Photography/Hotel - Taxes and Fees day/person $25.00 Lodging/Hotel (Taxes/fees not included) day/person Current State Rate Meals (Excluding alcohol & tips) (Overnight stay required) day/person Current State Rate Mileage mile Current State Rate SUV or ATV Rental LiDAR Fixed Wing Aircraft (Includes taxes aircraft, Pilot, Camera/LiDAR Operator, fuel and fees; Insurance costs will not be reimbursed) day $110.00 Rental Car Fuel gallon $3.75 Rental Car (Includes taxes and fees; Insurance costs will not be reimbursed) day $52.00 Air Travel - In State - Short Notice (Coach) Rd Trip/person $350.00 Air Travel - In State - 2+ Wks Notice (Coach) Rd Trip/person Coach Fare $300.00 Air Travel - Out of State - 2+ Wks Notice (Coach) Rd Trip/person $450.00 Air Travel - Out of State - Short Notice (Coach) Rd Trip/person $650.00 Taxi/Cab fare each/person $29.00 Parking day $15.00 Toll Charges each $3.00 Standard Postage letter Current Postal Rate Certified Letter Return Receipt each Current Postal Rate Overnight Mail - letter size each Current Postal Rate Overnight Mail - oversized box each $30.00 Courier Services each $25.00 Photocopies B/W (11" X 17") each $0.20 Photocopies B/W (8 1/2" X 11") each $0.12 Photocopies Color (11" X 17") each $0.75 Photocopies Color (8 1/2" X 11") each $0.45 Digital Ortho Plotting sheet $1.40 Plots (B/W on Bond) per sq. ft. $0.50 Plots (Color on Bond) per sq. ft. $1.05 Plots (Color on Photographic Paper) per sq. ft. $4.00 Color Graphics on Foam Board square foot $4.00 Presentation Boards 30" X 40" Color Mounted each $80.00 Report Printing each $35.00 Report Binding and tabbing each $4.50 Reproduction of CD/DVD each $3.00 CDs each $1.00 4" X 6" Digital Color Print picture $0.25 Tx Parks & Wildlife Data Request Fees each $50.00 Hazardous Materials Database Search per search $300.00 Noise Meter Rental per project $57.00 Environmental Field Supplies (lathes, stakes, flagging, spray paint, etc.) day $30.00 Curator (Drawer & TX Archaeological Research Lab for artifacts & reporttransportation cost) per project $2,100.00 Newspaper Advertisement 23,000.00 Aerial Photography Flight Crew Fixed Wing Aircraft (Includes Pilot and Camera Operator) hour $200.00 LiDAR Flight Crew Fixed Wing Aircraft (Includes Pilot and LiDAR Operator) hour $200.00 Mobilization for Helicopter Airborne LiDAR (Includes helicopter, Pilot, LiDAR Operator, fuel and transportation cost) per publication project $2,500.00 Court Reporter page 23,000.00 Helicopter Flight Crew Fixed Wing Aircraft (Includes Pilot and LiDAR Operator) hour $4.00 Court Reporter (Public Meetings200.00 The unit costs shown include labor, Hearings & Transcription) day $500.00 overhead, and profit. Payment based on units completed. No partial payments. All unit costs are negotiated costs and are not subject to change or adjustment. Unit Cost Payment Basis: If unit costs by year are included, unit costs billed should correspond to the fiscal or calendar year, if applicable, in which the work was done. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15487DF4F5-24A8443A-402D-88BD-4715-A668-00F8B487D7CE Translator (English to Spanish, other language as appropriate, or Sign Language) for Public Involvement event EC5BD0BE2A0F Volumetric Shrinkage ASTM D427 each $400.00 Translator (English to Spanish, other language as appropriate, or Sign Language) hour 90.00 Standard ▇▇▇▇▇▇▇ Test ASTM D698 each $100.00 Custodian for Public Involvement hour/custodian $30.00 Sound Technician for Public Involvement event 240.00 Modified ▇▇▇▇▇▇▇ Test ASTM D1557 each $250.00 Public Involvement Facility Rental Standard Penetration Test (estimateSPT) 4 hours ASTM D1586 LF $750.00 Public involvement Facility Rental 28.00 California Bearing Ratio (estimateSingle Sample without MD Curve) 8 hours ASTM D1883 test $3,000.00 Public Involvement Facility Rental 225.00 Unconfined Compressive Strength (estimateSoil) hour ASTM D2166 each $150.00 Public Involvement Facility Rental event $800.00 Audio - Equipment Rental 65.00 Hydraulic Conductivity Permeability ASTM D2434 each $300.00 Audio - Visual Equipment Rental event $250.00 Public Notices - Mass Mailing (500 pieces) per mailing $500.00 FEMA FIS (Manual) One Dimensional Consolidation Properties of Soil ASTM D2435 each $5.00 FEMA FIS Backup Data Request 400.00 Unconfined Compressive Strength (Rock) ASTM D2938 each $300.00 FEMA Map Revision Submittal (CLOMR/LOMR) (Submittal Fee Only) 75.00 Direct Shear Test of Soils Under Consolidated Drained Conditions ASTM D3080 set of 3 $1,100.00 Splitting Tensile of Intact Rock Core ASTM D3967 each $5,000.00 FEMA Model/Floodplain Hardcopy each $250.00 Railroad - Flagger (Service provided by RR) hour $60.00 Railroad - Insurance in addition to STD Minimum Required (Minimum coverage of $1 Million required by RR.) each $3,500.00 Railroad - Permit [Note: Read and then delete this note. Most railroad companies charge a fee of $500 for the permit to access their property.] each $1,500.00 Railroad - Safety Training (If required - Heavy Rail Safety Training Certificate, includes classroom training and employee certification card.) Per Person $150.00 Traffic Control Services, Arrow Boards and Attenuator trucks - Large Project (Includes labor, equipment and fuel) day $2,800.00 Traffic Control Services, Arrow Boards and Attenuator trucks - Medium Project (Includes labor, equipment and fuel) day $2,000.00 Traffic Control Services, Arrow Boards and Attenuator trucks - Small Project (Includes labor, equipment and fuel) day $1,450.00 Attenuator trucks - (Lan200.00 Water Stand Pipes AS

Appears in 1 contract

Sources: Contract for Engineering Services

Range of Cost Plus Fixed Fee. Actual wages must be within the allowable range shown on the Final Cost Proposal. DocuSign Envelope ID: 92042E15848E3370-24A82E09-4715424A-A668A3FD-00F8B487D7CE A35D904AFB8D * The MAXIMUM AMOUNT PAYABLE is $4,567,940.05 _1,000,000.00. The maximum amount payable is based on the following data and calculations: * The maximum Maximum amount payable must be based on the contract scopenegotiated for each work authorization. The work authorization fee schedules will be derived from this attachment. Principal 20+ $75.00 $237.91 Senior Project Manager 20+ $75.00 $237.91 Project Manager 10 to 20 $62.00 76.50 $196.68 Quality Manager 10 to 20 $61.00 $193.50 234.02 Senior Engineer 15+ $55.00 62.00 $174.47 189.66 Project Engineer 10 to 15 $46.00 50.00 $145.92 152.96 Design Engineer 5 to 10 $40.00 38.50 $126.89 117.78 Traffic Engineer 5 to 10 $56.00 $171.31 Traffic Engineer- Modeler/Analyst 5 to 10 $39.00 $119.30 Engineer-In-Training 1 to 5 $33.00 30.00 $104.68 91.77 Senior Engineer Tech 15+ $37.00 34.50 $117.37 105.54 Engineer Tech 5 to 15 $30.00 28.00 $95.17 85.65 Junior Engineer Tech 1 to 5 $22.00 $69.79 67.30 Senior CADD Operator 15+ $33.00 30.00 $104.68 91.77 CADD Operator 5 to 15 $25.00 $79.30 76.48 Junior CADD Operator 1 to 5 $21.00 22.00 $66.62 67.30 Senior Traffic Tech 15+ $28.00 $85.65 Traffic Tech 5 to 15 $26.00 $79.54 Junior Traffic Tech 1 to 5 $20.00 $61.18 Admin/Clerical $21.00 21.75 $66.62 66.54 Senior ITS Engineer 15+ $61.25 $187.37 ITS Project Engineer 10 to 15 $50.00 $152.96 ITS Design Engineer 5 to 10 $40.00 $122.36 Signal Systems Specialist $35.00 $107.07 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15848E3370-24A82E09-4715424A-A668A3FD-00F8B487D7CE Senior A35D904AFB8D Project Manager 20+ 10 to 20 $70.00 72.26 $224.83 174.87 Senior Engineer 15+ $59.00 67.02 $189.50 162.19 Project Engineer 10 to 15 $47.00 52.55 $150.96 127.17 Design Engineer 5 to 10 $39.00 46.01 $125.26 111.34 Traffic Engineer 5 to 10 $48.00 46.01 $154.17 Traffic Engineer- Modeler/Analyst 5 to 10 $37.00 $118.84 111.34 Engineer-In-Training 1 to 5 $34.00 37.50 $109.20 90.75 Senior Engineer Tech 15+ $35.00 39.76 $112.42 96.22 Engineer Tech 5 to 15 $27.00 34.00 $86.72 Junior Engineer Tech 1 to 5 $18.56 $59.61 82.28 Senior CADD Operator 15+ $27.00 36.78 $86.72 89.01 CADD Operator 5 to 15 $22.50 31.54 $72.27 76.33 Junior CADD Operator 1 to 5 $19.00 26.64 $61.03 64.47 Senior Traffic Tech 15+ $30.00 26.00 $96.36 62.92 Traffic Tech 5 to 15 $25.00 23.00 $80.30 55.66 Junior Traffic Tech 1 to 5 $20.00 $48.40 Admin/Clerical $15.00 24.52 $48.18 Sr. Travel Demand Modeler 15+ 59.34 Signal Systems Specialist $54.00 28.84 $173.44 Sr Project Analyst 10+ $37.00 $118.84 Project Coordinator $30.00 $96.36 69.79 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15848E3370-24A82E09-4715424A-A668A3FD-00F8B487D7CE Principal 20+ $75.70 $183.19 Senior Project Manager 20+ $69.75 $168.80 A35D904AFB8D Project Manager 10 to 20 $62.00 75.00 $150.04 Quality Manager 10 to 20 $58.50 $141.57 181.50 Senior CADD Operator Traffic Tech 15+ $28.00 20.00 $67.76 CADD Operator 48.40 Traffic Tech 5 to 15 $25.00 17.50 $60.50 42.35 Junior CADD Operator Traffic Tech 1 to 5 $20.00 15.00 $48.40 Senior Geologist 15+ $39.00 $94.38 Geologist 5 to 15 $30.00 $72.60 Senior Environmental Planner 15+ $55.00 $133.10 Environmental Planner IV 10 to 15 $45.50 $110.11 Environmental Planner III 5 to 10 $40.00 $96.80 Environmental Planner I36.30 Admin/II 1 to 5 $30.50 $73.81 Senior Environmental Specialist 15+ $45.00 $108.90 Environmental Specialist 5 to 15 $30.50 $73.81 Junior Environmental Specialist 1 to 5 $26.00 $62.92 Senior Environmental Scientist 15+ $49.50 $119.79 Environmental Scientist IV 10 to 15 $42.00 $101.64 Environmental Scientist III 5 to 10 $34.00 $82.28 Environmental Scientist I/II 1 to 5 $29.00 $70.18 Senior Biologist 15+ $40.00 $96.80 Biologist IV 10 to 15 $33.00 $79.86 Biologist III 5 to 10 $30.00 $72.60 Biologist I/II 1 to 5 $28.50 $68.97 Senior Archeologist-Principal Investigator 15+ $41.00 $99.22 Archeologist IV 10 to 15 $35.00 $84.70 Archeologist III 5 to 10 $31.00 $75.02 Archeologist I/II 1 to 5 $27.00 $65.34 Senior Field Tech (Envrionmental, Biological, Archeological) 15+ $22.00 $53.24 Field Tech (Envrionmental, Biological, Archeological) 5 to 15 $17.00 $41.14 Senior Historian 15+ $32.00 $77.44 Historian IV 10 to 15 $30.20 $73.08 Historian III 5 to 10 $29.50 $71.39 Historian I/II 1 to 5 $27.00 $65.34 Senior Public Involvement Officer 15+ $42.00 $101.64 Public Involvement Officer 5 to 15 $35.00 $84.70 Senior Public Involvement Specialist 15+ $43.50 $105.27 Public Involvement Specialist 5 to 15 $33.00 $79.86 Junior Public Involvement Specialist 1 to 5 $24.50 $59.29 Senior Transportation Planner 15+ $35.00 $84.70 Transportation Planner IV 10 to 15 $32.75 $79.26 Transportation Planner III 5 to 10 $29.00 $70.18 Transportation Planner I/II 1 to 5 Clerical $20.00 $48.40 Senior Urban Planner 15+ $44.50 $107.69 Urban Planner IV 10 to 15 $39.00 $94.38 Urban Planner III 5 to 10 $33.50 $81.07 Urban Planner I/II 1 to 5 $31.00 $75.02 Environmental Inspector 5+ $32.00 $77.44 Admin/Clerical $18.00 $43.56 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15848E3370-24A82E09-4715424A-A668A3FD-00F8B487D7CE Principal 20+ A35D904AFB8D Project Manager 10 to 20 $67.00 70.00 $180.57 210.80 Senior Public Involvement Officer Engineer 15+ $49.12 57.00 $132.38 Public Involvement Officer 171.65 Project Engineer 10 to 15 $55.00 $165.62 Design Engineer 5 to 10 $38.00 $114.43 Traffic Engineer 5 to 10 $50.00 $150.57 Engineer-In-Training 1 to 5 $30.50 $91.85 Senior Engineer Tech 15+ $35.00 $105.40 Engineer Tech 5 to 15 $35.00 25.00 $94.33 75.28 Senior Public Involvement Specialist CADD Operator 15+ $41.66 25.00 $112.27 Public Involvement Specialist 75.28 CADD Operator 5 to 15 $33.48 20.00 $90.23 60.23 Senior Traffic Tech 15+ $19.00 $57.22 Traffic Tech 5 to 15 $16.00 $48.18 Junior Public Involvement Specialist Traffic Tech 1 to 5 $22.00 14.00 $59.29 42.16 Admin/Clerical $20.00 $53.90 60.23 Senior ITS Engineer Tech 15+ $28.00 60.00 $75.46 180.68 ITS Project Engineer 10 to 15 $40.00 $120.45 ITS Design Engineer 5 to 10 $32.00 $96.36 Signal Systems Specialist $20.00 $60.23 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15848E3370-24A82E09-4715424A-A668A3FD-00F8B487D7CE RPLS A35D904AFB8D 24-Hour Automated Tube Counts - Project Manager 15+ Volume N/A per counter/day $52.00 160.00 24-Hour Automated Tube Counts - Bi-directional N/A per counter/day $141.24 RPLS 210.00 24-Hour Automated Tube Counts - Task Leader 10 to 15 Urban Freeway Main Lanes N/A per counter/day $43.50 350.00 24-Hour Automated Tube Counts - Rural Main Lanes N/A per counter/day $118.16 Senior Survey Tech 280.00 24-Hour Automated Tube Counts - Speed or Class N/A per counter/day $220.00 Intersection Turning Movement Counts N/A per counter/hour/day $120.00 Turning Movement Count (Must be Surveyor 12-hour Manual) Minor Intersection N/A each $650.00 Turning Movement Count (12-hour Manual) Major Intersection N/A each $1,400.00 2-hour Turning Movment Count, Minor Intersection, Weekday N/A each $190.00 2-hour Turning Movment Count, Major Intersection, Weekday N/A each $350.00 2-hour Turning Movment Count, Minor Intersection, Weekend N/A each $235.00 2-hour Turning Movment Count, Major Intersection, Weekend N/A each $450.00 Travel Time Runs in Training DMI-Equipped Vehicle (SIT), or ha 5 to 10 $32.50 $88.28 Survey Tech 1 to 5 $29.50 $80.13 Senior GIS Operator $33.00 $89.64 GIS Operator $29.00 $78.77 GIS Technician $27.00 $73.34 AdminIncludes labor and mileage) N/Clerical $19.44 $52.80 Project Coordinator - Mobile LiDAR $43.00 $116.80 Mobile LiDAR Processing Technician $33.00 $89.64 Project Coordinator - AM $44.00 $119.51 Certified Photogrammetrist $36.00 $97.78 Analytical Triangulation Specialist $27.00 $73.34 Aerial Mapping Technician $25.06 $68.07 Orthophoto Specialist $24.00 $65.19 Mapping Editor (includes QA/QC, Finishing, & Finalization) $26.25 $71.30 Aerial Office Technician $20.00 $54.32 Project Coordinator - AP $40.75 $110.69 Aerial Processing Technician $29.75 $80.81 Project Coordinator - FWAL $40.50 $110.01 Airborne LiDAR Processing Technician $33.00 $89.64 Project Coordinator - HAL $40.50 $110.01 Helicopter LiDAR Processing Technician $31.50 $85.56 Photo Lab Specialist $20.25 $55.00 Photo Processing Technician $20.25 $55.00 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15-24A8-4715-A668-00F8B487D7CE 1 - Person Survey Crew (GPS and Robotic Total Stations included in indirect cost rate. Mileage not included.) A hour $90.00 2 - Person 150.00 Speed Survey Crew (GPS and Robotic Total Stations included in indirect cost rate. Mileage not included.location) hour N/A per location $135.00 3 - Person Survey Crew (GPS and Robotic Total Stations included in indirect cost rate. Mileage not included.) hour 200.00 Intersection Diagrams / Sketches N/A per intersection $165.00 4 - Person Survey Crew (GPS and Robotic Total Stations included in indirect cost rate. Mileage not included.) hour 120.00 Intersection Photography N/A per intersection $190.00 LiDAR Mobile Mapping System, (Includes Vehicle Operator, LiDAR Technician mileage on project and fuel) (Does not include travel to project.) 35.00 24-Hour Volume Video/Radar Count Per Lane-Main Lane per lane/day per lane/day $6,500.00 Mobilization for Aerial Photography170.00 24-Hour 3 Classification Video/LiDAR Fixed Wing Aircraft (Includes aircraft, Pilot, CameraRadar Count Per Lane-Main Lane per lane/LiDAR Operator, fuel and transportation cost) day per lane/day $175.00 24Hour 13 Classification Video Count Per Project Lane-Main Lane per lane/day per lane/day $18,000.00 Aerial Photography Flight Crew Fixed Wing Aircraft (Includes Pilot and Camera Operator) hour 360.00 72-Hour Bluetooth O&D Main Lane per device per device $180.00 LiDAR Flight Crew Fixed Wing Aircraft (Includes Pilot and LiDAR Operator) hour 1,100.00 72-Hour Bluetooth O&D Arterial per device per device $190.00 Mobilization for Helicopter Airborne LiDAR (Includes helicopter, Pilot, LiDAR Operator, fuel and transportation cost) Per Project $19,000.00 Helicopter Flight Crew Fixed Wing Aircraft (Includes Pilot and LiDAR Operator) hour $190.00 550.00 The unit costs shown include labor, overhead, and profit. Payment based on units completed. No partial payments. All unit costs are negotiated costs and are not subject to change or adjustment. Unit Cost Payment Basis: If unit costs by year are included, unit costs billed should correspond to the fiscal or calendar year, if applicable, in which the work was done. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15848E3370-24A82E09-4715424A-A668A3FD-00F8B487D7CE Principal 20+ $76.00 $238.00 Senior Project Manager 20+ $74.00 $231.74 Project Manager 10 to 20 $62.00 $194.16 Quality Manager 10 to 20 $59.00 $184.76 Senior Engineer 15+ $60.00 $187.90 Project Engineer 10 to 15 $46.00 $144.05 Design Engineer 5 to 10 $40.00 $125.26 Engineer-In-Training 1 to 5 $33.00 $103.34 Senior Engineer Tech 15+ $38.00 $119.00 Engineer Tech 5 to 15 $25.00 $78.29 Junior Engineer Tech 1 to 5 $21.00 $65.76 Senior CADD Operator 15+ $33.00 $103.34 CADD Operator 5 to 15 $30.00 $93.95 Junior CADD Operator 1 to 5 $21.00 $65.76 Senior Project Controller 15+ $35.50 $111.17 Project Controller 5 to 15 $30.00 $93.95 Public Involvement Specialist 5 to 15 $30.00 $93.95 Junior Public Involvement Specialist 1 to 5 $22.00 $68.89 Senior Utility Coordinator $47.00 $147.18 Utility Coordinator $36.00 $112.74 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15-24A8-4715-A668-00F8B487D7CE Mobilization/Demobilization mile $4.00 Level C and D. Includes labor and equipment for records research, CADD, and mapping. LF $0.44 Level B (Designation). Includes labor and equipment for records research, designating, engineering, surveying, and CADD. LF $1.30 Level A (Location, Test Holes). Includes labor and equipment for vacuum excavation, engineering, surveying, and CADD. 0 to 5 ft. each $950.00 > 5 to 8 ft. each $1,250.00 > 8 to 13 ft. each $1,550.00 > 13 to 20 ft. each $1,900.00 > 20 ft. VF over 20' $150.00 ▇▇▇ ▇▇▇▇▇ Services One (1) Designating Person with Equipment hour $120.00 ▇▇▇ ▇▇▇▇▇ Services Two (2) Designtating Person with Equipment hour $160.00 ▇▇▇ Quality Level B 3D Modeling Equipment SPAR Day $700.00 The unit costs shown include labor, overhead, and profit. Payment based on units completed. No partial payments. All unit costs are negotiated costs and are not subject to change or adjustment. Unit Cost Payment Basis: If unit costs by year are included, unit costs billed should correspond to the fiscal or calendar year, if applicable, in which the work was done. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15-24A8-4715-A668-00F8B487D7CE Lodging/Hotel - Taxes and Fees day/person $25.00 A35D904AFB8D Lodging/Hotel (Taxes/fees not included) day/person Current State Rate Lodging/Hotel - Taxes and Fees day/person $30.00 Meals (Excluding alcohol & tips) (Overnight stay required) day/person Current State Rate Mileage mile Current State Rate SUV or ATV Rental (Includes taxes and fees; Insurance costs will not be reimbursed) day $110.00 Rental Car Fuel gallon $3.75 Rental Car (Includes taxes and fees; Insurance costs will not be reimbursed) day $52.00 65.00 Rental Car Fuel gallon $3.00 Air Travel - In State - Short Notice (Coach) Rd Trip/person $350.00 550.00 Air Travel - In State - 2+ Wks Notice (Coach) Rd Trip/person Coach Fare $300.00 Air Travel - Out of State - 2+ Wks Notice (Coach) Rd Trip/person $450.00 Air Travel - Out of State - Short Notice (Coach) Rd Trip/person $650.00 Taxi/Cab fare each/person $29.00 350.00 Parking day $15.00 20.00 Toll Charges each $3.00 4.00 Standard Postage letter Current Postal Rate Certified Letter Return Receipt each Current Postal Rate Overnight Mail - letter size each Current Postal Rate $28.00 Overnight Mail - oversized box each $30.00 Courier Services each $25.00 Photocopies B/W (8 1/2" X 11") each $0.10 Photocopies B/W (11" X 17") each $0.20 Photocopies B/W (8 1/2" X 11") each $0.12 Photocopies Color (11" X 17") each $0.75 Photocopies Color (8 1/2" X 11") each $0.45 Digital Ortho Plotting sheet $1.40 Plots 0.50 Photocopies Color (B/W on Bond) per sq. ft. $0.50 Plots (Color on Bond) per sq. ft. $1.05 Plots (Color on Photographic Paper) per sq. ft. $4.00 Color Graphics on Foam Board square foot $4.00 Presentation Boards 3011" X 40" Color Mounted 17") each $80.00 Report Printing each $35.00 Report Binding and tabbing each $4.50 Reproduction of CD/DVD each $3.00 0.70 CDs each $1.00 4" X 6" Digital Color Print picture 2.00 Profit not allowed on Other Direct Expenses. For Cost Plus Fixed Fee, Specified Rate, and Unit Cost - Fixed cost items to be billed at the fixed cost rate. Documentation, such as a usage log, must be maintained for audit purposes, and may be required to be submitted as a basis for reimbursement. For items with a maximum cost, actual cost to be billed not to exceed the maximum shown. Itemized receipts must be maintained for audit purposes, and may be required to be submitted as a basis for reimbursement. For Lump Sum - No documentation required. Invoicing by physical percent complete includes combination of direct labor and other direct expenses. NOTE: For Cost Plus Fixed Fee, Specified Rate, and Unit Cost - Miscellaneous other direct expenses up to $0.25 Tx Parks & Wildlife Data Request Fees each 100 per unit will be reimbursed at cost if approved and documented in advance by the State's Project Manager. Miscellaneous other direct expenses of $50.00 Hazardous Materials Database Search 100 per search unit or more will not be reimbursed unless a supplemental agreement to the contract and work authorization (if WAs are used) has been executed in advance authorizing the miscellaneous other direct expenses. No more than $300.00 Noise Meter Rental per project $57.00 Environmental Field Supplies (lathes, stakes, flagging, spray paint, etc.) day $30.00 Curator (Drawer & TX Archaeological Research Lab for artifacts & report) per project $2,100.00 Newspaper Advertisement per publication $2,500.00 Court Reporter page $4.00 Court Reporter (Public Meetings, Hearings & Transcription) day $500.00 2,500 in miscellaneous other direct expenses may be approved by the State's Project Manager over the life of this contract including prime provider and subproviders. For Lump Sum - This statement does not apply. DocuSign Envelope ID: 92042E15848E3370-24A82E09-4715424A-A668A3FD-00F8B487D7CE Translator (English to Spanish, other language as appropriate, or Sign Language) for Public Involvement event $400.00 Translator (English to Spanish, other language as appropriate, or Sign Language) hour $100.00 Custodian for Public Involvement hour/custodian $30.00 Sound Technician for Public Involvement event $250.00 Public Involvement Facility Rental (estimate) 4 hours $750.00 Public involvement Facility Rental (estimate) 8 hours $3,000.00 Public Involvement Facility Rental (estimate) hour $150.00 Public Involvement Facility Rental event $800.00 Audio - Equipment Rental each $300.00 Audio - Visual Equipment Rental event $250.00 Public Notices - Mass Mailing (500 pieces) per mailing $500.00 FEMA FIS (Manual) each $5.00 FEMA FIS Backup Data Request each $300.00 FEMA Map Revision Submittal (CLOMR/LOMR) (Submittal Fee Only) each $5,000.00 FEMA Model/Floodplain Hardcopy each $250.00 Railroad - Flagger (Service provided by RR) hour $60.00 Railroad - Insurance in addition to STD Minimum Required (Minimum coverage of $1 Million required by RR.) each $3,500.00 Railroad - Permit [NoteA35D904AFB8D DocuSign Envelope ID: Read and then delete this note. Most railroad companies charge a fee of $500 for the permit to access their property.] each $1,500.00 Railroad - Safety Training (If required - Heavy Rail Safety Training Certificate, includes classroom training and employee certification card.) Per Person $150.00 Traffic Control Services, Arrow Boards and Attenuator trucks - Large Project (Includes labor, equipment and fuel) day $2,800.00 Traffic Control Services, Arrow Boards and Attenuator trucks - Medium Project (Includes labor, equipment and fuel) day $2,000.00 Traffic Control Services, Arrow Boards and Attenuator trucks - Small Project (Includes labor, equipment and fuel) day $1,450.00 Attenuator trucks - (Lan848E3370-2E09-424A-A3FD-A35D904AFB8D DocuSign Envelope ID: 848E3370-2E09-424A-A3FD-A35D904AFB8D DocuSign Envelope ID: 848E3370-2E09-424A-A3FD-A35D904AFB8D

Appears in 1 contract

Sources: Contract for Engineering Services

Range of Cost Plus Fixed Fee. Actual wages must be within the allowable range shown on the Final Cost Proposal. DocuSign Envelope ID: 92042E15814845E0-24A895B8-471546A4-A668A4F1-00F8B487D7CE 6A61CCE37DEB * The MAXIMUM AMOUNT PAYABLE is $4,567,940.05 The maximum amount payable is based on the following data and calculations: * The maximum 1,000,000.00. *Maximum amount payable must be based on the contract scopenegotiated for each work authorization. The work authorization fee schedules will be derived from this attachment. Principal 20+ $75.00 $237.91 Senior Project Manager 20+ $75.00 $237.91 Project Manager 10 to 20 $62.00 75.00 $196.68 203.82 Quality Manager 10 to 20 $61.00 70.00 $193.50 190.24 Senior Structural Engineer 15+ $70.00 $190.24 Senior Engineer 15+ $55.00 66.00 $174.47 179.37 Structural Engineer 5 to 15 $60.00 $163.06 Project Engineer 10 to 15 $46.00 50.00 $145.92 135.88 Design Engineer 5 to 10 $40.00 43.50 $126.89 118.22 Engineer-In-Training 1 to 5 $33.00 36.00 $104.68 97.84 Senior Engineer Tech 15+ $37.00 38.00 $117.37 103.27 Engineer Tech 5 to 15 $30.00 29.00 $95.17 78.81 Junior Engineer Tech 1 to 5 $22.00 25.00 $69.79 67.94 Senior CADD Operator 15+ $33.00 35.00 $104.68 95.12 CADD Operator 5 to 15 $25.00 29.00 $79.30 78.81 Junior CADD Operator 1 to 5 $21.00 25.00 $66.62 67.94 Senior Electrical Engineer 15+ $70.00 $190.24 Electrical Engineer 5 to 15 $50.00 $135.88 Electrical Inspector 5+ $32.00 $86.97 Senior Mechanical Engineer 15+ $70.00 $190.24 Mechanical Engineer 5 to 15 $50.00 $135.88 Mechanical Inspector 1 to 5 $32.00 $86.97 Admin/Clerical $21.00 24.00 $66.62 65.22 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15814845E0-24A895B8-471546A4-A668A4F1-00F8B487D7CE Senior Project Manager 20+ $70.00 $224.83 Senior Engineer 15+ $59.00 $189.50 Project Engineer 10 to 15 $47.00 $150.96 Design Engineer 5 to 10 $39.00 $125.26 Traffic Engineer 5 to 10 $48.00 $154.17 Traffic Engineer- Modeler/Analyst 5 to 10 $37.00 $118.84 Engineer-In-Training 1 to 5 $34.00 $109.20 Senior Engineer Tech 15+ $35.00 $112.42 Engineer Tech 5 to 15 $27.00 $86.72 Junior Engineer Tech 1 to 5 $18.56 $59.61 Senior CADD Operator 15+ $27.00 $86.72 CADD Operator 5 to 15 $22.50 $72.27 Junior CADD Operator 1 to 5 $19.00 $61.03 Senior Traffic Tech 15+ $30.00 $96.36 Traffic Tech 5 to 15 $25.00 $80.30 Admin/Clerical $15.00 $48.18 Sr. Travel Demand Modeler 15+ $54.00 $173.44 Sr Project Analyst 10+ $37.00 $118.84 Project Coordinator $30.00 $96.36 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15-24A8-4715-A668-00F8B487D7CE Principal 20+ $75.70 $183.19 Senior Project Manager 20+ $69.75 $168.80 Project Manager 10 to 20 $62.00 $150.04 Quality Manager 10 to 20 $58.50 $141.57 Senior CADD Operator 15+ $28.00 $67.76 CADD Operator 5 to 15 $25.00 $60.50 Junior CADD Operator 1 to 5 $20.00 $48.40 Senior Geologist 15+ $39.00 $94.38 Geologist 5 to 15 $30.00 $72.60 Senior Environmental Planner 15+ $55.00 $133.10 Environmental Planner IV 10 to 15 $45.50 $110.11 Environmental Planner III 5 to 10 $40.00 $96.80 Environmental Planner I/II 1 to 5 $30.50 $73.81 Senior Environmental Specialist 15+ $45.00 $108.90 Environmental Specialist 5 to 15 $30.50 $73.81 Junior Environmental Specialist 1 to 5 $26.00 $62.92 Senior Environmental Scientist 15+ $49.50 $119.79 Environmental Scientist IV 10 to 15 $42.00 $101.64 Environmental Scientist III 5 to 10 $34.00 $82.28 Environmental Scientist I/II 1 to 5 $29.00 $70.18 Senior Biologist 15+ $40.00 $96.80 Biologist IV 10 to 15 $33.00 $79.86 Biologist III 5 to 10 $30.00 $72.60 Biologist I/II 1 to 5 $28.50 $68.97 Senior Archeologist-Principal Investigator 15+ $41.00 $99.22 Archeologist IV 10 to 15 $35.00 $84.70 Archeologist III 5 to 10 $31.00 $75.02 Archeologist I/II 1 to 5 $27.00 $65.34 Senior Field Tech (Envrionmental, Biological, Archeological) 15+ $22.00 $53.24 Field Tech (Envrionmental, Biological, Archeological) 5 to 15 $17.00 $41.14 Senior Historian 15+ $32.00 $77.44 Historian IV 10 to 15 $30.20 $73.08 Historian III 5 to 10 $29.50 $71.39 Historian I/II 1 to 5 $27.00 $65.34 Senior Public Involvement Officer 15+ $42.00 $101.64 Public Involvement Officer 5 to 15 $35.00 $84.70 Senior Public Involvement Specialist 15+ $43.50 $105.27 Public Involvement Specialist 5 to 15 $33.00 $79.86 Junior Public Involvement Specialist 1 to 5 $24.50 $59.29 Senior Transportation Planner 15+ $35.00 $84.70 Transportation Planner IV 10 to 15 $32.75 $79.26 Transportation Planner III 5 to 10 $29.00 $70.18 Transportation Planner I/II 1 to 5 $20.00 $48.40 Senior Urban Planner 15+ $44.50 $107.69 Urban Planner IV 10 to 15 $39.00 $94.38 Urban Planner III 5 to 10 $33.50 $81.07 Urban Planner I/II 1 to 5 $31.00 $75.02 Environmental Inspector 5+ $32.00 $77.44 Admin/Clerical $18.00 $43.56 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15-24A8-4715-A668-00F8B487D7CE Principal 20+ $67.00 $180.57 Senior Public Involvement Officer 15+ $49.12 $132.38 Public Involvement Officer 5 to 15 $35.00 $94.33 Senior Public Involvement Specialist 15+ $41.66 $112.27 Public Involvement Specialist 5 to 15 $33.48 $90.23 Junior Public Involvement Specialist 1 to 5 $22.00 $59.29 Admin/Clerical $20.00 $53.90 Engineer Tech $28.00 $75.46 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15-24A8-4715-A668-00F8B487D7CE RPLS - Project Manager 15+ $52.00 $141.24 RPLS - Task Leader 10 to 15 $43.50 $118.16 Senior Survey Tech (Must be Surveyor in Training (SIT), or ha 5 to 10 $32.50 $88.28 Survey Tech 1 to 5 $29.50 $80.13 Senior GIS Operator $33.00 $89.64 GIS Operator $29.00 $78.77 GIS Technician $27.00 $73.34 Admin/Clerical $19.44 $52.80 Project Coordinator - Mobile LiDAR $43.00 $116.80 Mobile LiDAR Processing Technician $33.00 $89.64 Project Coordinator - AM $44.00 $119.51 Certified Photogrammetrist $36.00 $97.78 Analytical Triangulation Specialist $27.00 $73.34 Aerial Mapping Technician $25.06 $68.07 Orthophoto Specialist $24.00 $65.19 Mapping Editor (includes QA/QC, Finishing, & Finalization) $26.25 $71.30 Aerial Office Technician $20.00 $54.32 Project Coordinator - AP $40.75 $110.69 Aerial Processing Technician $29.75 $80.81 Project Coordinator - FWAL $40.50 $110.01 Airborne LiDAR Processing Technician $33.00 $89.64 Project Coordinator - HAL $40.50 $110.01 Helicopter LiDAR Processing Technician $31.50 $85.56 Photo Lab Specialist $20.25 $55.00 Photo Processing Technician $20.25 $55.00 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15-24A8-4715-A668-00F8B487D7CE 1 - Person Survey Crew (GPS and Robotic Total Stations included in indirect cost rate. Mileage not included.) hour $90.00 2 - Person Survey Crew (GPS and Robotic Total Stations included in indirect cost rate. Mileage not included.) hour $135.00 3 - Person Survey Crew (GPS and Robotic Total Stations included in indirect cost rate. Mileage not included.) hour $165.00 4 - Person Survey Crew (GPS and Robotic Total Stations included in indirect cost rate. Mileage not included.) hour $190.00 LiDAR Mobile Mapping System, (Includes Vehicle Operator, LiDAR Technician mileage on project and fuel) (Does not include travel to project.) day $6,500.00 Mobilization for Aerial Photography/LiDAR Fixed Wing Aircraft (Includes aircraft, Pilot, Camera/LiDAR Operator, fuel and transportation cost) Per Project $18,000.00 Aerial Photography Flight Crew Fixed Wing Aircraft (Includes Pilot and Camera Operator) hour $180.00 LiDAR Flight Crew Fixed Wing Aircraft (Includes Pilot and LiDAR Operator) hour $190.00 Mobilization for Helicopter Airborne LiDAR (Includes helicopter, Pilot, LiDAR Operator, fuel and transportation cost) Per Project $19,000.00 Helicopter Flight Crew Fixed Wing Aircraft (Includes Pilot and LiDAR Operator) hour $190.00 The unit costs shown include labor, overhead, and profit. Payment based on units completed. No partial payments. All unit costs are negotiated costs and are not subject to change or adjustment. Unit Cost Payment Basis: If unit costs by year are included, unit costs billed should correspond to the fiscal or calendar year, if applicable, in which the work was done. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15-24A8-4715-A668-00F8B487D7CE Principal 20+ $76.00 $238.00 Senior Project Manager 20+ $74.00 $231.74 Project Manager 10 to 20 $62.00 $194.16 Quality Manager 10 to 20 $59.00 $184.76 Senior Engineer 15+ $60.00 $187.90 Project Engineer 10 to 15 $46.00 $144.05 Design Engineer 5 to 10 $40.00 $125.26 Engineer-In-Training 1 to 5 $33.00 $103.34 Senior Engineer Tech 15+ $38.00 $119.00 Engineer Tech 5 to 15 $25.00 $78.29 Junior Engineer Tech 1 to 5 $21.00 $65.76 Senior CADD Operator 15+ $33.00 $103.34 CADD Operator 5 to 15 $30.00 $93.95 Junior CADD Operator 1 to 5 $21.00 $65.76 Senior Project Controller 15+ $35.50 $111.17 Project Controller 5 to 15 $30.00 $93.95 Public Involvement Specialist 5 to 15 $30.00 $93.95 Junior Public Involvement Specialist 1 to 5 $22.00 $68.89 Senior Utility Coordinator $47.00 $147.18 Utility Coordinator $36.00 $112.74 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15-24A8-4715-A668-00F8B487D7CE Mobilization/Demobilization mile $4.00 Level C and D. Includes labor and equipment for records research, CADD, and mapping. LF $0.44 Level B (Designation). Includes labor and equipment for records research, designating, engineering, surveying, and CADD. LF $1.30 Level A (Location, Test Holes). Includes labor and equipment for vacuum excavation, engineering, surveying, and CADD. 0 to 5 ft. each $950.00 > 5 to 8 ft. each $1,250.00 > 8 to 13 ft. each $1,550.00 > 13 to 20 ft. each $1,900.00 > 20 ft. VF over 20' $150.00 ▇▇▇ ▇▇▇▇▇ Services One (1) Designating Person with Equipment hour $120.00 ▇▇▇ ▇▇▇▇▇ Services Two (2) Designtating Person with Equipment hour $160.00 ▇▇▇ Quality Level B 3D Modeling Equipment SPAR Day $700.00 The unit costs shown include labor, overhead, and profit. Payment based on units completed. No partial payments. All unit costs are negotiated costs and are not subject to change or adjustment. Unit Cost Payment Basis: If unit costs by year are included, unit costs billed should correspond to the fiscal or calendar year, if applicable, in which the work was done. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15-24A8-4715-A668-00F8B487D7CE 6A61CCE37DEB Lodging/Hotel - Taxes and Fees day/person $25.00 Current State Rate Lodging/Hotel (Taxes/fees not included) day/person Current State Rate Meals (Excluding alcohol & tips) (Overnight stay required) day/person Current State Rate Mileage mile Current State Rate SUV or ATV Rental (Includes taxes and fees; Insurance costs will not be reimbursed) day $110.00 120.00 Rental Car Fuel gallon $3.75 Rental Car (Includes taxes and fees; Insurance costs will not be reimbursed) day $52.00 3.50 Air Travel - In State - Short Notice (Coach) Rd Trip/person $350.00 550.00 Air Travel - In State - 2+ Wks Notice (Coach) Rd Trip/person Coach Fare $300.00 350.00 Air Travel - Out of State - 2+ Wks Notice (Coach) Rd Trip/person $450.00 650.00 Air Travel - Out of State - Short Notice (Coach) Rd Trip/person $650.00 825.00 Air Travel Standard Baggage Rd Trip/person $100.00 Oversize, special handling or extra baggage airline fees (with advance coordination with TxDOT) each $75.00 Taxi/Cab RideShare fare each/person $29.00 30.00 Parking day $15.00 20.00 Parking week $100.00 Toll Charges each $3.00 5.00 Standard Postage letter Current Postal Rate Certified Letter Return Receipt each Current Postal Rate Overnight Mail - letter size each Current Postal Rate Overnight Mail - oversized box each $30.00 Courier Services each $25.00 Current Postal Rate Materials and Shipping per package Current Postal Rate Photocopies B/W (11" X 17") each $0.20 0.21 Photocopies B/W (8 1/2" X 11") each $0.12 0.11 Photocopies Color (11" X 17") each $0.75 1.25 Photocopies Color (8 1/2" X 11") each $0.45 Digital Ortho Plotting sheet $1.40 Plots (B/W on Bond) per sq. ft. $0.50 Plots (Color on Bond) per sq. ft. $1.05 Plots (Color on Photographic Paper) per sq. ft. $4.00 Color Graphics on Foam Board square foot $4.00 Presentation Boards 30" X 40" Color Mounted each $80.00 0.69 Report Printing each $35.00 15.00 Report Binding and tabbing each $4.50 5.00 Reproduction of CD/DVD each $3.00 1.50 CDs each $1.00 4" X 6" Digital Color Print picture 1.50 Law Enforcement/Uniform Officer (including vehicle) hour $0.25 Tx Parks & Wildlife Data Request Fees 60.00 Phased Array Technician hour $200.00 Boat with Motor day $300.00 Boat Mobilization Fee each $50.00 Hazardous Materials Database Search per search $300.00 Noise Meter Rental per project $57.00 Environmental Field Supplies (lathes350.00 Scissor, stakes25-27', flagging, spray paint, etc.) 4WD day $30.00 Curator (Drawer & TX Archaeological Research Lab for artifacts & report) per project $2,100.00 Newspaper Advertisement per publication $2,500.00 Court Reporter page $4.00 Court Reporter (Public Meetings350.00 Scissor, Hearings & Transcription) 30-35' 4WD day $500.00 350.00 Scissor, 36-49', 4WD day $425.00 Scissor, 50-60', 4WD day $450.00 Scissor, 60-70', 4WD day $600.00 Scissor, 25-27', 4WD week $650.00 Scissor, 30-35' 4WD week $725.00 DocuSign Envelope ID: 92042E15814845E0-24A895B8-471546A4-A668A4F1-00F8B487D7CE Translator (English to Spanish6A61CCE37DEB Scissor, other language as appropriate36-49', or Sign Language) for Public Involvement event 4WD week $400.00 Translator (English to Spanish850.00 Scissor, other language as appropriate50-60', or Sign Language) hour 4WD week $100.00 Custodian for Public Involvement hour/custodian 1,200.00 Scissor, 60-70', 4WD week $30.00 Sound Technician for Public Involvement event 1,500.00 Scissor - Delivery each $250.00 Public Involvement Facility Rental (estimate) 4 hours 225.00 45' Bucket Truck mile $750.00 Public involvement Facility Rental (estimate) 8 hours 3.50 45' Bucket Truck week $3,000.00 Public Involvement Facility Rental (estimate) hour 1,150.00 45' Bucket Truck day $150.00 Public Involvement Facility Rental event $800.00 Audio 350.00 45' Bucket Truck - Equipment Rental Delivery each $300.00 Audio 120' Boom Lift month $12,000.00 120' Boom Lift week $6,000.00 120' Boom Lift day $2,200.00 120' Boom Lift - Visual Equipment Rental event $250.00 Public Notices - Mass Mailing (500 pieces) per mailing $500.00 FEMA FIS (Manual) Delivery each $5.00 FEMA FIS Backup Data Request 750.00 80' Boom Lift month $6,000.00 80' Boom Lift week $3,500.00 80' Boom Lift day $1,200.00 80' Boom Lift - Delivery each $450.00 60' Boom Lift month $4,000.00 60' Boom Lift week $2,700.00 60' Boom Lift day $900.00 60' Boom Lift - Delivery each $350.00 40' - 50' Boom Lift month $3,300.00 40' - 50' Boom Lift week $1,700.00 40' - 50' Boom Lift day $800.00 40' - 50' Boom Lift - Delivery each $300.00 FEMA Map Revision Submittal (CLOMR/LOMR) (Submittal Fee Only) Rope Access Equipment each $5,000.00 FEMA Model/Floodplain Hardcopy 400.00 Emergency Escape Breathing Apparatus each $250.00 Railroad 850.00 Confined Space Entry equipment rental Week $960.00 Rigging/Staging day $240.00 Rigging/Staging - Flagger (Service provided Mobilization each $200.00 Profit not allowed on Other Direct Expenses. For Cost Plus Fixed Fee, Specified Rate, and Unit Cost - Fixed cost items to be billed at the fixed cost rate. Documentation, such as a usage log, must be maintained for audit purposes, and may be required to be submitted as a basis for reimbursement. For items with a maximum cost, actual cost to be billed not to exceed the maximum shown. Itemized receipts must be maintained for audit purposes, and may be required to be submitted as a basis for reimbursement. For Lump Sum - No documentation required. Invoicing by RR) hour physical percent complete includes combination of direct labor and other direct expenses. NOTE: For Cost Plus Fixed Fee, Specified Rate, and Unit Cost - Miscellaneous other direct expenses up to $60.00 Railroad - Insurance 100 per unit will be reimbursed at cost if approved and documented in addition to STD Minimum Required (Minimum coverage advance by the State's Project Manager. Miscellaneous other direct expenses of $1 Million required 100 per unit or more will not be reimbursed unless a supplemental agreement to the contract and work authorization (if WAs are used) has been executed in advance authorizing the miscellaneous other direct expenses. No more than $2,500 in miscellaneous other direct expenses may be approved by RR.) each $3,500.00 Railroad the State's Project Manager over the life of this contract including prime provider and subproviders. For Lump Sum - Permit [NoteThis statement does not apply. DocuSign Envelope ID: Read and then delete this note. Most railroad companies charge a fee of $500 for the permit to access their property.] each $1,500.00 Railroad - Safety Training (If required - Heavy Rail Safety Training Certificate, includes classroom training and employee certification card.) Per Person $150.00 Traffic Control Services, Arrow Boards and Attenuator trucks - Large Project (Includes labor, equipment and fuel) day $2,800.00 Traffic Control Services, Arrow Boards and Attenuator trucks - Medium Project (Includes labor, equipment and fuel) day $2,000.00 Traffic Control Services, Arrow Boards and Attenuator trucks - Small Project (Includes labor, equipment and fuel) day $1,450.00 Attenuator trucks - (Lan814845E0-95B8-46A4-A4F1-6A61CCE37DEB DocuSign Envelope ID: 814845E0-95B8-46A4-A4F1-6A61CCE37DEB

Appears in 1 contract

Sources: Contract for Engineering Services

Range of Cost Plus Fixed Fee. Actual wages must be within the allowable range shown on the Final Cost Proposal. DocuSign Envelope ID: 92042E15F04D8EFA-7DC2-24A84EDC-4715AAF6-A668-00F8B487D7CE 887BB1F875D0 * The MAXIMUM AMOUNT PAYABLE is $4,567,940.05 The maximum amount payable is based on the following data and calculations: 5,000,000.00. * The maximum Maximum amount payable must be based on the contract scopenegotiated for each work authorization. The work authorization fee schedules will be derived from this attachment. Principal 20+ $75.00 $237.91 Senior Project Manager 20+ $75.00 70.00 $237.91 Project Manager 10 to 20 $62.00 $196.68 213.65 Quality Manager 10 to 20 $61.00 68.00 $193.50 207.55 Senior Engineer 15+ $55.00 63.00 $174.47 192.29 Senior Structural Engineer 15+ $68.00 $207.55 Structural Engineer 5 to 15 $60.00 $183.13 Project Engineer 10 to 15 $46.00 48.00 $145.92 146.50 Design Engineer 5 to 10 $40.00 42.00 $126.89 128.19 Traffic Engineer 5 to 10 $55.00 $167.87 Traffic Engineer- Modeler/Analyst 5 to 10 $43.00 $131.24 Engineer-In-Training 1 to 5 $33.00 34.00 $104.68 103.77 Senior Engineer Tech 15+ $37.00 $117.37 112.93 Engineer Tech 5 to 15 $30.00 29.00 $95.17 88.51 Junior Engineer Tech 1 to 5 $22.00 $69.79 67.15 Senior CADD Operator 15+ $33.00 32.00 $104.68 97.67 CADD Operator 5 to 15 $25.00 $79.30 76.30 Junior CADD Operator 1 to 5 $21.00 22.00 $66.62 67.15 Admin/Clerical $21.00 22.00 $66.62 67.15 RPLS - Task Leader 10 to 15 $46.00 $140.40 Senior Survey Tech (Must be Surveyor in Training (SIT), or ha 5 to 10 $35.00 $106.83 Survey Tech 1 to 5 $28.00 $85.46 GIS Operator $26.00 $79.36 GIS Technician $26.00 $79.36 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15F04D8EFA-7DC2-24A84EDC-4715AAF6-A668-00F8B487D7CE Senior 887BB1F875D0 Project Manager 20+ 10 to 20 $70.00 55.00 $224.83 167.89 Senior Engineer 15+ $59.00 50.00 $189.50 152.63 Project Engineer 10 to 15 $47.00 40.00 $150.96 122.10 Design Engineer 5 to 10 $39.00 34.00 $125.26 Traffic Engineer 5 to 10 $48.00 $154.17 Traffic Engineer- Modeler/Analyst 5 to 10 $37.00 $118.84 103.79 Engineer-In-Training 1 to 5 $34.00 31.00 $109.20 94.63 Senior Engineer Tech 15+ $35.00 31.00 $112.42 94.63 Engineer Tech 5 to 15 $27.00 25.00 $86.72 76.31 Junior Engineer Tech 1 to 5 $18.56 18.00 $59.61 54.95 Senior CADD Operator Geologist 15+ $27.00 36.50 $86.72 CADD Operator 111.42 Geologist 5 to 15 $22.50 32.00 $72.27 Junior CADD Operator 97.68 Geologist-In-Training 1 to 5 $19.00 $61.03 Senior Traffic Tech 15+ $30.00 $96.36 Traffic Tech 5 to 15 $25.00 $80.30 91.58 Admin/Clerical $15.00 20.00 $48.18 Sr. Travel Demand Modeler 15+ $54.00 $173.44 Sr Project Analyst 10+ $37.00 $118.84 Project Coordinator $30.00 $96.36 61.05 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15F04D8EFA-7DC2-24A84EDC-4715AAF6-A668-00F8B487D7CE Principal 20+ $75.70 $183.19 887BB1F875D0 Senior Project Manager 20+ $69.75 73.00 $168.80 Project Manager 10 to 20 $62.00 $150.04 211.57 Quality Manager 10 to 20 $58.50 65.00 $141.57 188.39 Senior Engineer 15+ $62.75 $181.87 Project Engineer 10 to 15 $48.00 $139.12 Design Engineer 5 to 10 $43.00 $124.63 Engineer-In-Training 1 to 5 $34.00 $98.54 Senior Engineer Tech 15+ $34.00 $98.54 Engineer Tech 5 to 15 $27.00 $78.25 Junior Engineer Tech 1 to 5 $22.00 $63.76 Senior CADD Operator 15+ $28.00 32.00 $67.76 92.74 CADD Operator 5 to 15 $25.00 26.00 $60.50 75.36 Junior CADD Operator 1 to 5 $20.00 23.00 $48.40 Senior Geologist 15+ $39.00 $94.38 Geologist 5 to 15 $30.00 $72.60 Senior Environmental Planner 15+ $55.00 $133.10 Environmental Planner IV 10 to 15 $45.50 $110.11 Environmental Planner III 5 to 10 $40.00 $96.80 Environmental Planner I/II 1 to 5 $30.50 $73.81 Senior Environmental Specialist 15+ $45.00 $108.90 Environmental Specialist 5 to 15 $30.50 $73.81 Junior Environmental Specialist 1 to 5 $26.00 $62.92 Senior Environmental Scientist 15+ $49.50 $119.79 Environmental Scientist IV 10 to 15 $42.00 $101.64 Environmental Scientist III 5 to 10 $34.00 $82.28 Environmental Scientist I/II 1 to 5 $29.00 $70.18 Senior Biologist 15+ $40.00 $96.80 Biologist IV 10 to 15 $33.00 $79.86 Biologist III 5 to 10 $30.00 $72.60 Biologist I/II 1 to 5 $28.50 $68.97 Senior Archeologist-Principal Investigator 15+ $41.00 $99.22 Archeologist IV 10 to 15 $35.00 $84.70 Archeologist III 5 to 10 $31.00 $75.02 Archeologist I/II 1 to 5 $27.00 $65.34 Senior Field Tech (Envrionmental, Biological, Archeological) 15+ $22.00 $53.24 Field Tech (Envrionmental, Biological, Archeological) 5 to 15 $17.00 $41.14 Senior Historian 15+ $32.00 $77.44 Historian IV 10 to 15 $30.20 $73.08 Historian III 5 to 10 $29.50 $71.39 Historian I/II 1 to 5 $27.00 $65.34 Senior Public Involvement Officer 15+ $42.00 $101.64 Public Involvement Officer 5 to 15 $35.00 $84.70 Senior Public Involvement Specialist 15+ $43.50 $105.27 Public Involvement Specialist 5 to 15 $33.00 $79.86 Junior Public Involvement Specialist 1 to 5 $24.50 $59.29 Senior Transportation Planner 15+ $35.00 $84.70 Transportation Planner IV 10 to 15 $32.75 $79.26 Transportation Planner III 5 to 10 $29.00 $70.18 Transportation Planner I/II 1 to 5 $20.00 $48.40 Senior Urban Planner 15+ $44.50 $107.69 Urban Planner IV 10 to 15 $39.00 $94.38 Urban Planner III 5 to 10 $33.50 $81.07 Urban Planner I/II 1 to 5 $31.00 $75.02 Environmental Inspector 5+ $32.00 $77.44 66.66 Admin/Clerical $18.00 21.00 $43.56 60.86 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15F04D8EFA-7DC2-24A84EDC-4715AAF6-A668-00F8B487D7CE Principal 20+ 887BB1F875D0 Admin/Clerical $67.00 22.00 $180.57 Senior Public Involvement Officer 15+ $49.12 $132.38 Public Involvement Officer 62.71 CADD Operator 5 to 15 $35.00 27.00 $94.33 Senior Public Involvement Specialist 15+ 76.96 Design Engineer 5 to 10 $41.66 40.00 $112.27 Public Involvement Specialist 114.02 Engineer Tech 5 to 15 $33.48 28.00 $90.23 Junior Public Involvement Specialist 79.81 Engineer-In-Training 1 to 5 $22.00 33.00 $59.29 Admin/Clerical $20.00 $53.90 Engineer Tech 94.06 GIS Operator $28.00 $75.46 79.81 GIS Technician $28.00 $79.81 Mobile LiDAR Processing Technician $35.00 $99.77 Project Coordinator - Mobile LiDAR $48.00 $136.82 Project Engineer 10 to 15 $47.00 $133.97 Quality Manager 10 to 20 $62.00 $176.73 RPLS - Project Manager 15+ $56.00 $159.62 RPLS - Task Leader 10 to 15 $48.00 $136.82 Senior CADD Operator 15+ $34.00 $96.91 Senior Engineer 15+ $60.00 $171.03 Senior Engineer Tech 15+ $36.00 $102.62 Senior Survey Tech (Must be Surveyor in Training (SIT), or have a minimum of five year's surveying experience) 5 to 10 $34.00 $96.91 Senior GIS Operator $34.00 $96.91 Senior Project Manager 20+ $72.50 $206.66 Senior Utilities Coordinator $50.00 $142.52 Survey Tech 1 to 5 $30.00 $85.51 Utilities Coordinator $36.00 $102.62 Senior Hydrologist 15+ $60.00 $171.03 Hydrologist 5 to 15 $45.00 $128.27 Abstractor (Property Deed Researcher, Courthouse or Internet research) $24.00 $68.41 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15F04D8EFA-7DC2-24A84EDC-4715AAF6-A668-00F8B487D7CE RPLS - 887BB1F875D0 Senior Project Manager 20+ $70.00 $193.49 Project Manager 10 to 20 $65.00 $179.67 Quality Manager 10 to 20 $58.00 $160.32 Senior Engineer 15+ $52.00 60.00 $141.24 RPLS - Task Leader 165.85 Senior Structural Engineer 15+ $65.00 $179.67 Structural Engineer 5 to 15 $58.00 $160.32 Project Engineer 10 to 15 $43.50 46.00 $118.16 Senior Survey Tech (Must be Surveyor in Training (SIT), or ha 127.15 Design Engineer 5 to 10 $32.50 42.00 $88.28 Survey 116.10 Engineer-In-Training 1 to 5 $34.00 $93.98 Senior Engineer Tech 15+ $32.00 $88.45 Engineer Tech 5 to 15 $25.00 $69.10 Junior Engineer Tech 1 to 5 $29.50 18.56 $80.13 51.30 Senior GIS CADD Operator 15+ $33.00 26.95 $89.64 GIS 74.49 CADD Operator 5 to 15 $29.00 22.50 $78.77 GIS Technician 62.19 Junior CADD Operator 1 to 5 $27.00 16.25 $73.34 44.92 Admin/Clerical $19.44 $52.80 Project Coordinator - Mobile LiDAR $43.00 $116.80 Mobile LiDAR Processing Technician $33.00 $89.64 Project Coordinator - AM $44.00 $119.51 Certified Photogrammetrist $36.00 $97.78 Analytical Triangulation Specialist $27.00 $73.34 Aerial Mapping Technician $25.06 $68.07 Orthophoto Specialist $24.00 $65.19 Mapping Editor (includes QA/QC, Finishing, & Finalization) $26.25 $71.30 Aerial Office Technician $20.00 $54.32 Project Coordinator - AP $40.75 $110.69 Aerial Processing Technician $29.75 $80.81 Project Coordinator - FWAL $40.50 $110.01 Airborne LiDAR Processing Technician $33.00 $89.64 Project Coordinator - HAL $40.50 $110.01 Helicopter LiDAR Processing Technician $31.50 $85.56 Photo Lab Specialist $20.25 $55.00 Photo Processing Technician $20.25 $55.00 55.28 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15F04D8EFA-7DC2-24A84EDC-4715AAF6-A668887BB1F875D0 Project Manager 10 to 20 $55.00 $149.71 Senior Engineer 15+ $54.00 $146.99 Project Engineer 10 to 15 $45.00 $122.49 Design Engineer 5 to 10 $40.00 $108.88 Engineer-00F8B487D7CE In-Training 1 to 5 $32.00 $87.11 Senior Engineer Tech 15+ $35.00 $95.27 Engineer Tech 5 to 15 $30.00 $81.66 Junior Engineer Tech 1 to 5 $24.00 $65.33 Senior CADD Operator 15+ $32.00 $87.11 CADD Operator 5 to 15 $26.00 $70.77 Junior CADD Operator 1 to 5 $20.50 $55.80 Admin/Clerical $22.00 $59.89 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: F04D8EFA-7DC2-4EDC-AAF6-887BB1F875D0 RPLS - Project Manager 15+ $55.00 $149.06 RPLS - Task Leader 10 to 15 $50.00 $135.51 Senior Survey Tech (Must be Surveyor in Training (SIT), or have a minimum of five year's surveying experience) 5 to 10 $35.00 $94.86 Survey Tech 1 to 5 $33.50 $90.79 Senior CADD Operator 15+ $34.25 $92.82 CADD Operator 5 to 15 $29.75 $80.63 Flagger $13.00 $35.23 Abstractor (Property Deed Researcher, Courthouse or Internet research) $27.00 $73.17 Admin/Clerical $23.00 $62.33 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: F04D8EFA-7DC2-4EDC-AAF6-887BB1F875D0 Project Manager 10 to 20 $65.00 $181.20 Project Engineer 10 to 15 $46.00 $128.23 Engineer-In-Training 1 to 5 $34.00 $94.78 Engineer Tech 5 to 15 $29.00 $80.84 Senior CADD Operator 15+ $34.00 $94.78 CADD Operator 5 to 15 $30.00 $83.63 Admin/Clerical $23.00 $64.12 Senior Engineer 15+ $60.00 $167.26 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: F04D8EFA-7DC2-4EDC-AAF6-887BB1F875D0 Project Manager 10 to 20 $160.14 Senior Public Involvement Officer 15+ $164.32 Public Involvement Officer 5 to 15 $116.92 Senior Public Involvement Specialist 15+ $90.75 Public Involvement Specialist 5 to 15 $72.60 Junior Public Involvement Specialist 1 to 5 $52.00 Senior GIS Operator 15+ $110.00 GIS Operator 5 to 15 $75.00 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: F04D8EFA-7DC2-4EDC-AAF6-887BB1F875D0 1 - Person Survey Crew (GPS and Robotic Total Stations included in indirect cost rate. Mileage not included.) hour $90.00 105.00 2 - Person Survey Crew (GPS and Robotic Total Stations included in indirect cost rate. Mileage not included.) hour $135.00 150.00 3 - Person Survey Crew (GPS and Robotic Total Stations included in indirect cost rate. Mileage not included.) hour $165.00 175.00 4 - Person Survey Crew (GPS and Robotic Total Stations included in indirect cost rate. Mileage not included.) hour $190.00 LiDAR Mobile Mapping System, (Includes Vehicle Operator, LiDAR Technician mileage on project and fuel) (Does not include travel to project.) day $6,500.00 Mobilization for Aerial Photography/LiDAR Fixed Wing Aircraft (Includes aircraft, Pilot, Camera/LiDAR Operator, fuel and transportation cost) Per Project $18,000.00 Aerial Photography Flight Crew Fixed Wing Aircraft (Includes Pilot and Camera Operator) hour $180.00 LiDAR Flight Crew Fixed Wing Aircraft (Includes Pilot and LiDAR Operator) hour $190.00 Mobilization for Helicopter Airborne LiDAR (Includes helicopter, Pilot, LiDAR Operator, fuel and transportation cost) Per Project $19,000.00 Helicopter Flight Crew Fixed Wing Aircraft (Includes Pilot and LiDAR Operator) hour $190.00 205.00 The unit costs shown include labor, overhead, and profit. Payment based on units completed. No partial payments. All unit costs are negotiated costs and are not subject to change or adjustment. Unit Cost Payment Basis: If unit costs by year are included, unit costs billed should correspond to the fiscal or calendar year, if applicable, in which the work was done. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15F04D8EFA-7DC2-24A84EDC-4715AAF6-A668-00F8B487D7CE Principal 20+ $76.00 $238.00 Senior Project Manager 20+ $74.00 $231.74 Project Manager 10 to 20 $62.00 $194.16 Quality Manager 10 to 20 $59.00 $184.76 Senior Engineer 15+ $60.00 $187.90 Project Engineer 10 to 15 $46.00 $144.05 Design Engineer 5 to 10 $40.00 $125.26 Engineer-In-Training 887BB1F875D0 1 to 5 $33.00 $103.34 Senior Engineer Tech 15+ $38.00 $119.00 Engineer Tech 5 to 15 $25.00 $78.29 Junior Engineer Tech 1 to 5 $21.00 $65.76 Senior CADD Operator 15+ $33.00 $103.34 CADD Operator 5 to 15 $30.00 $93.95 Junior CADD Operator 1 to 5 $21.00 $65.76 Senior Project Controller 15+ $35.50 $111.17 Project Controller 5 to 15 $30.00 $93.95 Public Involvement Specialist 5 to 15 $30.00 $93.95 Junior Public Involvement Specialist 1 to 5 $22.00 $68.89 Senior Utility Coordinator $47.00 $147.18 Utility Coordinator $36.00 $112.74 Contract rates include labor, overhead, - Person Survey Crew (GPS and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification Robotic Total Stations included in the contract, but indirect cost rate. Mileage not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15-24A8-4715-A668-00F8B487D7CE Mobilization/Demobilization mile $4.00 Level C and D. Includes labor and equipment for records research, CADD, and mapping. LF $0.44 Level B (Designation). Includes labor and equipment for records research, designating, engineering, surveying, and CADD. LF $1.30 Level A (Location, Test Holes). Includes labor and equipment for vacuum excavation, engineering, surveying, and CADD. 0 to 5 ft. each $950.00 > 5 to 8 ft. each $1,250.00 > 8 to 13 ft. each $1,550.00 > 13 to 20 ft. each $1,900.00 > 20 ft. VF over 20' $150.00 ▇▇▇ ▇▇▇▇▇ Services One (1included.) Designating Person with Equipment hour $120.00 ▇▇▇ ▇▇▇▇▇ Services Two 110.00 2 - Person Survey Crew (2GPS and Robotic Total Stations included in indirect cost rate. Mileage not included.) Designtating Person with Equipment hour $160.00 ▇▇▇ Quality Level B 3D Modeling Equipment SPAR Day 165.00 3 - Person Survey Crew (GPS and Robotic Total Stations included in indirect cost rate. Mileage not included.) hour $700.00 180.00 4 - Person Survey Crew (GPS and Robotic Total Stations included in indirect cost rate. Mileage not included.) hour $210.00 LiDAR Mobile Mapping System, (Includes Vehicle Operator, LiDAR Technician mileage on project and fuel) (Does not include travel to project.) day $8,000.00 LiDAR Mobile Mapping System,travel to project Mile $3.75 The unit costs shown include labor, overhead, and profit. Payment based on units completed. No partial payments. All unit costs are negotiated costs and are not subject to change or adjustment. Unit Cost Payment Basis: If unit costs by year are included, unit costs billed should correspond to the fiscal or calendar year, if applicable, in which the work was done. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15F04D8EFA-7DC2-24A84EDC-4715AAF6-A668-00F8B487D7CE Lodging/Hotel 887BB1F875D0 1 - Taxes Person Survey Crew (GPS and Fees day/person $25.00 Lodging/Hotel (Taxes/fees Robotic Total Stations included in indirect cost rate. Mileage not included) day/person Current State Rate Meals (Excluding alcohol & tips) (Overnight stay required) day/person Current State Rate Mileage mile Current State Rate SUV or ATV Rental (Includes taxes and fees; Insurance costs will not be reimbursed) day $110.00 Rental Car Fuel gallon $3.75 Rental Car (Includes taxes and fees; Insurance costs will not be reimbursed) day $52.00 Air Travel - In State - Short Notice (Coach) Rd Trip/person $350.00 Air Travel - In State - 2+ Wks Notice (Coach) Rd Trip/person Coach Fare $300.00 Air Travel - Out of State - 2+ Wks Notice (Coach) Rd Trip/person $450.00 Air Travel - Out of State - Short Notice (Coach) Rd Trip/person $650.00 Taxi/Cab fare each/person $29.00 Parking day $15.00 Toll Charges each $3.00 Standard Postage letter Current Postal Rate Certified Letter Return Receipt each Current Postal Rate Overnight Mail - letter size each Current Postal Rate Overnight Mail - oversized box each $30.00 Courier Services each $25.00 Photocopies B/W (11" X 17") each $0.20 Photocopies B/W (8 1/2" X 11") each $0.12 Photocopies Color (11" X 17") each $0.75 Photocopies Color (8 1/2" X 11") each $0.45 Digital Ortho Plotting sheet $1.40 Plots (B/W on Bond) per sq. ft. $0.50 Plots (Color on Bond) per sq. ft. $1.05 Plots (Color on Photographic Paper) per sq. ft. $4.00 Color Graphics on Foam Board square foot $4.00 Presentation Boards 30" X 40" Color Mounted each $80.00 Report Printing each $35.00 Report Binding and tabbing each $4.50 Reproduction of CD/DVD each $3.00 CDs each $1.00 4" X 6" Digital Color Print picture $0.25 Tx Parks & Wildlife Data Request Fees each $50.00 Hazardous Materials Database Search per search $300.00 Noise Meter Rental per project $57.00 Environmental Field Supplies (lathes, stakes, flagging, spray paint, etc.) day hour $30.00 Curator 100.00 2 - Person Survey Crew (Drawer & TX Archaeological Research Lab GPS and Robotic Total Stations included in indirect cost rate. Mileage not included.) hour $150.00 3 - Person Survey Crew (GPS and Robotic Total Stations included in indirect cost rate. Mileage not included.) hour $175.00 4 - Person Survey Crew (GPS and Robotic Total Stations included in indirect cost rate. Mileage not included.) hour $205.00 The unit costs shown include labor, overhead, and profit. Payment based on units completed. No partial payments. All unit costs are negotiated costs and are not subject to change or adjustment. Unit Cost Payment Basis: If unit costs by year are included, unit costs billed should correspond to the fiscal or calendar year, if applicable, in which the work was done. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for artifacts & report) per project $2,100.00 Newspaper Advertisement per publication $2,500.00 Court Reporter page $4.00 Court Reporter (Public Meetings, Hearings & Transcription) day $500.00 payment under that work authorization. DocuSign Envelope ID: 92042E15F04D8EFA-7DC2-24A84EDC-4715AAF6-A668-00F8B487D7CE Translator 887BB1F875D0 Volumetric Shrinkage ASTM D427 each $80.00 Standard ▇▇▇▇▇▇▇ Test ASTM D698 each $180.00 Modified ▇▇▇▇▇▇▇ Test ASTM D1557 each $190.00 Standard Penetration Test (English to SpanishSPT) ASTM D1586 LF $28.00 California Bearing Ratio (Single Sample without MD Curve) ASTM D1883 test $225.00 Unconfined Compressive Strength (Soil) ASTM D2166 each $50.00 Hydraulic Conductivity Permeability ASTM D2434 each $255.00 One Dimensional Consolidation Properties of Soil ASTM D2435 each $175.00 Unconfined Compressive Strength (Rock) ASTM D2938 each $70.00 Direct Shear Test of Soils Under Consolidated Drained Conditions ASTM D3080 set of 3 $1,150.00 Splitting Tensile of Intact Rock Core ASTM D3967 each $165.00 Water Stand Pipes ASTM D4043 LF $35.00 Calcium Carbonate Content of Soils ASTM D4373 each $125.00 Hydraulic Conductivity Permeability ASTM D4511 each $315.00 One Dimensional Swell, other language as appropriateMethods A & B ASTM D4546 each $85.00 One Dimensional Swell, or Sign LanguageMethod C ASTM D4546 each $110.00 Permeability of Silt and Clays ASTM D5084 each $325.00 Suction Test (Filter Method) for Public Involvement event ASTM D5298 each $400.00 Translator (English to Spanish, other language as appropriate, or Sign Language) hour 75.00 ▇▇▇▇▇▇▇▇▇▇ Type Piezometers N/A each $100.00 Custodian for Public Involvement hour40.00 ▇▇▇▇▇▇▇▇▇▇ Type Piezometers Installation N/custodian A each $700.00 Vibrating Wire Piezometer N/A each $750.00 Vibrating Wire Piezometer Installation N/A each $1,000.00 Soil Boring with SPT ASTM D1586 LF $30.00 Sound Technician for Public Involvement event Soil Boring/Rock Coring with TCP ( < 60 ft.) Tex-132-E LF $250.00 Public Involvement Facility Rental 38.00 Soil Boring/Rock Coring with TCP ( > 60 ft.) Tex-132-E LF $40.00 Soil Boring/Rock Coring without TCP ( < 60 ft.) N/A LF $34.00 Soil Boring /Rock Coring without TCP ( > 60 ft.) N/A LF $38.00 Soil Boring without TCP ( < 60 ft.): (estimatea) 4 hours Utlizing Continuous Sampler ASTM D1587 LF $750.00 Public involvement Facility Rental 32.00 (estimateb) 8 hours Shelby Push Tubes Extruded in Field ASTM D1587 LF $3,000.00 Public Involvement Facility Rental 27.00 (estimatec) hour Augering N/A LF $20.00 Core/drill operator/technician and coring equipment used to drill flexable and rigid pavment (2-man crew) N/A Trip $250.00 (a) 4-in. diameter cores N/A Inch $10.00 (b) 6-in. diameter cores N/A Inch $12.00 Determining Moisture Content in Soil Materials Tex-103-E each $10.00 Determining Liquid Limits of Soils Tex-104-E each $34.00 Determining Plastic Limit of Soils Tex-105-E each $34.00 Bar Linear Shrinkage of Fine Aggregate Tex-107-E each $28.00 Determining the Specific Gravity of Soils Tex-108-E each $34.00 Particle Size Analysis of Soils (Parts I & II) Tex-110-E each $47.00 Determining the Amount of Material in Soils Finer than the 75μm (No. 200) Sieve Tex-111-E each $30.00 Laboratory Compaction Characteristics and Moisture-Density Relationship of Base Materials Tex-113-E each $155.00 Laboratory Compaction Characteristics and Moisture-Density Relationship of Subgrade, Embankment Soils and Backfill Materials Tex-114-E each $150.00 Public Involvement Facility Rental event $800.00 Audio - Equipment Rental Ball Mill Method for Determining In-Place Density of Soils and Base Materials Tex-116-E each $300.00 Audio - Visual Equipment Rental event $250.00 Public Notices - Mass Mailing (500 pieces) per mailing $500.00 FEMA FIS (Manual) 150.00 Triaxial Compression for Disturbed Soils and Base Materials Tex-117-E each $5.00 FEMA FIS Backup Data Request each $300.00 FEMA Map Revision Submittal (CLOMR/LOMR) (Submittal Fee Only) each $5,000.00 FEMA Model/Floodplain Hardcopy each $250.00 Railroad - Flagger (Service provided by RR) hour $60.00 Railroad - Insurance in addition to STD Minimum Required (Minimum coverage of $1 Million required by RR.) each $3,500.00 Railroad - Permit [Note: Read and then delete this note. Most railroad companies charge a fee of $500 for the permit to access their property.] each $1,500.00 Railroad - Safety Training (If required - Heavy Rail Safety Training Certificate, includes classroom training and employee certification card.) Per Person $150.00 Traffic Control Services, Arrow Boards and Attenuator trucks - Large Project (Includes labor, equipment and fuel) day $2,800.00 Traffic Control Services, Arrow Boards and Attenuator trucks - Medium Project (Includes labor, equipment and fuel) day $2,000.00 Traffic Control Services, Arrow Boards and Attenuator trucks - Small Project (Includes labor, equipment and fuel) day $1,450.00 Attenuator trucks - (Lan1,650.00 DocuSign Envelope I

Appears in 1 contract

Sources: Contract for Engineering Services

Range of Cost Plus Fixed Fee. Actual wages must be within the allowable range shown on the Final Cost Proposal. DocuSign Envelope ID: 92042E154B321A07-24A866D3-47154DC1-A6688A8A-00F8B487D7CE C761600047C6 * The MAXIMUM AMOUNT PAYABLE is $4,567,940.05 The maximum amount payable is based on the following data and calculations: 5,000,000.00. * The maximum Maximum amount payable must be based on the contract scopenegotiated for each work authorization. The work authorization fee schedules will be derived from this attachment. Principal 20+ $75.00 $237.91 Senior Project Manager 20+ $75.00 73.00 $237.91 Project Manager 10 to 20 $62.00 $196.68 211.57 Quality Manager 10 to 20 $61.00 65.00 $193.50 188.39 Senior Engineer 15+ $55.00 62.75 $174.47 181.87 Project Engineer 10 to 15 $46.00 48.00 $145.92 139.12 Design Engineer 5 to 10 $40.00 43.00 $126.89 124.63 Engineer-In-Training 1 to 5 $33.00 34.00 $104.68 98.54 Senior Engineer Tech 15+ $37.00 34.00 $117.37 98.54 Engineer Tech 5 to 15 $30.00 27.00 $95.17 78.25 Junior Engineer Tech 1 to 5 $22.00 $69.79 63.76 Senior CADD Operator 15+ $33.00 32.00 $104.68 92.74 CADD Operator 5 to 15 $25.00 26.00 $79.30 75.36 Junior CADD Operator 1 to 5 $21.00 23.00 $66.62 66.66 Admin/Clerical $21.00 $66.62 60.86 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E154B321A07-24A866D3-47154DC1-A6688A8A-00F8B487D7CE Senior C761600047C6 Project Manager 20+ 10 to 20 $70.00 65.00 $224.83 204.03 Quality Manager 10 to 20 $60.00 $188.34 Senior Engineer 15+ $59.00 55.00 $189.50 172.64 Senior Structural Engineer 15+ $63.00 $197.75 Structural Engineer 5 to 15 $53.00 $166.36 Project Engineer 10 to 15 $47.00 44.00 $150.96 138.11 Design Engineer 5 to 10 $39.00 $125.26 Traffic Engineer 5 to 10 $48.00 $154.17 Traffic Engineer- Modeler/Analyst 5 to 10 $37.00 $118.84 122.42 Engineer-In-Training 1 to 5 $34.00 31.00 $109.20 97.31 Senior Engineer Tech 15+ $35.00 34.00 $112.42 106.72 Engineer Tech 5 to 15 $27.00 $86.72 84.75 Junior Engineer Tech 1 to 5 $18.56 20.00 $59.61 62.78 Senior CADD Operator 15+ $27.00 31.00 $86.72 97.31 CADD Operator 5 to 15 $22.50 25.00 $72.27 78.47 Junior CADD Operator 1 to 5 $19.00 22.50 $61.03 Senior Traffic Tech 15+ $30.00 $96.36 Traffic Tech 5 to 15 $25.00 $80.30 70.63 Admin/Clerical $15.00 20.50 $48.18 Sr. Travel Demand Modeler 15+ $54.00 $173.44 Sr Project Analyst 10+ $37.00 $118.84 Project Coordinator $30.00 $96.36 64.35 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E154B321A07-24A866D3-47154DC1-A6688A8A-00F8B487D7CE Principal 20+ $75.70 $183.19 C761600047C6 Senior Project Manager 20+ $69.75 72.00 $168.80 Project Manager 10 to 20 $62.00 $150.04 198.05 Quality Manager 10 to 20 $58.50 66.00 $141.57 181.54 Senior CADD Operator Engineer 15+ $28.00 66.00 $67.76 CADD Operator 5 181.54 Project Engineer 10 to 15 $25.00 50.00 $60.50 Junior CADD Operator 137.53 Design Engineer 5 to 10 $45.00 $123.78 Engineer-In-Training 1 to 5 $20.00 34.00 $48.40 93.52 Senior Geologist Engineer Tech 15+ $39.00 35.00 $94.38 Geologist 96.27 Engineer Tech 5 to 15 $30.00 $72.60 Senior Environmental Planner 15+ $55.00 $133.10 Environmental Planner IV 10 to 15 $45.50 $110.11 Environmental Planner III 5 to 10 $40.00 $96.80 Environmental Planner I/II 1 to 5 $30.50 $73.81 Senior Environmental Specialist 15+ $45.00 $108.90 Environmental Specialist 5 to 15 $30.50 $73.81 Junior Environmental Specialist 1 to 5 $26.00 $62.92 Senior Environmental Scientist 15+ $49.50 $119.79 Environmental Scientist IV 10 to 15 $42.00 $101.64 Environmental Scientist III 5 to 10 $34.00 $82.28 Environmental Scientist I/II 1 to 5 $29.00 $70.18 Senior Biologist 15+ $40.00 $96.80 Biologist IV 10 to 15 $33.00 $79.86 Biologist III 5 to 10 $30.00 $72.60 Biologist I/II 1 to 5 $28.50 $68.97 Senior Archeologist-Principal Investigator 15+ $41.00 $99.22 Archeologist IV 10 to 15 $35.00 $84.70 Archeologist III 5 to 10 $31.00 $75.02 Archeologist I/II 1 to 5 $27.00 $65.34 Senior Field Tech (Envrionmental, Biological, Archeological) 15+ $22.00 $53.24 Field Tech (Envrionmental, Biological, Archeological) 5 to 15 $17.00 $41.14 Senior Historian 15+ $32.00 $77.44 Historian IV 10 to 15 $30.20 $73.08 Historian III 5 to 10 $29.50 $71.39 Historian I/II 1 to 5 $27.00 $65.34 Senior Public Involvement Officer 15+ $42.00 $101.64 Public Involvement Officer 5 to 15 $35.00 $84.70 Senior Public Involvement Specialist 15+ $43.50 $105.27 Public Involvement Specialist 5 to 15 $33.00 $79.86 Junior Public Involvement Specialist 1 to 5 $24.50 $59.29 Senior Transportation Planner 15+ $35.00 $84.70 Transportation Planner IV 10 to 15 $32.75 $79.26 Transportation Planner III 5 to 10 $29.00 $70.18 Transportation Planner I/II 1 to 5 $20.00 $48.40 Senior Urban Planner 15+ $44.50 $107.69 Urban Planner IV 10 to 15 $39.00 $94.38 Urban Planner III 5 to 10 $33.50 $81.07 Urban Planner I/II 1 to 5 $31.00 $75.02 Environmental Inspector 5+ $32.00 $77.44 82.52 Admin/Clerical $18.00 23.50 $43.56 64.64 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E154B321A07-24A866D3-47154DC1-A6688A8A-00F8B487D7CE Principal 20+ C761600047C6 Project Manager 10 to 20 $67.00 55.00 $180.57 167.89 Senior Public Involvement Officer Engineer 15+ $49.12 50.00 $132.38 Public Involvement Officer 152.63 Project Engineer 10 to 15 $40.00 $122.10 Design Engineer 5 to 10 $34.00 $103.79 Engineer-In-Training 1 to 5 $31.00 $94.63 Senior Engineer Tech 15+ $31.00 $94.63 Engineer Tech 5 to 15 $35.00 25.00 $94.33 76.31 Junior Engineer Tech 1 to 5 $18.00 $54.95 Senior Public Involvement Specialist Geologist 15+ $41.66 38.00 $112.27 Public Involvement Specialist 116.00 Geologist 5 to 15 $33.48 32.00 $90.23 Junior Public Involvement Specialist 97.68 Geologist-In-Training 1 to 5 $22.00 31.00 $59.29 94.63 Admin/Clerical $20.00 $53.90 Engineer Tech $28.00 $75.46 61.05 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E154B321A07-24A866D3-47154DC1-A6688A8A-00F8B487D7CE C761600047C6 RPLS - Project Manager 15+ $52.00 51.50 $141.24 150.69 RPLS - Task Leader 10 to 15 $43.50 46.00 $118.16 134.60 Senior Survey Tech (Must be Surveyor in Training (SIT), or ha have a minimum of five year's surveying experience) 5 to 10 $32.50 34.00 $88.28 99.48 Survey Tech 1 to 5 $29.50 31.50 $80.13 Senior GIS Operator 92.17 Flagger $33.00 15.00 $89.64 GIS Operator 43.89 Abstractor (Property Deed Researcher, Courthouse or Internet research) $29.00 26.00 $78.77 GIS Technician $27.00 $73.34 76.08 Admin/Clerical $19.44 21.00 $52.80 61.45 Senior Utilities Coordinator $51.00 $149.23 Utilities Coordinator $41.00 $119.97 Senior Utilities Field Inspector $35.00 $102.41 Utilities Field Inspector $32.00 $93.63 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 4B321A07-66D3-4DC1-8A8A-C761600047C6 Project Coordinator - Mobile LiDAR Manager 10 to 20 $43.00 165.00 Public Involvement Officer 5 to 15 $116.80 Mobile LiDAR Processing Technician 125.00 Public Involvement Specialist 3 to 10 $33.00 100.00 Junior Public Involvement Specialist 1 to 3 $89.64 Project Coordinator - AM $44.00 $119.51 Certified Photogrammetrist $36.00 $97.78 Analytical Triangulation Specialist $27.00 $73.34 Aerial Mapping Technician $25.06 $68.07 Orthophoto Specialist $24.00 $65.19 Mapping Editor (includes QA/QC, Finishing, & Finalization) $26.25 $71.30 Aerial Office Technician $20.00 $54.32 Project Coordinator - AP $40.75 $110.69 Aerial Processing Technician $29.75 $80.81 Project Coordinator - FWAL $40.50 $110.01 Airborne LiDAR Processing Technician $33.00 $89.64 Project Coordinator - HAL $40.50 $110.01 Helicopter LiDAR Processing Technician $31.50 $85.56 Photo Lab Specialist $20.25 $55.00 Photo Processing Technician $20.25 60.00 Admin 1 to 10 $55.00 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E154B321A07-24A866D3-47154DC1-A6688A8A-00F8B487D7CE C761600047C6 1 - Person Survey Crew (GPS and Robotic Total Stations included in indirect cost rate. Mileage not included.) hour $90.00 110.00 2 - Person Survey Crew (GPS and Robotic Total Stations included in indirect cost rate. Mileage not included.) hour $135.00 160.00 3 - Person Survey Crew (GPS and Robotic Total Stations included in indirect cost rate. Mileage not included.) hour $165.00 190.00 4 - Person Survey Crew (GPS and Robotic Total Stations included in indirect cost rate. Mileage not included.) hour $190.00 204.00 LiDAR Mobile Mapping System, (Includes Vehicle Operator, LiDAR Technician mileage on project and fuel) (Does not include travel to project.) day $6,500.00 Mobilization for Aerial Photography/LiDAR Fixed Wing Aircraft (Includes aircraft, Pilot, Camera/LiDAR Operator, fuel and transportation cost) Per Project $18,000.00 Aerial Photography Flight Crew Fixed Wing Aircraft (Includes Pilot and Camera Operator) hour $180.00 LiDAR Flight Crew Fixed Wing Aircraft (Includes Pilot and LiDAR Operator) hour $190.00 Mobilization for Helicopter Airborne LiDAR (Includes helicopter, Pilot, LiDAR Operator, fuel and transportation cost) Per Project $19,000.00 Helicopter Flight Crew Fixed Wing Aircraft (Includes Pilot and LiDAR Operator) hour $190.00 8,000.00 The unit costs shown include labor, overhead, and profit. Payment based on units completed. No partial payments. All unit costs are negotiated costs and are not subject to change or adjustment. Unit Cost Payment Basis: If unit costs by year are included, unit costs billed should correspond to the fiscal or calendar year, if applicable, in which the work was done. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E154B321A07-24A866D3-47154DC1-A6688A8A-00F8B487D7CE Principal 20+ $76.00 $238.00 Senior Project Manager 20+ $74.00 $231.74 Project Manager 10 to 20 $62.00 $194.16 Quality Manager 10 to 20 $59.00 $184.76 Senior Engineer 15+ $60.00 $187.90 Project Engineer 10 to 15 $46.00 $144.05 Design Engineer 5 to 10 $40.00 $125.26 Engineer-In-Training 1 to 5 $33.00 $103.34 Senior Engineer Tech 15+ $38.00 $119.00 Engineer Tech 5 to 15 $25.00 $78.29 Junior Engineer Tech 1 to 5 $21.00 $65.76 Senior CADD Operator 15+ $33.00 $103.34 CADD Operator 5 to 15 $30.00 $93.95 Junior CADD Operator 1 to 5 $21.00 $65.76 Senior Project Controller 15+ $35.50 $111.17 Project Controller 5 to 15 $30.00 $93.95 Public Involvement Specialist 5 to 15 $30.00 $93.95 Junior Public Involvement Specialist 1 to 5 $22.00 $68.89 Senior Utility Coordinator $47.00 $147.18 Utility Coordinator $36.00 $112.74 Contract rates include labor, overhead, and profit. All rates are negotiated rates and are not subject to change or adjustment. Specified Rate Payment Basis - Contract rates to be billed. Documentation of hours must be maintained and is subject to audit. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E15-24A8-4715-A668-00F8B487D7CE Mobilization/Demobilization mile $4.00 Level C and D. Includes labor and equipment for records research, CADD, and mapping. LF $0.44 Level B (Designation). Includes labor and equipment for records research, designating, engineering, surveying, and CADD. LF $1.30 Level A (Location, Test Holes). Includes labor and equipment for vacuum excavation, engineering, surveying, and CADD. 0 to 5 ft. C761600047C6 Volumetric Shrinkage ASTM D427 each $950.00 > 5 to 8 ft. each $1,250.00 > 8 to 13 ft. each $1,550.00 > 13 to 20 ft. each $1,900.00 > 20 ft. VF over 20' $150.00 85.00 Standard ▇▇▇▇▇▇▇ Services One (1) Designating Person with Equipment hour Test ASTM D698 each $120.00 180.00 Modified ▇▇▇▇▇▇▇ Services Two Test ASTM D1557 each $190.00 Standard Penetration Test (2SPT) Designtating Person with Equipment hour ASTM D1586 LF $160.00 28.00 California Bearing Ratio (Single Sample without MD Curve) ASTM D1883 test $225.00 Unconfined Compressive Strength (Soil) ASTM D2166 each $50.00 Hydraulic Conductivity Permeability ASTM D2434 each $255.00 One Dimensional Consolidation Properties of Soil ASTM D2435 each $175.00 Unconfined Compressive Strength (Rock) ASTM D2938 each $75.00 Direct Shear Test of Soils Under Consolidated Drained Conditions ASTM D3080 set of 3 $850.00 Splitting Tensile of Intact Rock Core ASTM D3967 each $150.00 Water Stand Pipes ASTM D4043 LF $35.00 Calcium Carbonate Content of Soils ASTM D4373 each $100.00 Hydraulic Conductivity Permeability ASTM D4511 each $300.00 One Dimensional Swell, Methods A & B ASTM D4546 each $85.00 One Dimensional Swell, Method C ASTM D4546 each $110.00 Permeability of Silt and Clays ASTM D5084 each $325.00 Suction Test (Filter Method) ASTM D5298 each $75.00 ▇▇▇▇▇▇▇▇▇▇ Quality Level B 3D Modeling Equipment SPAR Day Type Piezometers N/A each $700.00 200.00 ▇▇▇▇▇▇▇▇▇▇ Type Piezometers Installation N/A each $300.00 Vibrating Wire Piezometer N/A each $750.00 Vibrating Wire Piezometer Installation N/A each $1,000.00 Soil Boring with SPT ASTM D1586 LF $30.00 Soil Boring/Rock Coring with TCP ( < 60 ft.) Tex-132-E LF $38.00 Soil Boring/Rock Coring with TCP ( > 60 ft.) Tex-132-E LF $40.00 Soil Boring/Rock Coring without TCP ( < 60 ft.) N/A LF $34.00 Soil Boring /Rock Coring without TCP ( > 60 ft.) N/A LF $38.00 Soil Boring without TCP ( < 60 ft.): (a) Utilizing Continuous Sampler ASTM D1587 LF $32.00 (b) Shelby Push Tubes Extruded in Field ASTM D1587 LF $25.00 (c) Augering N/A LF $18.00 Core/drill operator/technician and coring equipment used to drill flexible and rigid pavement (2-man crew) N/A Trip $250.00 (a) 4-in. diameter cores N/A Inch $10.00 (b) 6-in. diameter cores N/A Inch $12.00 Determining Moisture Content in Soil Materials Tex-103-E each $11.00 Determining Liquid Limits of Soils Tex-104-E each $35.00 Determining Plastic Limit of Soils Tex-105-E each $35.00 Bar Linear Shrinkage of Fine Aggregate Tex-107-E each $28.00 Determining the Specific Gravity of Soils Tex-108-E each $32.00 Particle Size Analysis of Soils (Parts I & II) Tex-110-E each $47.00 Determining the Amount of Material in Soils Finer than the 75µm (No. 200) Sieve Tex-111-E each $30.00 Laboratory Compaction Characteristics and Moisture-Density Relationship of Base Materials Tex-113-E each $150.00 Laboratory Compaction Characteristics and Moisture-Density Relationship of Subgrade, Embankment Soils and Backfill Materials Tex-114-E each $145.00 Ball Mill Method for Determining In-Place Density of Soils and Base Materials Tex-116-E each $145.00 Triaxial Compression for Disturbed Soils and Base Materials Tex-117-E each $1,550.00 DocuSign Envelope ID: 4B321A07-66D3-4DC1-8A8A-C761600047C6 Soil-Cement Testing Tex-120-E each $235.00 Soil-Lime Testing (4 points) Tex-121-E each $245.00 Determining Soil pH Tex-128-E each $17.00 Measuring the Resistivity of Soil Materials Tex-129-E each $50.00 Slurry Testing Tex-130-E each $27.00 Texas Cone Penetration Tex-132-E each $18.00 Non-Destructive Deflection Testing Dynaflect day $2,000.00 Falling Weight Deflection (FWD) day $2,300.00 Heavy Weight Deflection (HWD) day $2,450.00 The unit costs shown include labor, overhead, and profit. Payment based on units completed. No partial payments. All unit costs are negotiated costs and are not subject to change or adjustment. Unit Cost Payment Basis: If unit costs by year are included, unit costs billed should correspond to the fiscal or calendar year, if applicable, in which the work was done. Note: Any direct labor, unit cost, or other direct expense classification included in the contract, but not in a work authorization, is not eligible for payment under that work authorization. DocuSign Envelope ID: 92042E154B321A07-24A866D3-47154DC1-A6688A8A-00F8B487D7CE LodgingC761600047C6 Mobilization/Hotel - Taxes Demobilization mile $4.50 Level C and Fees day/person D. Includes labor and equipment for records research, CADD, and mapping. LF $25.00 Lodging/Hotel 0.75 Level B (Taxes/fees not included) day/person Current State Rate Meals Designation). Includes labor and equipment for records research, designating, engineering, surveying, and CADD. LF $1.60 Level A (Excluding alcohol & tips) (Overnight stay required) day/person Current State Rate Mileage mile Current State Rate SUV or ATV Rental (Location, Test Holes). Includes taxes labor and fees; Insurance costs will not be reimbursed) day $110.00 Rental Car Fuel gallon $3.75 Rental Car (Includes taxes equipment for vacuum excavation, engineering, surveying, and fees; Insurance costs will not be reimbursed) day $52.00 Air Travel - In State - Short Notice (Coach) Rd Trip/person $350.00 Air Travel - In State - 2+ Wks Notice (Coach) Rd Trip/person Coach Fare $300.00 Air Travel - Out of State - 2+ Wks Notice (Coach) Rd Trip/person $450.00 Air Travel - Out of State - Short Notice (Coach) Rd Trip/person $650.00 Taxi/Cab fare each/person $29.00 Parking day $15.00 Toll Charges CADD. 0 to 5 ft. each $3.00 Standard Postage letter Current Postal Rate Certified Letter Return Receipt each Current Postal Rate Overnight Mail - letter size each Current Postal Rate Overnight Mail - oversized box 1,085.00 > 5 to 8 ft. each $30.00 Courier Services 1,485.00 > 8 to 13 ft. each $25.00 Photocopies B/W (11" X 17") 1,800.00 > 13 to 20 ft. each $0.20 Photocopies B/W (8 1/2" X 11") each $0.12 Photocopies Color (11" X 17") each $0.75 Photocopies Color (8 1/2" X 11") each $0.45 Digital Ortho Plotting sheet $1.40 Plots (B/W on Bond) per sq. ft. $0.50 Plots (Color on Bond) per sq. ft. $1.05 Plots (Color on Photographic Paper) per sq. ft. $4.00 Color Graphics on Foam Board square foot $4.00 Presentation Boards 30" X 40" Color Mounted each $80.00 Report Printing each $35.00 Report Binding and tabbing each $4.50 Reproduction of CD/DVD each $3.00 CDs each $1.00 4" X 6" Digital Color Print picture $0.25 Tx Parks & Wildlife Data Request Fees each $50.00 Hazardous Materials Database Search per search $300.00 Noise Meter Rental per project $57.00 Environmental Field Supplies (lathes, stakes, flagging, spray paint, etc.) day $30.00 Curator (Drawer & TX Archaeological Research Lab for artifacts & report) per project $2,100.00 Newspaper Advertisement per publication $2,500.00 Court Reporter page $4.00 Court Reporter (Public Meetings, Hearings & Transcription) day $500.00 DocuSign Envelope ID: 92042E15-24A8-4715-A668-00F8B487D7CE Translator (English to Spanish, other language as appropriate, or Sign Language) for Public Involvement event $400.00 Translator (English to Spanish, other language as appropriate, or Sign Language) hour $100.00 Custodian for Public Involvement hour/custodian $30.00 Sound Technician for Public Involvement event $250.00 Public Involvement Facility Rental (estimate) 4 hours $750.00 Public involvement Facility Rental (estimate) 8 hours $3,000.00 Public Involvement Facility Rental (estimate) hour $150.00 Public Involvement Facility Rental event $800.00 Audio - Equipment Rental each $300.00 Audio - Visual Equipment Rental event $250.00 Public Notices - Mass Mailing (500 pieces) per mailing $500.00 FEMA FIS (Manual) each $5.00 FEMA FIS Backup Data Request each $300.00 FEMA Map Revision Submittal (CLOMR/LOMR) (Submittal Fee Only) each $5,000.00 FEMA Model/Floodplain Hardcopy each $250.00 Railroad - Flagger (Service provided by RR) hour $60.00 Railroad - Insurance in addition to STD Minimum Required (Minimum coverage of $1 Million required by RR.) each $3,500.00 Railroad - Permit [Note: Read and then delete this note. Most railroad companies charge a fee of $500 for the permit to access their property.] each $1,500.00 Railroad - Safety Training (If required - Heavy Rail Safety Training Certificate, includes classroom training and employee certification card.) Per Person $150.00 Traffic Control Services, Arrow Boards and Attenuator trucks - Large Project (Includes labor, equipment and fuel) day $2,800.00 Traffic Control Services, Arrow Boards and Attenuator trucks - Medium Project (Includes labor, equipment and fuel) day $2,000.00 Traffic Control Services, Arrow Boards and Attenuator trucks - Small Project (Includes labor, equipment and fuel) day $1,450.00 Attenuator trucks - (Lan2,350.00

Appears in 1 contract

Sources: Contract for Engineering Services