Reactive Supply and Voltage Control from Generation Sources Clause Samples

Reactive Supply and Voltage Control from Generation Sources. (Pursuant to Schedule 2 of the Tariff)
Reactive Supply and Voltage Control from Generation Sources. Service: The rates and/or methodology are described in Schedule 2.
Reactive Supply and Voltage Control from Generation Sources. Service In order to maintain transmission voltage on Tucson's transmission facilities within acceptable limits, generation facilities (in the Control Area where Tucson's transmission facilities are located) are operated to produce (or absorb) reactive power. Thus, Reactive Supply and Voltage Control from Generation Sources Service must be provided for each transaction on Tucson's transmission facilities. Tucson shall provide Reactive Supply and Voltage Control from Generation Sources Service pursuant to its Open Access Tariff at the charges provided in its most currently filed Open Access Tariff.
Reactive Supply and Voltage Control from Generation Sources 

Related to Reactive Supply and Voltage Control from Generation Sources

  • Reactive Power and Primary Frequency Response 9.6.1 Power Factor Design Criteria

  • Real and Reactive Power Control and Primary Frequency Response 9.5.1 Power Factor Design Criteria.

  • COMMERCIAL REUSE OF SERVICES The member or user herein agrees not to replicate, duplicate, copy, trade, sell, resell nor exploit for any commercial reason any part, use of, or access to 's sites.

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where Freedom has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to Freedom. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for Freedom (e.g. hairpinning): 1. Roll the circuit(s) from the IDLC to any spare copper that exists to the customer premises. 2. Roll the circuit(s) from the IDLC to an existing DLC that is not integrated. 3. If capacity exists, provide "side-door" porting through the switch. 4. If capacity exists, provide "Digital Access Cross Connect System (DACS)- door" porting (if the IDLC routes through a DACS prior to integration into the switch). 2.6.2 Arrangements 3 and 4 above require the use of a designed circuit. Therefore, non- designed Loops such as the SL1 voice grade and UCL-ND may not be ordered in these cases. 2.6.3 If no alternate facility is available, and upon request from Freedom, and if agreed to by both Parties, BellSouth may utilize its Special Construction (SC) process to determine the additional costs required to provision facilities. Freedom will then have the option of paying the one-time SC rates to place the Loop.

  • Non-Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the high-side of the generator substation at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established a different power factor range that applies to all similarly situated non-synchronous generators in the control area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice. This power factor range standard shall be dynamic and can be met using, for example, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors, or a combination of the two. This requirement shall only apply to newly interconnecting non-synchronous generators that have not yet executed a Facilities Study Agreement as of September 21, 2016.