Re-connection. Any temporary disconnection pursuant this Section 7.1 shall continue only for so long as is reasonably necessary. The Generator and the EDC shall cooperate with each other to restore the Facility and the EPS, respectively, to their normal operating states as soon as reasonably practicable following the correction of the event that led to the temporary disconnection.