Ratio of Mobilization and Demobilization Clause Samples

Ratio of Mobilization and Demobilization. Forty percent (40%) of the lump sum price will be paid to the Contractor upon completion of mobilization of the dredge to the Work Area and installation of any mooring facilities or apparatus in the pump-out area(s) and installation of the sediment pipeline within a conveyance corridor. Twenty percent (20%) of the lump sum price will be paid to the Contractor upon commencement of beach and dune fill sediment placement of a quantity of, at a minimum, six thousand (6.000) cubic yards of sediment within the fill template in a twenty-four (24) hour period (or less time). The remaining forty percent (40%) of the lump sum price will be paid to the Contractor upon completion and acceptance of demobilization from the Work Area.

Related to Ratio of Mobilization and Demobilization

  • Mobilization Design-Builder shall mobilize, transport and assemble its equipment, materials, and supplies, as well as construct such temporary systems as are necessary and required at the Site, all in adequate time for satisfactory performance of the Work.

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • Completion of Concrete Pours and Emergency Work (a) Except as provided in this sub-clause an Employee shall nor work or be required to work in the rain. (b) Employees shall not be required to start a concrete pour in Inclement Weather. (c) Where a concrete pour has been commenced prior to the commencement of a period of Inclement Weather Employees may be required to complete such concrete pour to a practical stage and for such work shall be paid at the rate of double time calculated to the next hour, and in the case of wet weather shall be provided with adequate wet weather gear. (d) If an Employee’s clothes become wet as a result of working in the rain during a concrete pour the Employee shall, unless the Employee has a change of dry working clothes available, be allowed to go home without loss of pay. (e) The provisions of clauses 32.7(c) and 32.7(d) hereof shall also apply in the case of emergency work where the Employees concerned and their delegates agree that the work is of an emergency nature and can start and/or proceed.

  • Information Systems Acquisition Development and Maintenance a. Client Data – Client Data will only be used by State Street for the purposes specified in this Agreement.

  • Construction Phase Fee Contractor’s Construction Phase Fee is the maximum amount payable to Contractor for any cost or profit expectation incurred in the performance of the Work that is not specifically identified as being eligible for reimbursement by Owner elsewhere in this Agreement. References in the UGSC to Contractor’s “overhead” and “profit” mean Contractor’s Construction Phase Fee. The Construction Phase Fee includes, but is not limited to, the following items: 9.1 All profit, profit expectations and costs associated with profit sharing plans such as personnel bonuses, incentives, and rewards; company stock options; or any other like expenses of Contractor.